1、<p><b> 中文5000字</b></p><p><b> 外文原文</b></p><p> Analyses the development trend of engineering project management in our country and the countermeasures</p>
2、<p><b> Abstract</b></p><p> This article analyses briefly present situation and two development tendencies of Chinese project management.And it presents several countermeasures in order
3、that Chinese project management welcome coming of economic globlization and knowledge economic.</p><p> Key Words: Project Management, Development Tendency, Countermeasure, Present Situation</p><
4、;p> Introduction</p><p> The English expressions of Project Management is "Project Management". Architectural engineering field in the UK, however, to "Project Management" should be
5、the correct understanding of "the owner's Project Management". That is to say, the British "Project Management" and "construction supervision" from the nature of our country, working con
6、tent and represent the interests of the who should be equal. The difference is "construction supervision" emphasizes the social institutions on behalf of the</p><p> Since China's reform and o
7、pening up, along with our country socialist market economic system gradually improve. Our country's construction enterprises to participate in the international construction market competition is more and more, from
8、several development in 1979 by the hundreds of this year, from the initial pure service contracting, development to the engineering general contracting today. It is obvious that China has become a great nation of buildin
9、gs. At the same time, the construction</p><p> Frist, our country the status quo and existing problems of the engineering project management</p><p> Modern project management discipline origin
10、ated in the '50 s, the CPM and PERT technology in the United States, in the' 60 s achieve great success in the Apollo program, which is popular all over the world. From the 60 s, the international many developed
11、an interest in project management. There are two big project management system of research, namely: headed by the European system, the international project management association (IPMA), headed by the United States syst
12、em - American project man</p><p> The characteristics of engineering project management development in China as an important branch of modern management science, a "project management", introduced
13、 to China in 1982, 1988 in the national pilot application, 1993. Beginning January 1, 2000, our country has a formal implementation of the National People's Congress passed the bidding</p><p> The law.
14、The law relating to different aspects of project management for the healthy development of project management in our country provides legal protection. It should be said that more than a decade the achievements of our co
