1、<p><b> 目 錄</b></p><p> 第一部分 工程說明 ·························
2、··················· 1</p><p> 第二部分 計算說明 ···········
3、83;································ 2</p><p>
4、一、土方調(diào)配及運距計算 ··································
5、3;··· 2</p><p> 二、施工組織方案 ···························
6、3;················ 2</p><p> 三、項目的劃分 ···············
7、;······························· 3</p><p> 1、劃分項目的注
8、意事項 ····································
9、·· 3</p><p> 2、劃分的項目 ·····························&
10、#183;················ 3</p><p> 四、主要工程數(shù)量計算 ·············
11、3;··························· 4</p><p> 1、臨時工程的工程量計算 ···
12、································ 4</p><p> 2
13、、路基的工程量計算 ···································
14、···· 5</p><p> 3、路面的工程量計算 ··························
15、83;············· 5</p><p> 4、公路設(shè)施及預(yù)埋管線工程量計算 ················&
16、#183;··········· 6</p><p> 5、橋涵工程量計算···················&
17、#183;························ 7 </p><p> 6.占地面積 ······&
18、#183;····································
19、;···8</p><p> 五.縱橫軟件計算····························&
20、#183;···················8</p><p><b> 六.計算報表 </b></p><p> ····
21、3;····································
22、183;·····18</p><p> 七.設(shè)計體會··························
23、;······················ 19</p><p> 八.參考資料·········&
24、#183;····································
25、;·· 20</p><p> 第一部分 工程說明</p><p><b> ?。ㄒ唬┕こ谈艣r:</b></p><p> 1、本工程是刁鎮(zhèn)南至繡惠鎮(zhèn)公路新建工程的一部分,起止樁號為K2+500—K3+500,本工程全線按二級公路標(biāo)準(zhǔn)設(shè)計。計算行車速度80Km/h。路面設(shè)計標(biāo)準(zhǔn)軸載:100KN。橋涵寬度:與路基同寬,
26、橋涵設(shè)計荷載:見施工圖。</p><p> 基工程:本工程路基寬度為12m,路幅組成如下:行車道寬度:2×3.75 米,硬路肩:2×1.5米,土路肩:2×0.75米,公路的占地:填方路基為兩側(cè)邊溝或排水溝外側(cè)1.0m,挖方路基為坡頂或各截水溝外側(cè)1.0m。</p><p><b> 橋梁見施工圖。</b></p><
