1、Yuan. Fourth section equipment management evaluation system of equipment management evaluation system the 49th article Dg20 valve is missing a wheel below 10 Yuan assessment task force people. Lack of pressure piping and

2、 pressure vessel every 10 Yuan assessment task force people. Pipe header lack of thermometers, pressure vessels and other equipment, each evaluation task force-man 10. Equipment lubrication lack an oil Cup assessment tas

3、k force 10. Equipment lack of lifting rings, 10 of every assessment task force. Each lacked a grounding of electrical equipment line inspection task force people 10. Connecting coupling 10 yuan per one guard checking tas

4、k force people. Power box for each missing one handle 10 Yuan assessment task force people. Lighting box door cover is missing 10 Yuan assessment task force people. Distribution box (Cabinet) lack of direct light bulbs e

5、ach evaluation task force 10. Damaged aluminum signs every 10 Yuan assessment task force people. Free signs every 10 Yuan assessment task force people, sign an unclear task force on assessment of people 10. Valves, inst

6、rument person with no signs each evaluation task force 10. Main steam, water, smoke, wind, gas pipeline, pressure vessel, not according to the standard painting, numbering, labeling the device name and media trends, ...

7、Of the defect log book shall be kept properly, improper lost each of the evaluation responsibility for 100 Yuan. Equipment defects, operators make records in a timely manner and notify maintenance personnel, general main

8、tenance personnel do not process the run not to register each of the runs and overhaul the squad leader checking 50, eliminate less time or refuses to check and repair a monitor 50 defects. Rotating equipment mechanical,

9、 thermal, electrical, oil leakage oil each evaluation task force 10. Leakage of pump packing, retaining ring displacement, damage, drainage holes clogged bearings into the water every 10 Yuan assessment task force peopl

10、e. Oil mirror, oil level gauge not see oil level every 10 Yuan assessment task force people. Equipment damage due to personal negligence, compensation for the value of equipment 50%. Cracking because of bad freezing meas

11、ures each valve, water pump (a) compensation for the value of equipment 30%. Due to operator error or does not enforce strict fuel system and equipment repairman maintenance, improper commissioning equipment parts and da

12、mage, compensation for the value of 50%. Damage to equipment should be promptly reported to the production technology section, undeclared assessment workshop Director 100 Yuan/times. After overhaul, the equipment should

13、be no grease, no corrosion, fouling and powder accumulation and debris-free, not up to the standard assessment charge 20 Yuan each. The construction site should have sufficient lighting and necessary security measures, p

14、rohibiting the jumbled mess of equipment and materials, repair and maintenance work after the finished work should be done before every heads of evaluation the net area is clean contrary to 50 Yuan. Due to maintenance n

15、eeds a temporary mount, cut off the stair railings, open channel cover, should be promptly removed after completion and restoration of offender assessment charge20 Yuan. Related workshop in the 7th month production techn

16、ology section for maintenance scheduling, delayed assessment workshop Director of 50 Yuan a day. Units of the 25th of the month should be material spare parts, machining parts, new plan's biotech Division, day of del

17、ay deducted 10 Yuan. Related workshop at the 27th of the month each month equipment rate tables, maintenance plan, along with the repair records, record check report, automatic device inputs, relay (thermal), protection

18、of investment and the operation of equipment, each day of delay evaluation workshop Director 20 Yuan. Large and minor maintenance projects, the main parts of equipment replacement (including the usual replacement) must b

19、e included in file, repair does not fill within a week after delayed one day assessment task force 10. (Production technology section after each big, minor repairs to equipment file check) monthly preventative health che

20、cks and technology organization, workshop Director, regular health checks and technology professionals usually do not make their own arrangements, also included in the assessment (notification form issued). Fails to par

21、ticipate in the examination, assessment of 50 Yuan, late examination 20. Biotech company, 30th totals monthly maintenance plan completion, equipment, equipment inspection, test, and report to the Department of business a

22、dministration. Fifth section receiving equipment and materials use rule 50th expendable materials: 1, without planning or competent Vice President signature, financial process, led by the payment processing fee. 2, maint