15、untry's project management is significant, but the quality accident, time delays, cost overruns and other issues are still a lot. For example: in 1998, during the floods the burst of jiujiang Yangtze river levee; In
16、April 1999 in chongqing the qijiang count rainbow bridg</p><p> Second, the development trend of engineering project management in our country</p><p> 1. The international trend of the enginee
17、ring project management</p><p> With China's further speed up the reform and opening up, China's economy is becoming more and more deeply into the global market, multinational company and multinatio
18、nal projects in our country more and more. Since China's reform and opening up, foreign investment enterprises in our country up to 32 m, the actual use of foreign capital of $357.7 billion in China. Many projects in
19、 China to operate by way of international bidding, consultation or BOT. Chinese enterprises go abroad for overseas inv</p><p> 2. The process of project management informationization trend</p><p&
20、gt; Along with the INTERNET into the thousands, and the coming of knowledge economy era, information has become a inevitable trend of project management. As today's update the fastest computer technology and network
21、 technology in the enterprise operation and management to popularize and apply the surprising speed, and accelerated the development of the situation. This caused a lot of new characteristics for the project management i
22、n today, with rapid expansion of information, project management is m</p><p> The third, countermeasures of engineering project management in our country</p><p> 1. The innovation</p>&
23、lt;p> Innovation is the soul of a nation's progress, is the inexhaustible driving force for the prosperity of a country, is also an enterprise victory in the competition and keep the advantage of reliable guarant
24、ee. At present, our enterprises management is too extensive, relaxation, lack of scientific management, far can not adapt to the development of the market situation, thus to strengthen enterprise management and innovatio
25、n is particularly urgent and important. The construction enterprise projec</p><p> (1), the idea innovation is the motivation</p><p> At present, along with the market competition heats up, th
26、e construction enterprise's survival and development by powerful challenge, especially as the tradition of long-term dependence on railway construction enterprise, due to the market development trend, railway, highwa
27、y, water conservancy, city</p><p> Administration of engineering construction, the construction cost and the unit price slash, quality not to raise prices, make the enterprise operating costs, profits, or e