27、;p> 路面工程:路面結(jié)構(gòu)層面層采用:細(xì)粒式瀝青混凝土3 cm,中粒式瀝青混凝土5 cm,基層采用石灰粉煤灰穩(wěn)定碎石(18cm),底基層采用石灰粉煤灰土(36cm).</p><p><b> 路基路面排水:</b></p><p> 路基排水:邊溝和截水溝。</p><p> 路面排水:行車道和硬路肩橫坡為2%,土路肩為3%。&
28、lt;/p><p><b> 6、工程建設(shè)其他費</b></p><p> ?。?)土地補償:單價6500元/畝。(2)建設(shè)工期為6個月</p><p> 7、人工單價55元/工日。</p><p> ?。ǘ┚幹剖┕そM織設(shè)計的原則:</p><p> 1.嚴(yán)格執(zhí)行基本建設(shè)程序和施工程序的原則;
29、 2.科學(xué)安排施工順序的原則; 3.采用先進(jìn)的施工技術(shù)和設(shè)備的原則;</p><p> 4.應(yīng)用科學(xué)的計劃方法制定最合理的施工組織方案的原則; 5.落實季節(jié)性施工的措施,確保全年連續(xù)施工的原則; 6.確保工程質(zhì)量和施工安全的原則; 7.節(jié)約基建費用,降低工程成本的原則。</p><p> 第二部分 計算說明</p><p><b&g
30、t; 一、土方調(diào)配 </b></p><p> ?、倬徒茫詼p少運量:</p><p> 在半填半挖斷面中,應(yīng)首先考慮在本路段內(nèi)移挖作填進(jìn)行橫向平衡,然后再作縱向調(diào)配,以減少總的運輸量。</p><p> ②不跨溝調(diào)運:土石方調(diào)配應(yīng)考慮橋涵位置對施工運輸?shù)挠绊?,一般大溝不作跨越調(diào)運。</p><p><b>
31、 ?、鄹呦虻驼{(diào)運:</b></p><p> 應(yīng)注意施工的可能與方便,盡可能避免和減少上坡運土;位于山坡上的回頭曲線段優(yōu)先考慮上線向下線的土方豎向調(diào)運。</p><p> ?、芙?jīng)濟(jì)合理性: 應(yīng)進(jìn)行遠(yuǎn)運利用與附近借土的經(jīng)濟(jì)比較(移挖作填與借土費用的比較)。為使調(diào)配合理,必須根據(jù)地形情況和施工條件,選用適當(dāng)?shù)倪\輸方式,確定合理的經(jīng)濟(jì)運距,用以分析工程用土是調(diào)運還是外借。&
32、#160;土方調(diào)配“移挖作填”固然要考慮經(jīng)濟(jì)運距問題,但這不是唯一的指標(biāo),還要綜合考慮棄方或借方占地,賠償青苗損失及對農(nóng)業(yè)生產(chǎn)影響等。有時移挖作填雖然運距超出一些:運輸費用可能稍高一些,但如能少占地,少影響農(nóng)業(yè)生產(chǎn),這樣,對整體來說也未必是不經(jīng)濟(jì)的。</p><p> ?、莶煌耐练胶褪綉?yīng)根據(jù)工程需要分別進(jìn)行調(diào)配,以保證路基穩(wěn)定和人工構(gòu)造物的材料供應(yīng)。</p><p> ⑥土方調(diào)配對于
33、借土和棄土應(yīng)事先同地方商量,妥善處理。借土應(yīng)結(jié)合地形、農(nóng)田規(guī)劃等選擇借土地點,并綜合考慮借土還田,整地造田等措施。棄土應(yīng)不占或少占耕地,在可能條件下宜將棄土平整為可耕地,防止亂棄亂堆,或堵塞河流,損壞農(nóng)田。</p><p><b> 二、施工組織方案</b></p><p><b> 1.路基基底處理</b></p><p
34、><b> (1)表土清除</b></p><p> 由于基地的表層土為腐質(zhì)土,所以用推土機將表層上的土清除,清除厚度為25cm,對換土進(jìn)行分層壓實,壓實厚度符合規(guī)范要求。</p><p><b> (2)坡面基地處理</b></p><p> 為防止路基沿坡面滑動失穩(wěn),當(dāng)坡度在1:10~1:5時,只需將坡面
35、上的樹、草等雜物清除后,將翻松的坡面土層壓實后進(jìn)行路基填筑。 </p><p> ?。?)路基填筑材料的選擇</p><p> 按照就地取材、少占耕地的原則,采用集中取土的方法。</p><p><b> ?。?)路基填筑</b></p><p> ①填筑時按照橫斷面全寬分成水平層次,逐層向上填筑</p>