23、enance ... Material fee. 3, without a regular testing in biotech, identified in accordance with the scheme, and no maintenance projects or maintenance are not material loss paid by the material the material cost, Directo

24、r of the task force on assessment of 100 Yuan. 4, repair work after the unused material into submission in a timely manner should be properly preserved, found in the field or on the flight, from the employer to pay the

25、cost of materials (welders responsible for the electrode), and evaluation of 50 Yuan. 5, materials and equipment for private use and fraud, found accountable, paid for by the responsible materials, equipment, and Directo

26、r of the task force on assessment of 50% performance-related pay. 6, approval to use high quality steel products instead of ordinary steel, offender assessment 50 at a time, instead of 20, 45th for ordinary steel steam-p

27、ressure part and shaft each time check of 100 Yuan (constituted separately). 7, the material does not write specifications, models or wrong specification, do not write, at the material time, each examination 20. 8, plan

28、no materials and Director of the task force (or Director) 20 signatures each assessment. 9, attend monthly analysis of materials (Director, material part) late check 20 Yuan, lack of assessment 50 Yuan. 51st equipment an

29、d spare parts: 1, needed by the industry and trade company to repurchase workshop materials, accessories, equipment, shop no, led by the workshop Director and approved the scheme awarded in full. Workshop 2, requisition

30、ing equipment and accessories to strict quality control, and quality problems in using the專業(yè)編寫(xiě) 專業(yè)編寫(xiě)中央廚房項(xiàng)目可行性研究報(bào)告 中央廚房項(xiàng)目可行性研究報(bào)告《十三五規(guī)劃》 《十三五規(guī)劃》核心提示 核心提示:中央廚房項(xiàng)目投資環(huán)境分析,中央廚房項(xiàng)目背景和發(fā)展概況,中央廚房項(xiàng)目建設(shè)的必要性,中央廚房行業(yè)競(jìng)爭(zhēng)格局分析,中央廚房行業(yè)財(cái)務(wù)指標(biāo)分析參考,中

31、央廚房行業(yè)市場(chǎng)分析與建設(shè)規(guī)模,中央廚房項(xiàng)目建設(shè)條件與選址方案,中央廚房項(xiàng)目不確定性及風(fēng)險(xiǎn)分析,中央廚房行業(yè)發(fā)展趨勢(shì)分析 提供國(guó)家發(fā)改委( 提供國(guó)家發(fā)改委(甲、乙、丙 甲、乙、丙)級(jí)資質(zhì) )級(jí)資質(zhì)中投信德——專業(yè)編寫(xiě)各類(lèi)商務(wù)報(bào)告【主要用途】 【主要用途】發(fā)改委立項(xiàng)、政府批地 發(fā)改委立項(xiàng)、政府批地 、貸款融資、環(huán)評(píng)、申請(qǐng)國(guó)家補(bǔ)助資金等 、貸款融資、環(huán)評(píng)、申請(qǐng)國(guó)家補(bǔ)助資金等【交付方式】特快專遞、 【交付方式】特快專遞、E-mail 【交付

32、時(shí)間】 【交付時(shí)間】2-3 個(gè)工作日 個(gè)工作日 【報(bào)告格式】 【報(bào)告格式】Word 格式、 格式、PDF 格式 格式 【報(bào)告價(jià)格】此報(bào)告為委托項(xiàng)目報(bào)告,具體價(jià)格根據(jù)具體的要求協(xié)商 【報(bào)告價(jià)格】此報(bào)告為委托項(xiàng)目報(bào)告,具體價(jià)格根據(jù)具體的要求協(xié)商【工 【工 程 師】 師】高建 高建(先生) (先生)會(huì)給您滿意的答復(fù) 會(huì)給您滿意的答復(fù)【報(bào)告說(shuō)明 報(bào)告說(shuō)明】 本報(bào)告是針對(duì)行業(yè)投資可行性研究咨詢服務(wù)的專項(xiàng)研究報(bào)告, 此報(bào)告為個(gè)性化定制服務(wù)報(bào)告,我們