28、ven a loss. Therefore, enterprises must adjust strategy, renew the idea, strengthen management.</p><p> (2), system innovation is the premise</p><p> Construction project management system is
29、an important part of enterprise management mechanism, only the establishment of a scientific and efficient project management system, the project can give enterprise to bring the expected benefits, and develop a steady s
30、tream of market. Scientifically set up the project department, highly efficient, coordinated control, strong implementation project of human resources, technology resource, equipment resource elements such as the optimal
31、 combination, to s</p><p> (3), the technical innovation is the source</p><p> In today's world, has entered the era of science and technology today. Project management to innovate, insepa
32、rable from the technology innovation. To actively promote the new technology application in the first place. Ten new technology, the ministry of construction to promote domestic construction industry is a master of techn
33、ology innovation, we have been used in many projects. Changji century garden project, in 2003 won the autonomous region quality engineering construction projects in xinjia</p><p> (4), the method innovation
34、 is the guarantee</p><p> Management innovation is the organic treatment project management and coordinate the construction period, quality, the cost is the key to multiple goals, is the important guarantee
35、 of successful project management.</p><p> Schedule control method innovation. As the schedule control, any a project is a complicated system engineering. Therefore, must carefully prepare the construction
36、organization design. Only in this way can determine the various stages of project control points, and from the periodic success to achieve the final success.</p><p> Quality management method innovation. Qu
37、ality is the life of the enterprise, the enterprise to obtain the market mainly by quality. Quality control core is to carry out the quality responsibility, should stick to do time again tight program not beyond, task he
38、avy standard not again</p><p> Don't relax down, in bad conditions requirements. Through the innovation of the quality control measures and management method, realize the goal of continuously merit and
39、casting the high-quality goods project, to win customer satisfaction, and constantly open up new areas, new markets, and ultimately achieve the goal of market innovation.</p><p> The cost control measures t
40、o the innovation. Project is a cost center, cost control is crucial. "Cost" is the core of enterprise management, the vast majority of the cost management activities are all around. Cost management is the manag