36、<p> ?、谕谅返谈鶕?jù)設(shè)計段面分層填筑、壓實。采用機械壓實一般不超過30cm,填筑至路床頂面最后一層最小的壓實厚度不小于8cm。</p><p><b> ?。?)路基防護(hù)</b></p><p> 原則:在經(jīng)濟(jì)合理、技術(shù)可行的條件下擬定防護(hù)方案,并貫徹環(huán)境保護(hù)、綠化的思想。</p><p><b> 采用方案:&
37、lt;/b></p><p> ?、俾坊吰绿钔粮叨菻≥4米時,采用漿砌片石拱防護(hù),拱圈內(nèi)種植草,其他用草防護(hù)。②池塘及易積水的地段,邊坡采用0.4米厚的漿砌片石護(hù)拱,保護(hù)到常水位以上0.5米。</p><p> 2.路面結(jié)構(gòu)施工方法</p><p> ?。?)石灰粉煤灰土底基層的施工(路拌法)</p><p><b>
38、 施工工藝流程:</b></p><p><b> 路拌→鋪筑→碾壓</b></p><p> ?。?)石灰粉煤灰穩(wěn)定碎石基層施工</p><p> 廠拌→運輸→攤鋪→碾壓</p><p><b> ?。?)攤鋪透層</b></p><p> (4)瀝青混凝
39、土面層施工</p><p> 廠拌→運輸→攤鋪→碾壓</p><p><b> 三.項目的劃分</b></p><p> ?。ㄒ唬﹦澐猪椖孔⒁馐马?</p><p> ?、眹?yán)格執(zhí)行基本建設(shè)程序和施工順序</p><p> 嚴(yán)格遵守合同簽訂的或者上級下達(dá)的施工期限,按照基建程序和施工程序的要求
40、,保質(zhì)保量的完成施工任務(wù)。</p><p><b> ⒉科學(xué)安排施工順序</b></p><p> 按照公路工程施工的客觀規(guī)律安排施工順序。</p><p> ⒊采用先進(jìn)的施工技術(shù)和設(shè)備</p><p> 在條件允許的情況下盡可能的采用先進(jìn)的施工順序和施工技術(shù),不斷提高施工機械化、預(yù)制裝配化程度,減輕勞動強度,提
41、高勞動生產(chǎn)率。</p><p> ?、磻?yīng)用科學(xué)的計劃方法制定最合理的施工組織方案</p><p> 根據(jù)工期特點和工期要求,因地制宜的采用快速施工,盡可能的采用流水施工方法,組織連續(xù)、均勻、有節(jié)奏的施工,保證人力物力充分發(fā)揮作用。</p><p> ?、德鋵嵓竟?jié)性施工的措施,確保全年施工</p><p> 貫徹施工技術(shù)規(guī)范,操作規(guī)程,提出
42、卻恰當(dāng)?shù)陌才哦昙镜氖┕ろ椖?,增加全年連續(xù)施工天數(shù),應(yīng)把那些確有必要的而又不因冬雨季施工而帶來造價提高的技術(shù)復(fù)雜的工程列入冬雨季施工,全面平衡施工人數(shù),材料的需要量,提高施工均衡性。</p><p> ?、洞_保工程質(zhì)量和施工安全</p><p> 確保工程質(zhì)量的技術(shù)措施和施工安全措施,尤其是采用國內(nèi)外施工新技術(shù)和本單位較生疏的新工藝時應(yīng)該注意。</p><p>
43、?、饭?jié)約基建費用,降低工程成本</p><p> 合理布置施工平面圖,節(jié)約施工用地,充分利用既有措施,盡量減少臨時性措施和費用,盡量利用當(dāng)?shù)刭Y源減少物資運輸量,盡量避免材料二次搬運,正確選擇運輸工具,以節(jié)約能源,降低運輸成本提高經(jīng)濟(jì)效益。</p><p><b> ?。ǘ﹦澐值捻椖?lt;/b></p><p> 1.臨時工程:汽車便道、臨時
44、便橋、臨時電力線路</p><p><b> 2.路基工程:</b></p><p> ?。?)場地清理:清除表土</p><p> (2)挖方;挖路基土方</p><p> ?。?)填方;本樁利用、借土方填筑</p><p><b> 3.路面工程:</b><
