版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、SH3503–J539高、低壓開(kāi)關(guān)柜安裝檢查記錄HVLVswitchcabiinstallationinspectionrecd工程名稱Projectdeion:?jiǎn)卧QUnitdeion:名稱Deion圖號(hào)DrawingNo柜號(hào)CabiNo臺(tái)數(shù)Quantity檢查內(nèi)容Inspectioncontent檢查結(jié)果Results1基礎(chǔ)型鋼已共檢合格,且有施工記錄Qualifiedfoundationprofilesteelhasbeensu
2、ppliedconstructionrecdsareavailable.盤頂部水平偏差Paneltophizontaldeviation柜面偏差Cabisurfacedeviation垂直度Verticality相鄰兩盤Twoneighbingpanels成列盤Arrangedinserial相鄰兩盤Twoneighbingpanels成列盤Arrangedinserial盤間接縫Jointclearancebetweenpanels2
3、柜安裝最大偏差(mm)Max.installationdeviation3外觀、漆層完好,安裝件、備件、操作專用工具、產(chǎn)品技術(shù)文件齊全Theouterappearanceshouldbegoodthepaintingshouldbeintact.Themountingpartssparepartsoperationalspecialtoolsproducttechnicaldocumentsshouldbecomplete.4柜內(nèi)電器安
4、裝牢固,型號(hào)、規(guī)格與設(shè)計(jì)相符Theelectricalpartsinsidethecabiaresecurelyinstalled.Thetypesspecificationsshouldbeincompliancewiththedesign.5柜內(nèi)母線規(guī)格、材質(zhì)、對(duì)地和相間距離符合設(shè)計(jì)和規(guī)范要求Thespecificationsmaterialofthebusinsidethecabidistancetothegroundphases
5、shouldbeincompliancewiththedesignrelevantcode.6母線安裝、連接符合規(guī)范要求,連接螺栓應(yīng)用力矩扳手緊固Theinstallationconnectionofthebusshouldcomplywiththerequirementsofrelevantcode.Theconnectingboltsshouldbetightenedbymeansofatquespanner.7柜體、抽屜、小車接地
6、齊全,牢固可靠Thecabibodydrawertrolleyshouldbeallgroundedinasecurereliablemanner.8抽屜、小車推拉靈活,同型號(hào)能互換,主觸頭及二次回路連接插件接觸良好Thedrawertrolleyshouldbeabletomovefreely.Sametypeofdrawerstrolleysshouldbeinterchangeable.Themaincontactshouldbe
7、ingoodcontactwiththeconnectioncardofthesecondarycircuit.9防止電氣誤操作的“五防”裝置齊全,動(dòng)作靈活可靠The“Fiveprevention”devicesagainstwrongelectricaloperationshouldbeallavailablecanactivatereliably.10校驗(yàn)一、二次回路,接線準(zhǔn)確,連接可靠,標(biāo)志齊全Calibratetheprimar
8、ysecondarycircuits.Thewiringshouldbecrectconnectionreliableidentificationmarkscomplete.11繼電器試驗(yàn)記錄Takerelaytestrecd.12電氣測(cè)量?jī)x表檢驗(yàn)記錄Takeelectricinstrumentsinspectionrecd.13電氣設(shè)備交接試驗(yàn)記錄Takeelectricalequipmentturnovertestrecd.14電氣
9、模擬試驗(yàn)Conductelectricalsimulationtest15受電前檢查,柜內(nèi)清掃、擦拭干凈Cleantheinsideofthecabibefeenergization.16測(cè)量絕緣電阻Measuretheinsulationresistance.17相序檢查及核相Checkphasesequenceverifyphases.受電日期Energizationdate:年Y月M日D時(shí)H分M結(jié)論Conclusion備注Rema
10、rks建設(shè)監(jiān)理單位OwnerSupervisionUnit施工單位ConstructionUnit專業(yè)工程師DisciplineEngineer:年(Y)月(M)日(D)技術(shù)負(fù)責(zé)人TechnicalResponsiblePerson:質(zhì)量檢查員QualityInspect:班(組)長(zhǎng)GroupLeader:年(Y)月(M)日(D)SH3503–J539高、低壓開(kāi)關(guān)柜安裝檢查記錄HVLVswitchcabiinstallationinsp
11、ectionrecd工程名稱Projectdeion:?jiǎn)卧QUnitdeion:名稱Deion圖號(hào)DrawingNo柜號(hào)CabiNo臺(tái)數(shù)Quantity檢查內(nèi)容Inspectioncontent檢查結(jié)果Results1基礎(chǔ)型鋼已共檢合格,且有施工記錄Qualifiedfoundationprofilesteelhasbeensuppliedconstructionrecdsareavailable.盤頂部水平偏差Paneltophiz