33、將根據(jù)不同類(lèi)型及不同行業(yè)的項(xiàng)目提出的具體要求,修訂報(bào)告目錄, 并在此目錄的基礎(chǔ)上重新完善行業(yè)數(shù)據(jù)及分析內(nèi)容, 為企業(yè)項(xiàng)目立項(xiàng)、批地、融資提供全程指引服務(wù)。 可行性研究報(bào)告是在制定某一建設(shè)或科研項(xiàng)目之前,對(duì)該項(xiàng)目實(shí)施的可能 可能性、有效性 性、有效性、技術(shù)方案 技術(shù)方案及行業(yè)政策 行業(yè)政策進(jìn)行具體、深入、細(xì)致的技術(shù)論證 技術(shù)論證和經(jīng)濟(jì)評(píng) 經(jīng)濟(jì)評(píng)Yuan. Fourth section equipment management evalua

34、tion system of equipment management evaluation system the 49th article Dg20 valve is missing a wheel below 10 Yuan assessment task force people. Lack of pressure piping and pressure vessel every 10 Yuan assessment task f

35、orce people. Pipe header lack of thermometers, pressure vessels and other equipment, each evaluation task force-man 10. Equipment lubrication lack an oil Cup assessment task force 10. Equipment lack of lifting rings, 10

36、of every assessment task force. Each lacked a grounding of electrical equipment line inspection task force people 10. Connecting coupling 10 yuan per one guard checking task force people. Power box for each missing one h

37、andle 10 Yuan assessment task force people. Lighting box door cover is missing 10 Yuan assessment task force people. Distribution box (Cabinet) lack of direct light bulbs each evaluation task force 10. Damaged aluminum s

38、igns every 10 Yuan assessment task force people. Free signs every 10 Yuan assessment task force people, sign an unclear task force on assessment of people 10. Valves, instrument person with no signs each evaluation task

39、 force 10. Main steam, water, smoke, wind, gas pipeline, pressure vessel, not according to the standard painting, numbering, labeling the device name and media trends, ... Of the defect log book shall be kept properly, i

40、mproper lost each of the evaluation responsibility for 100 Yuan. Equipment defects, operators make records in a timely manner and notify maintenance personnel, general maintenance personnel do not process the run not to

41、register each of the runs and overhaul the squad leader checking 50, eliminate less time or refuses to check and repair a monitor 50 defects. Rotating equipment mechanical, thermal, electrical, oil leakage oil each evalu

42、ation task force 10. Leakage of pump packing, retaining ring displacement, damage, drainage holes clogged bearings into the water every 10 Yuan assessment task force people. Oil mirror, oil level gauge not see oil level

43、 every 10 Yuan assessment task force people. Equipment damage due to personal negligence, compensation for the value of equipment 50%. Cracking because of bad freezing measures each valve, water pump (a) compensation for

44、 the value of equipment 30%. Due to operator error or does not enforce strict fuel system and equipment repairman maintenance, improper commissioning equipment parts and damage, compensation for the value of 50%. Damage

45、to equipment should be promptly reported to the production technology section, undeclared assessment workshop Director 100 Yuan/times. After overhaul, the equipment should be no grease, no corrosion, fouling and powder a

46、ccumulation and debris-free, not up to the standard assessment charge 20 Yuan each. The construction site should have sufficient lighting and necessary security measures, prohibiting the jumbled mess of equipment and mat

47、erials, repair and maintenance work after the finished work should be done before every heads of evaluation the net area is clean contrary to 50 Yuan. Due to maintenance needs a temporary mount, cut off the stair railing

48、s, open channel cover, should be promptly removed after completion and restoration of offender assessment charge中國(guó)咨詢領(lǐng)域創(chuàng)新引領(lǐng)者,可研領(lǐng)域編寫(xiě)專家!20 Yuan. Related workshop in the 7th month production technology section for maintenanc

49、e scheduling, delayed assessment workshop Director of 50 Yuan a day. Units of the 25th of the month should be material spare parts, machining parts, new plan's biotech Division, day of delay deducted 10 Yuan. Related