45、;/p><p> ?。?)底基層:路拌石灰粉煤灰土36cm</p><p> (2)基層:石灰粉煤灰穩(wěn)定碎石基層18cm</p><p> 廠拌基層穩(wěn)定土混合料(水泥穩(wěn)定砂礫碎石)</p><p> 廠拌基層穩(wěn)定土混合料運輸</p><p> 機械鋪裝廠拌基層穩(wěn)定土混合料</p><p>
46、 基層穩(wěn)定土廠拌設(shè)備安裝、拆除</p><p> ?。?)透層、黏層、封層;透層</p><p> ?。?)面層:A、中粒式瀝青混凝土面層</p><p> 瀝青混凝土混合料拌合</p><p> 瀝青混凝土混合料運輸</p><p> 瀝青混凝土混合料路面鋪裝</p><p> 瀝青混
47、凝土拌合設(shè)備安裝拆除</p><p> B、細(xì)粒式瀝青混凝土面層</p><p> 瀝青混凝土混合料拌合</p><p> 瀝青混凝土混合料運輸</p><p> 瀝青混凝土混合料路面鋪裝</p><p> 瀝青混凝土拌合設(shè)備安裝拆除</p><p><b> 4. 橋涵工
48、程:</b></p><p> 小橋工程 (混凝土空心板橋)</p><p><b> ?。?)上部結(jié)構(gòu)</b></p><p><b> 預(yù)制板</b></p><p><b> 橋面鋪裝</b></p><p><b>
49、 橋面連續(xù)</b></p><p><b> 欄桿</b></p><p><b> 伸縮縫</b></p><p><b> 支座</b></p><p><b> ?。?)下部結(jié)構(gòu)</b></p><p>
50、 橋墩:墩帽 墩身 基礎(chǔ)</p><p> 橋臺: 臺帽 臺身 基礎(chǔ)</p><p><b> ?。?)附屬工程</b></p><p><b> 橋頭搭板</b></p><p><b> 錐坡 泄水管</b></p><p&g
51、t;<b> 四.工程量的計算</b></p><p> 1.臨時工程工程量的計算</p><p> 臨時道路:修建路基寬為4.5米,路面3.5米,其長度為1.5km。</p><p> 臨時便橋:修建汽車三跨剛便橋,橋面凈寬6m,跨徑30m。</p><p> 臨時電力線路:線路中點距水泥穩(wěn)定混合料拌合站所在
52、樁號1km,拌合站距離路線1km, 則兩點之間的直線距離為Q=2.24Km。</p><p> 2.路基工程 選土場樁號K3+000,距離路線1.2km</p><p> 2.1清除表土(清除表土厚25cm)</p><p> 土基頂面寬度為:12+2*1.5*(0.08+0.18+0.36)=13.86m。</p><p>
53、<b> 為求清表寬度</b></p><p> 0.5*(13.86+2*1.5h+13.86)*h*1000=28978.4 </p><p><b> 解得h=1.76</b></p><p><b> 則清表寬度為</b></p><p> 13.86+2*
54、1.5*1.76=19.14m</p><p> Q=19.14*0.25*1000=4785</p><p><b> 2.2挖方:</b></p><p> 推土機推土方,由路基土石方計算表計算工程量為:</p><p><b> Q=2270</b></p><p&
55、gt;<b> 2.3填方:</b></p><p><b> ?。?)本樁利用方</b></p><p> 壓實方與天然密實方等效換算系數(shù)為1.16</p><p> 那么,有1834.9/1.16=1581.81(壓實方)</p><p> 機械碾壓路基=1581.81</p>
56、;<p><b> ?。?)外借土方</b></p><p> 挖掘機挖土Q=(3346.7+8724.6+15072.2)*1.16=31486.46 (天然密實方) </p><p> 自卸汽車運土方:換算系數(shù)增加0.03的土方運輸損耗</p><p> 則Q=(3346.7+8724.6+15072.2)*1.19=3
57、2300.77 (天然密實方)</p><p> 加權(quán)平均運距=1.786Km</p><p> 機械碾壓路基Q=31486.46 (天然密實方)</p><p><b> 3.路面工程</b></p><p> 3.1石灰粉煤灰土底基層(路拌法厚36cm)</p><p> 寬度為2*
