版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、英文原文 英文原文Practical Neural Network Applications in the Mining IndustryL. Miller-Tait, R. PakalnisDepartment of Mining and Mineral Process Engineering,University of British Columbia,Vancouver, B.C., CanadaABSTRACTThe minin
2、g industry relies heavily upon empirical analysis for design and prediction. Neural networks are computer programs that use parallel processing, similar to the human brain, to analyze data for trends and correlation. Two
3、 practical neural network applications in the mining industry would be rockburst prediction and stope dilution estimates. This paper summarizes neural network data analysis results for a 1995 Goldcorp/Canmet study on roc
4、kbursting and a 1986 UBC/Canmet study on open stope dilution at the Ruttan Mine.1. INTRODUCTIONMany aspects of mine design are based upon empirical data. Neural Networks analyze data and predictions based on previous res
5、ults. Neural networks have advantages over conventional empirical design approaches. These advantages include:? Neural networks can easily use multiple inputs to analyze data.? By using multiple hidden layers and nodes n
6、eural networks investigate the combined influence of inputs.? Neural networks can be easily retrained as new data becomes available making them a more dynamic and flexible empirical estimation approach.? Neural network s
7、oftware is inexpensive and easy to use.? Neural networks have demonstrated a more accurate empirical estimate over conventional methods.The advantages of using neural networks are illustrated in a rockburst prediction ex
8、ample and an open stope dilution example.2. ROCKBURST PREDICTIONThe first example of a potential situation where neural networks could be useful in the mining industry is the prediction of rockbursts through physical inp
9、uts. To quote directly from the Ontario Ministry of Labor “...we do not have the ability to predict when and where rockbursts will occur, and the experts in the field agree that we are not close to make such predictions”
10、 [1]. Between 1984 and 1993 eight underground miners were killed in Ontario due to rockbursts. This accounted for ? Jw - joint water reduction factor? SRF - stress reduction factor.The actual Q formula is Q= RQD/Jn ×
11、; Jr/Ja × Jw/SRF.The Jw/SRF factor was assumed to be 1.0 for this study because dry conditions are assumed. Stress is factored through modelling and strain measurements. The Q factor ranges on a logarithmic scale ra
12、nging from 0.001 to 1,000 where 0.001 is extremely poor rock and 1,000 is virtually perfect rock.Span [5] - the meaning of span refers to the width of an underground opening in plan view. Span can be determined through t
13、he largest diameter of a circle within an underground excavation.SRF’ [2] - refers to the adjusting of RMR values relative to stress ratios and previous history of ground conditions. It does not refer directly to SRF use
14、d in the calculation of Q. Stress criteria is based upon the ratio of induced stress over unconfined compressive strength (UCS) of the rock.2.2. Output FactorsBurst refers to a stope in which a rockburst has occurred. A
15、rockburst is an instantaneous rock failure in or about an excavated area characterized/accompanied by a shock or tremor in the surrounding rock.PUN-RF refers to potentially unstable ground with respect to a roof fall. A
16、stope is considered potentially unstable if any of the following conditions occur [2]:? The opening may exhibit strong discontinuities having orientations that form potential wedges in the back.? Extra ground support may
17、 have been installed to prevent a potential fall of ground.? Instrumentation installed in the stope has recorded continuing movement of the stope back.? There may be an increased frequency of ground working or scaling.PU
18、N-GW refers to a stope considered potentially unstable due to the likelihood of a ground wedge failure. This is a subset of PUN-RF collected separately to identify areas where jointing may result in wedge failures.Cave r
19、efers to when uncontrolled ground failures result in caving.3. NEURAL NETWORK ANALYSISThe above inputs and outputs were run on a neural network to see if a neural network could predict results from the input data and als
20、o to see which inputs had the greatest effect on output prediction. A two layer network consisting of 13 nodes was run for 10105 cycles reaching a 1.69 percent error. Seventy three observations were used to train the net
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 眾賞文庫(kù)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 采礦外文翻譯---采礦工業(yè)中實(shí)用的神經(jīng)網(wǎng)絡(luò)應(yīng)用程序
- 采礦外文翻譯---采礦工業(yè)中實(shí)用的神經(jīng)網(wǎng)絡(luò)應(yīng)用程序
- 采礦外文翻譯---采礦工業(yè)中實(shí)用的神經(jīng)網(wǎng)絡(luò)應(yīng)用程序.docx
- 采礦外文翻譯---采礦工業(yè)中實(shí)用的神經(jīng)網(wǎng)絡(luò)應(yīng)用程序.docx
- 外文翻譯---采礦工業(yè)中實(shí)用的神經(jīng)網(wǎng)絡(luò)應(yīng)用程序.docx
- 淺談采礦工藝技術(shù)在采礦作業(yè)中的應(yīng)用
- 采礦工培訓(xùn)教案一
- 采礦工程中存在的問(wèn)題
- 采礦工程畢業(yè)設(shè)計(jì)外文翻譯--中國(guó)采煤方法
- 采礦工培訓(xùn)教案一 (1)
- 采礦工程畢業(yè)設(shè)計(jì)翻譯---爆破在井巷掘進(jìn)中的應(yīng)用
- 綠色開(kāi)采在采礦工程中的重要應(yīng)用分析
- 安全管理在煤礦采礦工程中的應(yīng)用分析
- 超前支護(hù)在采礦工程中的應(yīng)用研究
- 分析采礦工程中綠色開(kāi)采技術(shù)的相關(guān)應(yīng)用
- 采礦工程畢業(yè)設(shè)計(jì)
- 采礦工程設(shè)計(jì)合同
- 采礦工程畢業(yè)設(shè)計(jì)
- 采礦工程畢業(yè)設(shè)計(jì)
- 探析采礦工程中數(shù)值模擬的運(yùn)用
評(píng)論
0/150
提交評(píng)論