文檔簡(jiǎn)介
1、字?jǐn)?shù):英文 字?jǐn)?shù):英文 2323 2323 單詞, 單詞,13270 13270 字符;中文 字符;中文 4098 4098 漢字 漢字出處: 出處:Farina Farina L, L, Danesi Danesi E, E, Travaglini Travaglini A, A, et et al. al. Integration Integration of of constructability constructability
2、 and and project project risk risk management[M]//Closing management[M]//Closing the the gap gap between between practice practice and and research research in in industrial industrial engineering. engineering. Sp
3、ringer, Springer, Cham, Cham, 2018: 2018: 313-321. 313-321.外文文獻(xiàn): 外文文獻(xiàn): Integration of Constructability and Project Risk ManagementAbstract The research concerns the EPC world and Mega-Projects. The focus is on two disci
4、plines: Risk Management and Constructability. An innovative integration model is proposed, aiming to bridge the existing gaps, to support a structured decision-making process and to facilitate the integration of the two
5、disciplines characterised by different approaches and competences, but with a common target: the megaproject success. The validation of the model is carried out by mean of a cost/benefit analysis on four case studies of
6、an EPC contractor (Saipem SpA).Keywords: EPC contractor; Construction Integration; Constructability; Project risk management1.IntroductionNowadays EPC contractors have to deal with increasingly complex projects, characte
7、rized by fragmented and articulated processes. The development of appropriate tools and techniques is necessary to make the project management efficient and to avoid waste in terms of time and resources. Othman (2011) st
8、ates that most of these problems can be overcome by implementing procedures that focus on reference standard is the IDEF 0, fit for function modelling. By integrating the theoretical model concepts into Saipem’s procedur
9、es, a time-dependent model has been developed (M3). After defining cluster domain for case studies, the model validation has been developed in four projects subjected to a cost/benefit analysis. Figure 2 shows the data c
10、ollection and the analysis development.Fig. 1 Research methodology processFig. 2 Data collection and data analysisData about construction criticalities (due to the lack of integration) have been collected from internal d
11、ocumentation and interviews with personnel involved in the examined projects. The triangulation of evidences (Yin 2012) from multiple data sources and the investigator triangulation (Bryman 2004) results in the process.
溫馨提示
- 1. 本站所有資源如無(wú)特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 眾賞文庫(kù)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 項(xiàng)目風(fēng)險(xiǎn)管理外文翻譯
- 建筑工程施工項(xiàng)目風(fēng)險(xiǎn)管理淺析
- 建筑工程施工項(xiàng)目風(fēng)險(xiǎn)管理措施
- 建筑工程施工項(xiàng)目風(fēng)險(xiǎn)管理研究
- bot項(xiàng)目風(fēng)險(xiǎn)管理【外文翻譯】
- 建筑工程項(xiàng)目風(fēng)險(xiǎn)管理措施-建筑工程
- [雙語(yǔ)翻譯]建筑工程外文翻譯--建筑工程規(guī)劃與施工中施工管理文件使用情況調(diào)查
- 淺析建筑工程項(xiàng)目風(fēng)險(xiǎn)管理
- 建筑工程項(xiàng)目風(fēng)險(xiǎn)管理研究
- [雙語(yǔ)翻譯]建筑工程外文翻譯--建筑工程規(guī)劃與施工中施工管理文件使用情況調(diào)查(英文)
- [雙語(yǔ)翻譯]建筑工程外文翻譯--建筑工程規(guī)劃與施工中施工管理文件使用情況調(diào)查中英全
- 建筑工程施工安全管理研究外文翻譯
- 關(guān)于建筑工程項(xiàng)目風(fēng)險(xiǎn)管理的探討
- 建筑工程項(xiàng)目風(fēng)險(xiǎn)管理的研究.pdf
- 建筑工程項(xiàng)目風(fēng)險(xiǎn)管理研究——華城領(lǐng)秀Ⅱ期項(xiàng)目風(fēng)險(xiǎn)管理.pdf
- epc工程總承包項(xiàng)目風(fēng)險(xiǎn)管理要點(diǎn)
- 解析建筑工程項(xiàng)目風(fēng)險(xiǎn)與全面風(fēng)險(xiǎn)管理
- 略論建筑工程項(xiàng)目風(fēng)險(xiǎn)控制與管理
- 建筑工程項(xiàng)目風(fēng)險(xiǎn)預(yù)警管理研究.pdf
- 我國(guó)建筑工程項(xiàng)目風(fēng)險(xiǎn)管理研究
評(píng)論
0/150
提交評(píng)論