58、3.75+2*1.5+2*0.1+2*0.15+2*0.15+2*0.18+0.36=12.02m</p><p> Q=12.02*1000*0.36=4327.2</p><p> 3.2石灰粉煤灰穩(wěn)定碎石基層(廠拌法,后18cm)</p><p> 寬度為:2*3.75+2*1.5+2*0.1+2*0.15+0.18=11.18m</p>
59、<p> Q=11.18*1000=11180</p><p> 運輸Q=11180*0.18=2012.4</p><p> 鋪筑:Q=2012.4 </p><p> 水泥穩(wěn)定土拌合站的安裝與拆除:選拌合站1/5座</p><p> 3.3中粒式瀝青混凝土面層(厚5cm)</p><p>
60、; 拌合:Q=(2*3.75+2*1.5)*1000*0.05=525</p><p> 運輸:Q=(2*3.75+2*1.5)*1000*0.05=525</p><p> 鋪筑:Q=(2*3.75+2*1.5)*1000*0.05=525</p><p> 瀝青混合料拌合站的安裝與拆除:選拌合站1/10座。</p><p> 3
61、.4細(xì)粒式瀝青混凝土面層(厚3cm)</p><p> 拌合:Q=(2*3.75+2*1.5)*1000*0.03=315</p><p> 運輸:Q=(2*3.75+2*1.5)*1000*0.03=315</p><p> 鋪筑:Q=(2*3.75+2*1.5)*1000*0.03=315</p><p> 3.5乳化瀝青透層Q=
62、(2*3.75+2*1.5+0.1*2+0.15*2)*1000=11000</p><p><b> 3.6 培路肩</b></p><p> 厚度: 3cm+5cm+18cm+36cm=62cm=0.62 m</p><p> Q =[(0.62*1.5+1.5+0.75)+(1.5+0.75)]*1000*2/2=5.43(1000
63、m3)</p><p> 路緣石 (寬 10cm, 高 20cm)</p><p> 工程量為Q=2*0.1*0.2*1000=40m3</p><p> 4 橋梁涵洞工程</p><p> 根據(jù)橋梁全橋工程量匯總表計算各項目的工程量。</p><p><b> 4.1 上部結(jié)構(gòu)</b&g
64、t;</p><p> 1)預(yù)制、安裝預(yù)應(yīng)力空心板</p><p> C30混凝土 Q=58.56 m3</p><p> ?、窦変摻?Q=3946.1kg</p><p> ?、蚣変摻?Q=9506.8kg</p><p> 橋面鋪裝 此項計入橋面連續(xù)</p><p> C
65、40混凝土 Q=30.81m3</p><p> ?、窦変摻?Q=2540.7kg</p><p><b> 3)欄桿</b></p><p> C25混凝土 Q=15.12 m3</p><p> ?、窦変摻?Q=71.58kg</p><p> Ⅱ級鋼筋 Q=2026.38k
66、g</p><p> 鋼材 Q=71.28kg</p><p> D80×4鋼管 Q=450.48kg</p><p> 工形鋼100×80×326.5 Q=258.48kg</p><p> 鑄鋼支架 Q=124.2kg</p><p> 螺栓墊圈 Q=12.6kg<
67、;/p><p><b> 4)伸縮縫</b></p><p> TST伸縮縫 Q=12m</p><p><b> 5)支座</b></p><p> ?、窦変摻?Q=56.22kg</p><p> 鋼材 Q=224.56kg</p><p&
68、gt; 板式橡膠支座 Q=56塊</p><p> 四氟板式橡膠支座 Q=28塊</p><p><b> 4.2 下部結(jié)構(gòu)</b></p><p><b> 1)橋墩</b></p><p><b> 墩冒</b></p><p> C
69、30混凝土 Q=5.64kg</p><p> Ⅰ級鋼筋 Q=95.2kg</p><p> ?、蚣変摻?Q=206.8kg</p><p><b> 墩身 </b></p><p> 10號漿砌塊石 Q=40.2m3</p><p><b> 基礎(chǔ)</b&
