1、<p><b> 中文3018字</b></p><p> Comparison of Design and Analysis of Concrete Gravity Dam</p><p><b> ABSTRACT</b></p><p> Gravity dams are solid concret
2、e structures that maintain their stability against design loads from the geometric shape, mass and strength of the concrete.The purposes of dam construction may include navigation, flood damage reduction,hydroelectric po
3、wer generation, fish and wildlife enhancement,water quality,water supply,and recreation.The design and evaluation of concrete gravity dam for earthquake loading must be based on appropriate criteria that reflect both the
4、 desired level of safety and t</p><p> Keywords: Comparison Concrete Gravity Dam Dam Failure Design Earthquake Intensity Perturbation Stability and Stress </p><p> 1.Introduction</p>
5、;<p> Basically, a gravity concrete dam is defined as a structure,which is designed in such a way that its own weight resists the external forces. It is primarily the weight of a gravity dam which prevents it fro
6、m being overturned when subjected to the thrust of impounded water [1]. This type of structure is durable, and requires very little maintenance. Gravity dams typically consist of a non overflow section(s) and an overflow
7、 section or spillway. The two general concrete construction methods for co</p><p> However, concrete gravity dams are preferred these days and mostly constructed. They can be constructed with ease on any da
8、m site, where there exists a natural foundation strong enough to bear the enormous weight of the dam. Such a dam is generally straight in plan, although sometimes, it may be slightly curve. The line of the upstream face
9、of the dam or the line of the crown of the dam if the upstream face in sloping, is taken as the reference line for layout purposes, etc. and is known as the </p><p> A typical cross-section of a high concre
10、te gravity dam is shown in Figure . The upstream face may be kept throughout vertical or partly slanting for some of its length. A drainage gallery is generally provided in order to relieve the uplift pressure exerted b
11、y the seeping water.Purposes applicable to dam construction may include navigation, flood damage reduction, hydroelectric power generation, fish and wildlife enhancement, water quality, water supply, and recreation.</
12、p><p> Many concrete gravity dams have been in service for over 50 years, and over this period important advances in the methodologies for evaluation of natural phenomena hazards have caused the design-basis e
13、vents for these dams to be revised upwards. Older existing dams may fail to meet revised safety criteria and structural rehabilitation to meet such criteria may be costly and difficult. The identified causes of failure,
14、based on a study of over 1600 dams [4] are: Foundation problems (40%), Inadequ</p><p><b> 2.Loads </b></p><p> In the design of gravity concrete, it is essential to determine the l
15、oads required in the stability and stress analyses. The forces which may affect the design are: 1) Dead load or stabilizing force; 2) Headwater and tailwater pressures; 3) Uplift; 4) Temperature; 5) Earth and silt pressu
16、res; 6) Ice pressure; 7) Earth quake forces; 8) Wind pressure; 9) Subatmospheric pressure; 10) Wave pressure, and 11) Reaction of foundation. </p><p> The seismic safety of such dams has been a serious conc
17、ern since damage to the Koyna Dam in India in 1967 which has been regarded as a watershed event in the development of seismic analysis and design of concrete gravity dams all over the world. It is essential that those re
18、sponsible must implement policies and proce dures to ensure seismic safety of dams through sound professional practices and state-of-the-art in related technical areas. Seismic safety of dams concerns public safety and t
19、heref</p><p> 2.1. Water Pressure </p><p> Water pressure (P) is the most major external force acting on gravity dams. The horizontal water pressure exerted by the weight of water stored on th
20、e upstream and downstream sides of the dam can be estimated from the rule of hydrostatic pr essure distribution and can be expressed by </p><p> where, H is the depth of water and is the unit weight of wate
21、r. </p><p> 2.2. Uplift Pressure </p><p> Water seepage through the pores, cracks and fissures of the foundation materials, and water seepage through dam body and then to the bottom through th
22、e joints between the body of the dam and its foundation at the base exert an uplift pressure on the base of the dam. According to the [6], the uplift pressure intensities at the heel and toe of the dam should be taken eq