41、ement of the whole process and comprehensive, from bidding contracting tasks to project completion inspection, every link every working procedure to predict in advance, carefully accounting and monitoring. Perfect projec
42、t contract management is also a key factor </p><p> (5) training, strengthening the management innovation, promote enterprise's core competitiveness</p><p> The focus is project manager of
43、 construction of a high-quality professional team, this is our good to solve the most critical problem. Group the present situation of the project manager is at present: quantity many, structural imbalance, quality is un
44、even, the training use disconnect, especially have rich practical experience of excellent project manager is not much, so that when choosing a project manager, and is often compromised. The project manager, he is respons
45、ible for the enterprise legal</p><p> 2.The sustainable development</p><p> From "lu bouguer experience" in the 1980 s to today, the project management in the irreplaceable role to t
46、he development of construction industry. But due to the construction industry on the one hand, building better living space for human being, at the same time produce certain destruction to environment. Due to the constru
47、ction industry, for example, the extensive use of synthetic chemical material, some contain sulfur dioxide, nitrogen dioxide, halide materials exposed to the atmosphere, or w</p><p> Therefore, in today'
48、;s people increasingly pay attention to environmental issues, sustainable development is more and more become the focus of hot spots, but mainly focus on the hot spot in the sustainable development of land and natural re
49、sources sustainable use of non-renewable resources, focused on the research on the sustainable economic development, neglect of main object of study on sustainable project. How to from the perspective of sustainable deve
50、lopment to promote and develop the organi</p><p> Fourth, the epilogue</p><p> In short, in the face of the coming 21st century, actively promote the innovation of the construction enterprises
51、 in our country, trying to explore suitable for China's national conditions, the convergence of international management practice new experience and new model of project management, has the very vital significance. I
52、nsist on innovation, the courage to explore, summarize unceasingly, rich rise, engineering project management in our country will create a new experience, new fruitful res</p><p> References:</p><
