版權說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權,請進行舉報或認領
文檔簡介
1、2100 英文單詞, 英文單詞,11500 英文字符,中文 英文字符,中文 3400 字文獻出處: 文獻出處:Wibowo M A, Astana I N Y, Rusdi H A. Dynamic Modelling of the Relation between Bidding Strategy and Construction Project Performance ☆[J]. Procedia Engineering, 201
2、7, 171:341-347.Dynamic modelling of the relation between bidding strategy and construction project performanceMochamad Agung Wibowo, INyoman YudhaAstana, RusdiH.AAbstractStrategy is required in order to win the competiti
3、on. Bidding strategy in construction is defined as a management skill of using all available resources, both physical and financial, to offer a comprehensive and competitive bidding, with an aim to win the competition,
4、and provide maximum project performance. There are many factors that influence construction bidding strategy, and many indicators of project performance have to be considered. Therefore, the relation between bidding stra
5、tegy and project performance is very complex. Contractors have to consider this very carefully, and they have to evaluate their bidding strategies to ensure that the company goals have been achieved. Dynamic system is a
6、 method for develop a management simulation using computer, and helps the study of dynamic complexity; understand the source of policy resistance and helps the design of more effective policies. Furthermore, dynamic sy
7、stem is explained as a tool simulation system that is able to solve the problem of system complexity and also can present behaviour of real world. The study aims to develop a dynamic model and the simulation of bidding
8、strategy and project performance. Case study was carried out in the major contractor in Denpasar, and the analysis used is System Dynamics. The model demonstrated that bidding strategy had a direct impact to project per
9、formance. The model simulation found that the enhancement of bidding strategy by 13.67% improved the project performance significantly, by 10.55%, from bid price.Keywords: Bidding Strategy; Project Performance; Dynamics
10、 Modelling1. IntroductionsStrategy is how the company achieves a goal. Park (1979) in [1] outlines many definitions of strategy such as skilful of company management of their financial and physical resources, to reach
11、the company goals that have been established; meeting the science and art of the management under the most advantageous condition possible; handling plans or methods carefully; management of ideas related to the firm’s
12、objectives, and how to realize these company goals and the reason to achieve them. In the simplest terms strategy means a plan for company success. However, bidding strategy in construction is not only aiming to win th
13、e competition, but also intended to achieve project success and make a profit. Therefore, the ideal outcome is that the contractor wins a project and a good performance is achieved, through the profit that has been plan
14、ned. Strategy is necessary in this process because the contractor is faced with uncertainty. In addition, many factors influence the bid/no bid and mark up decisions.2. Literature references2.1. Bidding strategy in con
15、structionthat influence bidding estimate: internal, external and environment factors. This research uses the system dynamics method, which is divided into four stages as shown in Fig. 1. The first stage is developing a
16、conceptual model. The conceptual model was developed from literature review related to bidding strategy and project performance. The second stage was collecting data through the process of bidding and the project repor
17、t. The third stage was to develop dynamics modelling, which consist of developing a causal loop and stock flow diagram. The final stage was simulation and analysis. Modelling of the relation between bidding strategy and
18、 project performance was analysed using system dynamics with Powersim 2.5.Fig.1. Research Conceptual Model4. Analysis and discussion4.1. Concept of modellingThe research on the mezzo level found that the strategic decisi
19、on had a direct impact on company performance [7]. The most strategic decision was strategic project selection. Based on this relation, the previous research also found that there is a direct impact of bidding strategy o
20、n project performance [3]. The modelling of this research is limited to the micro level/project level, namely the relation between bidding strategy and project performance. Figure 2 displays a conceptual model of strate
21、gic bidding and project performance.Fig 2. Conceptual Model of Bidding Strategy and Project PerformanceConcept of model was built based on static analysis according to the dominant factors, as well as conditions and dat
22、a available in the company. Therefore, not all of the variables in the static analysis is used in a dynamic model. Hereinafter variables of bidding strategy and project performance in the analysis are considered as sub-
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經(jīng)權益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 眾賞文庫僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
- 6. 下載文件中如有侵權或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- [雙語翻譯]招投標外文翻譯--投標策略與工程項目績效關系的動態(tài)建模(英文)
- [雙語翻譯]招投標外文翻譯--投標策略與工程項目績效關系的動態(tài)建模中英全
- 2017年招投標外文翻譯--投標策略與工程項目績效關系的動態(tài)建模
- 2017年招投標外文翻譯--投標策略與工程項目績效關系的動態(tài)建模.DOCX
- 2017年招投標外文翻譯--投標策略與工程項目績效關系的動態(tài)建模(英文).PDF
- [雙語翻譯]招投標外文翻譯--投標管理系統(tǒng)工程方法
- [雙語翻譯]招投標外文翻譯--投標管理:系統(tǒng)工程方法
- [雙語翻譯]招投標外文翻譯--投標管理系統(tǒng)工程方法(英文)
- [雙語翻譯]招投標外文翻譯--投標管理系統(tǒng)工程方法中英全
- 外文翻譯--建筑項目招投標
- 建筑項目招投標外文翻譯
- 工程項目招投標策略與技巧探討
- 工程管理畢業(yè)外文翻譯--建筑項目招投標
- 關于工程項目招投標策略的分析
- 工程投標策略外文翻譯
- 工程投標策略外文翻譯1
- 建筑項目招投標畢業(yè)設計外文翻譯
- 建筑項目招投標畢業(yè)論文外文翻譯
- 工程項目招投標與索賠管理.pdf
- 2008年招投標外文翻譯--投標管理系統(tǒng)工程方法
評論
0/150
提交評論