23、ual to their respective hydrostatic pressures and joined the intensity ordinates by a straight line. When drainage galleries are p</p><p> 2.3. Earthquake Forces </p><p> An earthquake produce
24、s waves, which are capable of shaking the earth upon which the gravity dams rest, in every possible direction. The effect of an earthquake is, therefore, equivalent to imparting acceleration to the foundations of the da
25、ms in the direction in which the wave is traveling at the moment. </p><p> Generally, an earthquake induces horizontal acceleration (h) and vertical acc eleration (v). The values of these accelerations are
26、generally expressed as per centage of the acceleration due to gravity (g), i.e.,= 0.10 g or 0.20 g, etc. On an average, a value of ? equal to 0.10 to 0.15 g is generally sufficient for high dams in seismic zones. In ext
27、remely seismic regions and in conservative Designs even a value up to 0.30 g may sometimes be adopted [7]. </p><p> Earthquake loadings should be checked for horizontal as well as vertical earth quake accel
28、erations. While earthquake acceleration might take place in any direc tion,the analysis should be performed for the most unfavorable direction. </p><p> The earthquake loadings used in the design of concret
29、e gravity dams are based on design earthquakes and sitespecific motions determined from seismological eva luation. At a minimum, a seismological evaluation should be performed on all pro jects located in seismic zones 1
30、, 2, and 3 of Bangladesh [8], depending upon the severity of earthquakes. </p><p> The seismic coefficient method of analysis should be used in determining the resultant location and sliding stability of da
31、ms. In strong seismicity areas, a dynamic seismic analysis is required for the internal stress analysis. </p><p> 2.3.1. Effect of Vertical Acceleration (ɑv) </p><p> A vertical acceleration m
32、ay either act downward or upward. When it acts in the upward direction, then the foundation of the dam will be lifted upward and becomes closer to the body of the dam, and thus the effective weight of the dam will increa
33、se and hence, the stress developed will increase. </p><p> When the vertical acceleration acts downward, the foundation shall try to move downward away from the dam body; thus, reducing the effective weight
34、 and the stability of the dam, and hence is the worst case for design. The net effective weight of the dam is given by </p><p><b> (2)</b></p><p> where, W is the total weight of t
35、he dam, kv is the fraction of gravity adopted for vertical acceleration, such as 0.10 or 0.20, etc. </p><p> In other words, vertical acceleration reduces the unit weight of the dam material and that of wa
36、ter to (1 – kv) times their original unit weights. </p><p> 2.3.2. Effects of Horizontal Acceleration (ɑh) </p><p> The horizontal acceleration may cause 1) hydrodynamic pressure, and 2) horiz
37、ontal inertia force. </p><p> Hydrodynamic Pressure: Horizontal acceleration acting towards the reservoir causes a momentary increase in the water pressure, as the foundation and dam acc elerate towards the
38、 reservoir and the water resists the movement owing to its ine rtia. According to [9], the amount of this hydrodynamic force (Pe) is given by</p><p><b> (3)</b></p><p> where, Cm =
39、 maximum value of pressure coefficient for a given constant slope = 0.735(0θ/ 90) θ , whereθis the angle in degree, which the upstream face of the dam makes with the horizontal; kh = fraction of gravity adopted for horiz
40、ontal acceleration such as αh=kh×g </p><p> The moment of this force about the base is given by </p><p><b> (4)</b></p><p> 2) Horizontal Inertia Force: In addi
41、tion to exerting the hydrodynamic pressure, the horizontal acceleration produces an inertia force into the body of the dam. This force is generated to keep the body and the foundation of the dam together as one piece. T
42、he direction of the produced force will be opposite to the accele ration imparted by the earthquake. </p><p> Since an earthquake may impart either upstream or downstream acceleration, it is needed to choos
43、e the direction of this force in the stability analysis of dam structure in such a way that it produces most unfavorable effects under the consid ered conditions. For example, when the reservoir is full, this force will
44、produce worst results if it is additive to the hydrostatic water pressure, thus Acting towards the downstream (i.e., when upstream earthquake acceleration towards the reservoir is prod</p><p> 原文出自:http://w
45、ww.scirp.org/journal/PaperInformation.aspx?paperID=18185</p><p> 混凝土重力壩的設(shè)計(jì)分析與比較</p><p><b> 摘要</b></p><p> 重力壩是一種堅(jiān)實(shí)的混凝土結(jié)構(gòu).大壩建設(shè)的目的可能包括通航,減少洪水造成的損失,水力發(fā)電,魚(yú)類(lèi)和野生動(dòng)物養(yǎng)殖,蓄水灌溉等.