53、;p> (1) Ding Shizhao, the architectural engineering project management, construction of China publishing house, 1987</p><p> (2) (the) J.D. FeiLeiM, "new project management", Beijing: world bo
54、ok publishing house, 2001</p><p> (3) (USA), the dai li, Yang Aihua, Yang lei, Wang Zengdong et al, the project management plan, schedule and control method of system ", Beijing: electronic industry pr
55、ess, 2002</p><p> (4)Zhao Tao, Pan Xinpeng, "the whole project management", Beijing: China textile publishing house, 2004</p><p> (5) Jiang Chun, the analysis of construction enterpr
56、ise project management ", information science and technology, 2006. (01)</p><p><b> 外文資料翻譯譯文</b></p><p> 淺析我國工程項目管理的發(fā)展趨勢及對策</p><p><b> 【摘 要】</b></
57、p><p> 簡要分析了我國工程項目管理的現(xiàn)狀,同時就工程項目管理發(fā)展的國際化、信息化兩大趨勢作了詳細論述,并提出了面對WTO,為迎接經(jīng)濟全球化和知識經(jīng)濟時代到來,中國工程項目管理應該采取的一些對策。 </p><p> 【關鍵字】: 項目管理 現(xiàn)狀 發(fā)展趨勢 對策 </p><p><b> 前言</b></p>&l
58、t;p> 項目管理的英語表達是“Project Management”。然而在英國建筑工程領域,對“Project Management”的正確理解應是“業(yè)主的項目管理”。這就是說,英國的“Project Management”與我國的“建設監(jiān)理”從性質(zhì)、工作內(nèi)容以及代表誰的利益來看應是等同的。所不同的是“建設監(jiān)理”強調(diào)的是社會機構代表業(yè)主的利益進行的項目管理,而“Project Management”強調(diào)的是業(yè)主的項目管理。&
59、lt;/p><p> 改革開放以來,隨著我國社會主義市場經(jīng)濟體制的逐步完善。我國的建筑施工企業(yè)參與國際建設市場競爭越來越多,由1979年的幾家發(fā)展到今年的上百家,由最初的單純勞務承包,發(fā)展到今天工程總承包。無庸諱言,中國已成為建筑大國。同時,我國的建筑市場也實行了“門戶開放”,許多境外建筑承包商進入我國承包工程,從而加劇了國內(nèi)建筑市場競爭。但從我國建筑企業(yè)實際情況看,在工程項目的管理上與國際慣例尚有較大差距,影響著
60、我國工程項目管理水平的提高。因此,清楚的了解我國工程項目的現(xiàn)狀以及缺點,改革傳統(tǒng)項目管理模式,加速與國際慣例接軌,已是建筑企業(yè)的重要課題。 </p><p> 我國工程項目管理的現(xiàn)狀以及存在的問題</p><p> 近代項目管理學科起源于50年代,在美國出現(xiàn)了CPM和PERT技術,60年代在阿波羅登月計劃中取得巨大成功,由此風靡全球。從60年代起,國際上許多人對于項目管理產(chǎn)生了濃厚的
61、興趣。目前有兩大項目管理的研究體系,即:以歐洲為首的體系——國際項目管理協(xié)會(IPMA),以美國為首的體系——美國項目管理協(xié)會(PMI)。</p><p> 我國工程項目管理發(fā)展的特點作為現(xiàn)代管理科學的一重要分支學科“工程項目管理”,1982年引進到我國,1988年在全國進行應用試點,1993年正式推廣。2000年1月1日開始,我國已經(jīng)正式實施全國人大通過的《招標投標法》。這個法律涉及項目管理的諸多方面,為我國
62、項目管理的健康發(fā)展提供了法律保障。應該說十多年來我國的項目管理取得的成績是顯著的,但目前質(zhì)量事故、工期拖延、費用超支等問題仍然不少。例如:1998年特大洪災期間決口的九江長江大堤;1999年4月出現(xiàn)的重慶綦江彩虹橋坍塌;寧波大橋出現(xiàn)的嚴重事故;北京西客站的質(zhì)量問題等。這一系列的工程事故不僅給國家和人民的生命財產(chǎn)造成了巨大的損失,同時也造成了不良的社會影響。究其原因這些事故無一例外的都是與項目管理有關,都是由于項目管理不善,管理不規(guī)范所造
63、成的。這表明在項目管理這個領域我國與西方發(fā)達國家相比還有相當差距,其具體表現(xiàn)在以下幾方面。1.沒有一個自始至終貫穿項目建設全過程的企業(yè)性經(jīng)濟管理組織。2.法律、法規(guī)不健全?!坝蟹ú灰?,執(zhí)法不嚴”的現(xiàn)象隨處可見,隨時可聞。有些工程沒有實行招投標制,有些卻采用議標或是假招標,大搞“人情工程”。3.不重視項目</p><p> 二, 我國工程項目管理的發(fā)展趨勢</p><p> 1.工程項目
64、管理的國際化趨勢 </p><p> 隨著我國改革開放的進一步加快,中國經(jīng)濟日益深刻地融入全球市場,在我國的跨國公司和跨國項目越來越多。改革開放以來,外資在我國投資企業(yè)達32萬家,我國實際利用外資達3577億美元。我國的許多項目要通過國際招標、咨詢或BOT方式運作。我國企業(yè)走出國門在海外投資和經(jīng)營的項目也在增加。與此同時,項目管理的國際化正形成趨勢和潮流。特別是我國加入WTO后,國內(nèi)市場國際化,國內(nèi)外市場全面融
65、合,外國企業(yè)必定利用其在資本、技術、管理、人才、服務等方面的優(yōu)勢,擠占我國國內(nèi)市場,尤其是工程總承包市場。面對日益激烈的市場競爭,我國的企業(yè)必須以市場為導向,轉換經(jīng)營模式,增強應變能力,在競爭中學會生存,在拼搏中尋求發(fā)展。另一方面,入世后根據(jù)最惠國待遇和國民待遇,我們將獲得更多的機會,并能更加容易地進入國際市場。同時,加入WTO后,在國際市場上,作為一名成員國,我國的企業(yè)可以與其他成員方企業(yè)擁有同等的權利,并享有同等的關稅減免,在“貿(mào)易
