1、Soft Tech Development Inc.,1,Software Project Tracking,A CMM Level 2Key Process Area,Soft Tech Development Inc.,Soft Tech Development Inc.,2,Purpose,The purpose of Software Project Tracking and Oversight is to provid
2、e adequate visibility into actual progress so that management can take effective actions when the project's performance deviates significantly from the plans.Software Project Tracking and Oversight involves tracking
3、 and reviewing the accomplishments and results against documented estimates, commitments, and plans, and adjusting these plans based on the actual accomplishments and results.,Soft Tech Development Inc.,3,Goals,Goal 1
4、Actual results and performances are tracked against the software plans.Goal 2Corrective actions are taken and managed to closure when actual results and performance deviate significantly from the software plans.Goal 3
5、Changes to software commitments are agreed to by the affected groups and individuals.,Soft Tech Development Inc.,4,Commitment,A project software manager is designated to be responsible for the project's software ac
6、tivities and results.The project follows a written organizational policy for managing the software project.,Soft Tech Development Inc.,5,Ability,A software development plan for the software project is documented and ap
7、proved.The project manager explicitly assigns responsibility for work products and activities.Adequate resources and funding are provided for tracking the software project.The managers are trained in managing the tech
8、nical and personnel aspects of the project.First-line managers receive orientation in the technical aspects of the project.,Soft Tech Development Inc.,6,Activities,A documented software development plan is used for tra
9、cking the software activities and communicating status.The project's software development plan is revised according to a documented procedure.Software project commitments and changes to commitments made to individu
10、als and groups external to the organization are reviewed with senior management according to a documented procedure.,Soft Tech Development Inc.,7,Activities,Approved changes to commitments that affect the software proje
11、ct are communicated to the members of the software engineering group and other software-related groups.The size of the software work products (or size of the changes to the software work products) are tracked, and corre
12、ctive actions are taken as necessary. The project's software effort and costs are tracked, and corrective actions are taken as necessary.,Soft Tech Development Inc.,8,Activities,The project's critical computer r
13、esources are tracked, and corrective actions are taken as necessary.The project's software schedule is tracked, and corrective actions are taken as necessary.Software engineering technical activities are tracked, a
14、nd corrective actions are taken as necessary.The software risks associated with cost, resource, schedule, and technical aspects of the project are tracked.,Soft Tech Development Inc.,9,Activities,Actual measurement dat
15、a and replanning data for the software project are recorded.The software engineering group conducts periodic internal reviews to track technical progress, plans, performance, and issues against the software development
16、plan.Formal reviews to address the accomplishments and results of the software project are conducted at selected project milestones according to a documented procedure.,Soft Tech Development Inc.,10,Measures,Measuremen
17、ts are made and used to determine the status of the software tracking and oversight activities.Examples of measurements include:effort and other resources expended in performing the tracking and oversight activities; a
18、ndchange activity for the software development plan, which includes changes to size estimates of the software work products, software cost estimates, critical computer resource estimates, and schedule.,Soft Tech Develo
19、pment Inc.,11,Verification,The activities for project tracking and oversight are reviewed with senior management on a periodic basis.The activities for project tracking and oversight are reviewed with the project manage
20、r on both a periodic and event-driven basis.The software quality assurance group reviews and/or audits the activities and work products for project tracking and oversight and reports the results.,Soft Tech Development
21、Inc.,12,Coverage – Goal 1,Actual results and performance are tracked against the plans,The software group uses the project plan AC 1 and conducts periodic internal reviews AC12 to track: product size AC 5 effort and co
22、st AC 6 critical computer resources AC 7 project schedule AC 8 technical activities AC 9 project risks AC 10,Measurement and re-planning data are recorded AC 11,Formal reviews are help at key milestones AC 13,Soft Te
23、ch Development Inc.,13,Coverage – Goal 2,Corrective actions are taken and managed to closure,The following are tracked and corrective actions taken: product size AC 5 effort and cost AC 6 critical computer resources
24、AC 7 project schedule AC 8 technical activities AC 9,Measurement and re-planning data are recorded AC 11,The project plan is revised using a documented procedure AC 2,Soft Tech Development Inc.,14,Coverage – Goal 3,Ch
25、anges to commitments are agreed,Commitments and changes to commitments with external groups are reviewed with senior management using a procedure AC 3,Approved changes to commitments are communicated to the software team
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經(jīng)權益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 眾賞文庫僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
- 6. 下載文件中如有侵權或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 軟件項目跟蹤管理研究與系統(tǒng)實現(xiàn).pdf
- 軟件項目健康跟蹤控制系統(tǒng)的構建.pdf
- 軟件開發(fā)項目缺陷跟蹤管理系統(tǒng)的設計與實現(xiàn).pdf
- 基于CMM-CMMI的軟件項目跟蹤與監(jiān)控方法研究.pdf
- 面向領域的圖像跟蹤軟件架構與跟蹤算法研究.pdf
- 小組軟件過程中的軟件計劃與跟蹤.pdf
- 軟件工程英文答案
- 外文翻譯(英文)---高壓水下焊縫跟蹤技術
- 擔保項目跟蹤監(jiān)督流程
- 項目的跟蹤和控制
- 項目軟件項目驗收說明
- 項目軟件項目驗收說明
- 12144117軟件項目
- 軟件項目1
- 軟件項目管理
- 項目軟件項目驗收說明
- it軟件項目管理
- 12144117軟件項目
- 基于本體的軟件需求跟蹤的研究.pdf
- 專項咨詢項目跟蹤服務表
評論
0/150
提交評論