50、 workshop at the 27th of the month each month equipment rate tables, maintenance plan, along with the repair records, record check report, automatic device inputs, relay (thermal), protection of investment and the operat

51、ion of equipment, each day of delay evaluation workshop Director 20 Yuan. Large and minor maintenance projects, the main parts of equipment replacement (including the usual replacement) must be included in file, repair d

52、oes not fill within a week after delayed one day assessment task force 10. (Production technology section after each big, minor repairs to equipment file check) monthly preventative health checks and technology organizat

53、ion, workshop Director, regular health checks and technology professionals usually do not make their own arrangements, also included in the assessment (notification form issued). Fails to participate in the examination,

54、 assessment of 50 Yuan, late examination 20. Biotech company, 30th totals monthly maintenance plan completion, equipment, equipment inspection, test, and report to the Department of business administration. Fifth section

55、 receiving equipment and materials use rule 50th expendable materials: 1, without planning or competent Vice President signature, financial process, led by the payment processing fee. 2, maintenance ... Material fee. 3,

56、without a regular testing in biotech, identified in accordance with the scheme, and no maintenance projects or maintenance are not material loss paid by the material the material cost, Director of the task force on asses

57、sment of 100 Yuan. 4, repair work after the unused material into submission in a timely manner should be properly preserved, found in the field or on the flight, from the employer to pay the cost of materials (welders r

58、esponsible for the electrode), and evaluation of 50 Yuan. 5, materials and equipment for private use and fraud, found accountable, paid for by the responsible materials, equipment, and Director of the task force on asses

59、sment of 50% performance-related pay. 6, approval to use high quality steel products instead of ordinary steel, offender assessment 50 at a time, instead of 20, 45th for ordinary steel steam-pressure part and shaft each

60、time check of 100 Yuan (constituted separately). 7, the material does not write specifications, models or wrong specification, do not write, at the material time, each examination 20. 8, plan no materials and Director of

61、 the task force (or Director) 20 signatures each assessment. 9, attend monthly analysis of materials (Director, material part) late check 20 Yuan, lack of assessment 50 Yuan. 51st equipment and spare parts: 1, needed by

62、the industry and trade company to repurchase workshop materials, accessories, equipment, shop no, led by the workshop Director and approved the scheme awarded in full. Workshop 2, requisitioning equipment and accessories

63、 to strict quality control, and quality problems in using the主要用途立項(xiàng) 主要用途立項(xiàng) 批地 批地 融資 融資 環(huán)評(píng) 環(huán)評(píng) 銀行貸款 銀行貸款 3第一節(jié) 中央廚房項(xiàng)目背景 一、中央廚房項(xiàng)目名稱 二、中央廚房項(xiàng)目承辦單位 三、中央廚房項(xiàng)目主管部門(mén) 四、中央廚房項(xiàng)目擬建地區(qū)、地點(diǎn) 五、承擔(dān)可行性研究工作的單位和法人代表 六、中央廚

64、房項(xiàng)目可行性研究報(bào)告編制依據(jù)七、中央廚房項(xiàng)目提出的理由與過(guò)程 第二節(jié) 可行性研究結(jié)論 一、市場(chǎng)預(yù)測(cè)和項(xiàng)目規(guī)模 二、原材料、燃料和動(dòng)力供應(yīng) 三、選址 四、中央廚房項(xiàng)目工程技術(shù)方案 五、環(huán)境保護(hù) 六、工廠組織及勞動(dòng)定員 七、中央廚房項(xiàng)目建設(shè)進(jìn)度 八、投資估算和資金籌措 九、中央廚房項(xiàng)目財(cái)務(wù)和經(jīng)濟(jì)評(píng)論 十、中央廚房項(xiàng)目綜合評(píng)價(jià)結(jié)論 第三節(jié) 主要技術(shù)經(jīng)濟(jì)指標(biāo)表 第四節(jié) 存在問(wèn)題及建議 第二章 第二章 中央廚房項(xiàng)目投資環(huán)境分析 中央廚房項(xiàng)

溫馨提示

  • 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 眾賞文庫(kù)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

評(píng)論

0/150

提交評(píng)論