70、gt;</p><p> 15號片石混凝土 Q=81.2m3</p><p> 挖方 Q=280m3</p><p><b> 2)橋臺</b></p><p><b> 臺帽</b></p><p> C30混凝土 Q=8.6m3</p><
71、p> ?、窦変摻?Q=220.4kg</p><p> ?、蚣変摻?Q=402.4kg</p><p><b> 臺身</b></p><p> C30混凝土 Q=4.04m3</p><p> 10號漿砌片石 Q=36.88m3</p><p> 10號漿砌塊石 Q=24
72、.58m3</p><p><b> 基礎(chǔ)</b></p><p> 15號片石混凝土 Q=111m3</p><p> 挖方 Q=350m3</p><p> 5.附屬工程及公路設(shè)施及預(yù)埋管線工程</p><p><b> 橋頭搭板</b></p>
73、<p> C30混凝土 Q=18m3</p><p> Ⅱ級鋼筋 Q=1594.1kg</p><p><b> 錐坡</b></p><p> M7.5漿砌片石Q=4.54m3</p><p> 碎石砂回填 Q=100m3</p><p> 砂礫墊層Q=0.4m3
74、 </p><p> 錐心填土 Q=0.57m3</p><p> 挖方 Q=12.9m3</p><p><b> 泄水管 </b></p><p><b> Q=12個</b></p><p> 5.1路面標(biāo)線:雙車道,三條標(biāo)線,標(biāo)線寬0.1m。則有</
75、p><p> Q=3*0.1*1000=300</p><p> 5.2 里程樁、公路界碑: 路線長1公里,則</p><p><b> 里程碑:Q=塊</b></p><p><b> 百米樁Q=10塊</b></p><p><b> 公路界碑Q=1塊&l
76、t;/b></p><p><b> 6 占地面積</b></p><p> 路基平均高度h=1.76m</p><p> 路基底面寬度12+2*1.5*1.76=17.28m</p><p> 填方路基為兩側(cè)邊溝外側(cè)1m</p><p> 邊溝占地寬度為1.6*2=3.2m<
77、;/p><p> 占地面積 S=(17.28+3.2+2*2*1)×1000=24480m2=36.72畝 </p><p> 每畝耕地賠償6500元,1畝=666.7m2 </p><p> 補償Q=36.72×6500=238668.07元</p><p> 五、縱橫軟件預(yù)算計算</p><p&
78、gt;<b> 一)新建項目</b></p><p><b> 二)增添項目</b></p><p><b> 三)套定額</b></p><p><b> 臨時道路</b></p><p><b> 臨時便橋</b><
79、;/p><p><b> 臨時電力線路</b></p><p><b> 清除表土</b></p><p><b> 挖路基土方</b></p><p><b> 填方</b></p><p><b> 石灰粉煤灰土
80、底基層</b></p><p> 石灰粉煤灰穩(wěn)定碎石基層</p><p><b> 透層</b></p><p><b> 瀝青混凝土面層</b></p><p><b> 培路肩</b></p><p><b> 路緣石
81、</b></p><p><b> 橋梁工程</b></p><p><b> 安全設(shè)施</b></p><p><b> 四)單價計算</b></p><p><b> 1.人工單價</b></p><p>&
82、lt;b> 2.材料單價</b></p><p><b> 原木</b></p><p><b> 重油</b></p><p><b> 3.機械單價</b></p><p><b> 五)選擇費率</b></p>
83、<p><b> 計算報表</b></p><p> 總預(yù) 算表 (01 表 )</p><p> 人工、主要材料、機械臺班數(shù)量匯總表 (02 表 )</p><p> 建筑安裝工程費計算表 (03 表 ) </p><p> 其他工程費及間接費綜合費率計算表 (04 表 ) </p>