66、自由化”原則指導下,減少對外工程承包的審批程序,將有更多的公司從事國際工程承包,并逐步過渡到自由經(jīng)營。為了適應這種發(fā)展趨勢,我們應該做到以下幾點:(1)、建立高素質(zhì)項目管理班子,是與國</p><p> 2.程項目管理的信息化趨勢 </p><p> 伴隨著INTERNET走進千家萬戶,以及知識經(jīng)濟時代的到來,項目管理的信息化已成必然趨勢。作為當今更新最快的電腦技術和網(wǎng)絡技術在企業(yè)經(jīng)營
67、管理中普及應用的速度令人吃驚,而且呈現(xiàn)加速發(fā)展的態(tài)勢。這給項目管理帶來很多新的特點,在信息高速膨脹的今天,項目管理越來越依賴于電腦手段,其競爭從某種意義上講已成為信息戰(zhàn)。另一方面,作為21世紀的主導經(jīng)濟——知識經(jīng)濟已經(jīng)來臨,與之相應的項目管理也將成為一個熱門前沿領域。這一動向提醒我們,項目管理正成為社會管理和企業(yè)管理現(xiàn)代化的重要內(nèi)容。知識經(jīng)濟時代的項目管理是通過知識共享、運用集體智慧提高應變能力和創(chuàng)新能力。知識經(jīng)濟可以理解為把知識轉化為
68、效益的經(jīng)濟。這個過程單靠工業(yè)、農(nóng)業(yè)那樣的重復、批量的生產(chǎn)是無法實現(xiàn)的,這時先進管理手段——電腦又發(fā)揮了不可替代的作用。由此我們也可以看出無論網(wǎng)絡時代還是知識經(jīng)濟時代,它們的共同點都是離不開電腦手段。目前西方發(fā)達國家的一些項目管理公司已經(jīng)在項目管理中運用了計算機網(wǎng)絡技術,開始實現(xiàn)了項目管理網(wǎng)絡化、虛擬化。另外,許多項目管理公司也開始大量使用項目管理軟件進行項目管理,同時還從事項目管理軟件的開發(fā)研究工作。種種跡象表明21世紀</p&g
69、t;<p> 三,我國工程項目管理的對策</p><p><b> 1.創(chuàng)新</b></p><p> 創(chuàng)新是一個民族進步的靈魂,是一個國家興旺發(fā)達的不竭動力,也是一個企業(yè)贏得競爭勝利和保持優(yōu)勢的可靠保證。目前,我們的企業(yè)管理還過于粗放、松弛、缺乏科學管理,遠遠適應不了市場形勢的發(fā)展要求,因而加強和創(chuàng)新企業(yè)管理顯得尤為迫切和重要。施工企業(yè)的項目管理
70、創(chuàng)新包括觀念創(chuàng)新、制度創(chuàng)新、技術創(chuàng)新和方法創(chuàng)新。觀念創(chuàng)新是動力,制度創(chuàng)新是前提,技術創(chuàng)新是源泉,方法創(chuàng)新是保障。</p><p> (1)、觀念創(chuàng)新是動力</p><p> 當前,隨著市場競爭白熱化,施工企業(yè)的生存和發(fā)展受到強大的挑戰(zhàn),特別作為長期依賴鐵路施工的傳統(tǒng)企業(yè),由于市場發(fā)展趨勢,鐵路、公路、水利、市政等工程建設,工程造價和單價大幅度降低,提質(zhì)不提價,使得企業(yè)運作成本加大,利潤
71、所剩無幾,甚至是虧本經(jīng)營。為此,企業(yè)必須適時調(diào)整戰(zhàn)略,更新觀念,加大管理力度。</p><p> ?。?)、制度創(chuàng)新是前提</p><p> 項目管理制度是施工企業(yè)經(jīng)營管理機制的重要組成部分,只有建立了科學高效的項目管理制度,項目才能給企業(yè)帶來預期的效益,并開拓源源不斷的市場??茖W合理地設置項目部,做到人員精干高效,協(xié)調(diào)控制有力,實現(xiàn)項目人力資源、技術資源、設備資源等要素的最優(yōu)組合,強化
72、以責任成本管理為中心的各項管理,是創(chuàng)新工作的難點,其重點是要加強工程項目的現(xiàn)場管理創(chuàng)新,提高項目管理水平,核心是全面優(yōu)化施工組織設計,強化工程項目過程控制,建立科學的激勵、約束、監(jiān)督機制。主要措施是實施項目動態(tài)管理和彈性用工制度,強化質(zhì)量、效益意識,提高責任成本管理水平,立足于項目,著力于項目管理,使項目成為企業(yè)利潤的重要來源。</p><p> ?。?)、技術創(chuàng)新是源泉</p><p>
73、 當今的世界,已進入科技昌明的時代。項目管理要創(chuàng)新,離不開技術創(chuàng)新。首先要積極推廣新技術應用。建設部推廣的十項新技術,是國內(nèi)建筑業(yè)技術創(chuàng)新的集大成者,我們在許多項目工程中已應用推廣。昌吉世紀花園工程,2003年榮獲自治區(qū)優(yōu)質(zhì)工程新疆建筑工程天山獎,因在施工中廣泛應用新技術、新材料、新工藝,被建設部授予“國家建筑節(jié)能示范工程”和“國家康居示范工程”。婦保院二期擴建工程,應用了8項新技術,被評為浙江省科技示范工程,該工程繼獲得市優(yōu)、省優(yōu)工
74、程后,已申報中國建筑工程“魯班獎”。其次是項目中開展群眾性的QC攻關活動,是技術創(chuàng)新的又一重要手段,我們在這方面常抓不懈,取得顯著成果。到目前為止,已有5項成果獲國家級獎,11項成果獲省級一、二等獎,8項成果獲市級一、二、三等獎。其三是加快人才培養(yǎng),為項目技術創(chuàng)新提供保證。為適應建設項目領域不斷發(fā)展和項目科技含量不斷提高的需要,必須加快高新人才的引進、培養(yǎng)和使用。以重點工程為舞臺,加快培養(yǎng)青年人才群體,委派他們擔任項目經(jīng)理助理、項目工程
75、師等職務,讓他們在施工第一線掛職鍛煉。</p><p> (4)、方法創(chuàng)新是保障</p><p> 管理方法創(chuàng)新是項目管理有機處理和協(xié)調(diào)好工期、質(zhì)量、成本多項目標的關鍵,是項目管理成敗的重要保證。</p><p> 進度控制手段創(chuàng)新。作為進度控制來說,任何一個項目都是一個復雜的系統(tǒng)工程。因此,必須認真編制施工組織設計。只有這樣才能確定工程項目各個階段性的控制點