12、ontaldeviation柜面偏差Cabisurfacedeviation垂直度Verticality相鄰兩盤Twoneighbingpanels成列盤Arrangedinserial相鄰兩盤Twoneighbingpanels成列盤Arrangedinserial盤間接縫Jointclearancebetweenpanels2柜安裝最大偏差(mm)Max.installationdeviation3外觀、漆層完好,安裝件、備件、操作
13、專用工具、產(chǎn)品技術(shù)文件齊全Theouterappearanceshouldbegoodthepaintingshouldbeintact.Themountingpartssparepartsoperationalspecialtoolsproducttechnicaldocumentsshouldbecomplete.4柜內(nèi)電器安裝牢固,型號(hào)、規(guī)格與設(shè)計(jì)相符Theelectricalpartsinsidethecabiaresecure
14、lyinstalled.Thetypesspecificationsshouldbeincompliancewiththedesign.5柜內(nèi)母線規(guī)格、材質(zhì)、對(duì)地和相間距離符合設(shè)計(jì)和規(guī)范要求Thespecificationsmaterialofthebusinsidethecabidistancetothegroundphasesshouldbeincompliancewiththedesignrelevantcode.6母線安裝、連接
15、符合規(guī)范要求,連接螺栓應(yīng)用力矩扳手緊固Theinstallationconnectionofthebusshouldcomplywiththerequirementsofrelevantcode.Theconnectingboltsshouldbetightenedbymeansofatquespanner.7柜體、抽屜、小車接地齊全,牢固可靠Thecabibodydrawertrolleyshouldbeallgroundedinas
16、ecurereliablemanner.8抽屜、小車推拉靈活,同型號(hào)能互換,主觸頭及二次回路連接插件接觸良好Thedrawertrolleyshouldbeabletomovefreely.Sametypeofdrawerstrolleysshouldbeinterchangeable.Themaincontactshouldbeingoodcontactwiththeconnectioncardofthesecondarycircui
17、t.9防止電氣誤操作的“五防”裝置齊全,動(dòng)作靈活可靠The“Fiveprevention”devicesagainstwrongelectricaloperationshouldbeallavailablecanactivatereliably.10校驗(yàn)一、二次回路,接線準(zhǔn)確,連接可靠,標(biāo)志齊全Calibratetheprimarysecondarycircuits.Thewiringshouldbecrectconnectionrel
18、iableidentificationmarkscomplete.11繼電器試驗(yàn)記錄Takerelaytestrecd.12電氣測(cè)量?jī)x表檢驗(yàn)記錄Takeelectricinstrumentsinspectionrecd.13電氣設(shè)備交接試驗(yàn)記錄Takeelectricalequipmentturnovertestrecd.14電氣模擬試驗(yàn)Conductelectricalsimulationtest15受電前檢查,柜內(nèi)清掃、擦拭干凈Cl
19、eantheinsideofthecabibefeenergization.16測(cè)量絕緣電阻Measuretheinsulationresistance.17相序檢查及核相Checkphasesequenceverifyphases.受電日期Energizationdate:年Y月M日D時(shí)H分M結(jié)論Conclusion備注Remarks建設(shè)監(jiān)理單位OwnerSupervisionUnit施工單位ConstructionUnit專業(yè)工程師
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 眾賞文庫(kù)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- j539
- 劉洪波閱讀考點(diǎn)詞539
- 劉洪波閱讀考點(diǎn)詞539
- jjg 539-1997 數(shù)字指示稱
- 復(fù)試科目考試大綱-539西方文論
- (中醫(yī)資料)539-陸地仙經(jīng)
- 539.兩兩多重比較的fdr控制
- jjg539-2016數(shù)字指示秤檢定規(guī)程
- jjg539-2015數(shù)字指示秤檢定規(guī)程
- 道539偃師山化至顧營(yíng)房口改建
- jjg539-2016數(shù)字指示秤檢定規(guī)程宣貫
- jjg 539-2016 數(shù)字指示秤檢定規(guī)程
- 有向kirkman填充設(shè)計(jì)dkpd{3,539;},v
- 《新標(biāo)準(zhǔn)漢語(yǔ)》與《實(shí)用漢語(yǔ)》的比較研究_539.pdf
- 道539偃師山化至顧營(yíng)房口改建工程
- 哈爾濱音樂(lè)名城形成的社會(huì)史考察_539.pdf
- 帶洞的圈設(shè)計(jì)和(539;r,839;s)圈系
- 54156.酶法生產(chǎn)539;核苷酸上游工藝的研究
- 539.當(dāng)代大學(xué)生網(wǎng)絡(luò)自律意識(shí)教育研究
- ??!yc539-螺紋在線加工部件結(jié)構(gòu)設(shè)計(jì)說(shuō)明書(shū)
評(píng)論
0/150
提交評(píng)論