84、;<p> 設(shè)備、工具、器具購置費計算表 (05 表 ) </p><p> 工程建設(shè)其他費用及回收金額計算表 (06 表 ) </p><p> 人工、材料、機械臺班單價匯總表 (07 表 ) </p><p> 分項工程預(yù)算表 (08-2 表 )</p><p> 材料預(yù)算單價計算表 (09 表 )</p&
85、gt;<p> 機械臺班單價計算表 (11 表 )</p><p><b> 心得體會</b></p><p> 通過本次課程設(shè)計,我收獲很多。熟練的操作了概預(yù)算軟件。</p><p> 首先,我對施工組織的具體事項有了更深刻的理解,以前含糊不清的概念慢慢的變得清晰明了了,像一些概念如施工組織設(shè)計及設(shè)計原則,項目的劃分,工
86、料機的計算,定額的抽換等等。這次課程設(shè)計讓我對課本知識有了更進(jìn)一步的認(rèn)識,熟悉了定額的套用及抽換,明白了概預(yù)算總費用里各費用之間的關(guān)系,更進(jìn)一步認(rèn)識到了建安費所占的較大比重。其次我意識到了定額的套用及費用的計算是非常麻煩的,稍不注意就會出錯,通過這次課程設(shè)計我意識到了細(xì)心這一良好品質(zhì)的重要性,在以后的工作和學(xué)習(xí)中一定要細(xì)心謹(jǐn)慎。</p><p> 當(dāng)然這次的課程設(shè)計也遇到了很大的困難,最棘手的就是軟件的運用,從
87、開始的無從下手到后來的得心應(yīng)手,經(jīng)過與同學(xué)合作,這一切多虧了老師的悉心指導(dǎo)級同學(xué)間的慷慨相助,在此向給我提供幫助的老師和同學(xué)說聲謝謝。</p><p><b> 參考資料</b></p><p> 1、《公路工程預(yù)算定額》(JTG/T B06-02-2007) 人民交通出版社,2007</p><p> 2、《公路基本建設(shè)工程概算、預(yù)算編
88、制辦法》(JTG/T B06-2007) 人民交通出版社 ,2007</p><p> 3、《公路工程機械臺班費用定額》(JTG/T B06-03-2007) 人民交通出版社,2007</p><p> 4、《公路工程概算定額》(JTG/T B06-01-2007) 人民交通出版社,2007</p><p> 5、《公路工程預(yù)算定額、公路工程預(yù)算定額基價表
89、》 書目文獻(xiàn)出版社 , 1996</p><p> 6、王首緒,《公路施工組織及概預(yù)算》 人民交通出版社,2007</p><p> 7、范立礎(chǔ),《橋梁工程》(上冊) 人民交通出版社,2009</p><p> 8、王曉謀,《基礎(chǔ)工程》,人民交通出版社,2010</p><p> 9、魏紅一,《橋梁施工及組織管理》 人民交通出版社
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 眾賞文庫僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 概預(yù)算課程設(shè)計
- 概預(yù)算課程設(shè)計doc
- 概預(yù)算課程設(shè)計-戴路
- 公路工程概預(yù)算課程設(shè)計
- 公路工程概預(yù)算課程設(shè)計
- 水利工程概預(yù)算課程設(shè)計
- 道路施工組織概預(yù)算課程設(shè)計
- 公路工程概預(yù)算課程設(shè)計
- 施工組織與概預(yù)算課程設(shè)計
- 消防工程概預(yù)算課程設(shè)計
- 建筑工程概預(yù)算課程設(shè)計
- 道路施工組織概預(yù)算課程設(shè)計
- 建筑工程概預(yù)算課程設(shè)計
- 民用建筑概預(yù)算課程設(shè)計
- 《施工組織與概預(yù)算》課程設(shè)計
- 公路施工組織及概預(yù)算課程設(shè)計
- 建筑工程概預(yù)算課程設(shè)計指導(dǎo)
- 公路施工組織與概預(yù)算課程設(shè)計
- 公路施工組織與概預(yù)算課程設(shè)計
- 二級公路概預(yù)算課程設(shè)計
評論
0/150
提交評論