76、,并從階段性的成功取得最后的成功。</p><p> 質(zhì)量管理方法創(chuàng)新。質(zhì)量是企業(yè)的生命,企業(yè)要獲得市場主要靠質(zhì)量。質(zhì)量控制核心是落實質(zhì)量責任,應當堅持做到時間再緊程序不超越,任務再重標準不降低,條件再差要求不放松。通過質(zhì)量控制手段和管理方法的創(chuàng)新,實現(xiàn)不斷創(chuàng)優(yōu)和鑄造精品工程的目標,贏得客戶滿意,從而不斷開拓新領域,占領新市場,最終達到市場創(chuàng)新的目的。</p><p> 成本控制措施創(chuàng)
77、新。項目是成本中心,成本控制是至關重要的?!俺杀尽笔瞧髽I(yè)管理的核心問題,絕大多數(shù)管理活動都是圍繞成本而展開的。成本管理是全過程、全方位的管理,從投標承攬任務開始到工程竣工驗交,每一個環(huán)節(jié)每一道工序都要事先預測,認真核算和監(jiān)控。完善的項目合同管理也是成本控制的一項關鍵因素。</p><p> (5)、加強管理創(chuàng)新訓練,提升企業(yè)核心競爭力 </p><p> 其重點是建設一支高素質(zhì)的項目經(jīng)
78、理職業(yè)化隊伍,這是我們當前要解決好的最為關鍵的問題。目前集團項目經(jīng)理的現(xiàn)狀是:數(shù)量不少,結構失衡,素質(zhì)參差不齊,培訓使用脫節(jié),特別是具有豐富實踐經(jīng)驗的優(yōu)秀項目經(jīng)理不多,以致在選用項目經(jīng)理時,經(jīng)常是捉襟見肘。項目經(jīng)理,他上對企業(yè)法人代表負責,下對作業(yè)層負責,在企業(yè)法人代表的授權范圍內(nèi),對外與業(yè)主打交道。因此,項目經(jīng)理必須利用企業(yè)法人代表授予的權力,來實現(xiàn)企業(yè)法人代表委托的責任。與此同時,我們各級組織必須做好以下幾方面的工作:一是重視培養(yǎng)項
79、目經(jīng)理的素質(zhì)和能力;二是把好選拔任用關。要把那些有本事、靠得住的優(yōu)秀人才,選拔充實到項目經(jīng)理崗位上來。選好用好人是項目管理取得成功的決定因素。</p><p><b> 2.可持續(xù)發(fā)展</b></p><p> 從20世紀80年代的“魯布格經(jīng)驗”到今天,項目管理對建筑業(yè)的發(fā)展起到了無法替代的作用。但是由于建筑業(yè)一方面為人類建筑美好的居住空間,同時又對環(huán)境產(chǎn)生一定的
80、破壞。例如:由于建筑工業(yè)大量使用合成的化工材料,使得一些含有二氧化硫、二氧化氮、鹵化物的材料暴露在大氣中或與在自然的氧化作用下,釋放出相應的氣態(tài)化合物;在施工過程中產(chǎn)生的噪音污染;由于機械化施工而產(chǎn)生的機械廢氣;施工過程中產(chǎn)生的大量的固態(tài)建筑垃圾等。</p><p> 因此,在人們?nèi)找嬷匾暛h(huán)境問題的今天,可持續(xù)發(fā)展越來越成為人們關注的熱點,然而可持續(xù)發(fā)展關注的熱點主要集中于土地、自然資源等不可再生資源的可持續(xù)利
81、用上,集中于經(jīng)濟發(fā)展的可持續(xù)研究上,忽視了對人們行為的主要對象——項目進行可持續(xù)性研究。如何從可持續(xù)發(fā)展的角度來推廣和發(fā)展項目管理的組織方法和實施方法,是當今項目管理領域的一個很有意義的話題。工程項目的可持續(xù)發(fā)展管理雖然只是可持續(xù)發(fā)展的一個非常細小的分支,但是如果我們能夠“勿以善小而不為”的態(tài)度去認真的從事工程項目的管理工作,可持續(xù)發(fā)展在不遠的將來一定會成功。</p><p><b> 四,結語<
82、;/b></p><p> 總之,面對即將到來的21世紀,積極推進我國建筑施工企業(yè)的創(chuàng)新,努力探索適合中國國情、融合國際管理慣例的工程項目管理的新經(jīng)驗和新模式,具有十分重要的意義。堅持創(chuàng)新,勇于探索,不斷總結,豐富提高,我國的工程項目管理一定能夠創(chuàng)造新的經(jīng)驗,取得新的豐碩成果。</p><p><b> 參考文獻:</b></p><p&
83、gt; ?。?)丁士昭,《建筑工程項目管理》,中國建筑工為出版社,1987</p><p> ?。?)(美)J.D.費雷姆,《新項目管理》,北京:世界圖書出版社,2001</p><p> ?。?)(美)笠茲納著,楊愛華,楊磊,王增東等譯,《項目管理計劃、進度和控制的系統(tǒng)方法》,北京:電子工業(yè)出版社,2002</p><p> ?。?)趙濤,潘欣鵬,《項目整體管理》
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經(jīng)權益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 眾賞文庫僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
- 6. 下載文件中如有侵權或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 淺析土木工程的發(fā)展趨勢
- 淺析土木工程項目管理的對策
- 淺析土木工程的現(xiàn)狀及發(fā)展趨勢
- 土木工程發(fā)展趨勢探討
- 探討土木工程發(fā)展趨勢
- 外文翻譯--土木工程項目管理的實現(xiàn)
- 淺析土木工程技術及其發(fā)展趨勢
- 淺析土木工程技術及其發(fā)展趨勢
- 土木工程發(fā)展趨勢及展望分析
- 土木工程發(fā)展趨勢及展望分析
- 淺析土木工程施工技術及發(fā)展趨勢
- 土木工程外文資料翻譯
- 土木工程資料工程項目管理表格全集
- 探究土木工程的現(xiàn)狀及發(fā)展趨勢
- 土木工程外文翻譯--土木工程簡介
- 工程項目管理的發(fā)展趨勢及對策
- 芻談土木工程項目管理的對策
- 土木工程 外文資料翻譯.doc
- 淺析土木工程的項目管理
- 土木工程畢業(yè)設計外文資料翻譯---淺談土木工程概論
評論
0/150
提交評論