46、混凝土重力壩的設(shè)計(jì)和評(píng)估地震荷載必須基于適當(dāng)?shù)臉?biāo)準(zhǔn),既能反映所需的安全級(jí)別,也要有設(shè)計(jì)的選擇和評(píng)價(jià)程序.在孟加拉國(guó),整個(gè)國(guó)家被分成3個(gè)地震帶,這取決于地震強(qiáng)度的嚴(yán)重性.因此,本研究的主要目的是設(shè)計(jì)基于U.S.B.R高混凝土重力壩.在孟加拉國(guó)地震帶二區(qū),建議對(duì)不同水平地震強(qiáng)度從0.10g~0.30g和0.50g增量考慮地震烈度,持續(xù)的不確定性和嚴(yán)重程度等其他來(lái)設(shè)計(jì)負(fù)荷。并采用二維分析重心法和有限元法分析其穩(wěn)定性和應(yīng)力條件。水平地震烈度擾動(dòng)
47、的結(jié)果表明,穩(wěn)定力矩被發(fā)現(xiàn),而處理USBR結(jié)果與水平地震強(qiáng)度的增量顯示應(yīng)減少推薦的初始?jí)味?,說(shuō)明危及大壩穩(wěn)定性,提供這樣大的壩段,以增加穩(wěn)定力矩,減少安全故障。垂直使用ANSYS5.4分析獲得的剪切應(yīng)力與使用二維重心法得到的比較,發(fā)現(xiàn)比較少,以2D重心法,除了在重力壩0.10g壩趾主應(yīng)力-0.15g。雖然很明顯,利用ANSYS5.4分析較小壩段可能有足夠的應(yīng)力,但這將是不可能讓較小堤壩部分的安全得到足夠的保障。在穩(wěn)定性分析中可以觀察到,
48、</p><p> 關(guān)鍵詞:比較 混凝土重力壩 潰壩 設(shè)計(jì) 地震強(qiáng)度 穩(wěn)定和應(yīng)力</p><p><b> 介紹</b></p><p> 一般來(lái)說(shuō),重力混凝土壩被定義為通過(guò)利用自重來(lái)達(dá)到抵抗外力這一目的一個(gè)混凝土結(jié)構(gòu),。重力壩主要的重量在承受的蓄水推力[1]下可以防止它被推翻。這種類(lèi)型的結(jié)構(gòu)是非常耐用的,并且只需要很少的維護(hù)。重
49、力壩通常由非溢流壩段(S)和溢流壩段或溢洪道組成。這兩種一般混凝土施工方法在混凝土重力壩是為常規(guī)放置大體積混凝土和碾壓混凝土。在古代重力壩一般由石頭砌筑,最常見(jiàn)于埃及,希臘和羅馬帝國(guó)。</p><p> 然而,混凝土重力大壩是最近大多修建的首選。他們可以輕松在任何壩址構(gòu)造,其中存在一個(gè)天然地基強(qiáng)大到足以承受大壩的巨大重量。這樣的大壩一般是直的,雖然有時(shí)它可能是略微彎曲。大壩或上游面的壩的冠部的線的上游面的傾斜線
50、,被取為用于布局的基準(zhǔn)線,而被稱(chēng)為“基線大壩”或“大壩軸”。當(dāng)在合適條件的情況下,這樣的大壩可以被構(gòu)建很高的高度。底座的寬度和重力壩高度之比一般小于1:1。</p><p> 高混凝土重力壩的典型橫截面正如圖所示,它的上游面可能與大壩的某段長(zhǎng)度保持垂直或部分傾斜。排水道一般是用來(lái)減緩滲出水所產(chǎn)生的浮力,大壩建設(shè)的適用性目的包括航行、降低洪水損失、水力發(fā)電、魚(yú)類(lèi)和野生動(dòng)物的養(yǎng)殖、水質(zhì)、控制供水量和娛樂(lè)。
51、 </p><p> 很多混凝土重力壩的使用壽命為50年,在這期間自然現(xiàn)象災(zāi)害估值方法的重大進(jìn)步也讓堤壩設(shè)計(jì)數(shù)據(jù)需要隨之修改。更早存在的堤壩沒(méi)有改進(jìn)安全標(biāo)準(zhǔn)和結(jié)構(gòu)修復(fù),因?yàn)檫@樣的標(biāo)準(zhǔn)是花費(fèi)過(guò)多而且過(guò)程艱辛。一項(xiàng)對(duì)1600多個(gè)堤壩的研究找到了主要原因:基礎(chǔ)問(wèn)題40%,泄洪口不足23%, 劣質(zhì)工程12%,下沉不勻10%,較高的壓力差5%,戰(zhàn)亂3%,路堤下滑2%,有缺陷的材料2%,操作上的失誤2%,和
52、地震1%。其他關(guān)于潰堤的調(diào)查被引用,而基于這些調(diào)查有人估計(jì)潰堤率從每年的到了。</p><p><b> 2 負(fù)載</b></p><p> 在混凝土重力壩的設(shè)計(jì)中,準(zhǔn)確計(jì)算出荷載的穩(wěn)定性和壓力力分析是非常重要的??赡苡绊懺O(shè)計(jì)的因素是:1、死荷載等穩(wěn)定因素;2、上下游的水壓力;3、地基的沉降;4、溫度;5、土和淤泥的壓力;6、冰的壓力;7、地震因素;8、風(fēng)的壓力;
53、9、低于大氣壓;10、波浪的拍擊壓力11、地基的反應(yīng)。</p><p> 這樣的大壩地震安全性一直是一個(gè)嚴(yán)重問(wèn)題,因?yàn)閾p壞的印度科依納大壩在1967年已在世界各地水壩被視為在混凝土重力壩的設(shè)計(jì)發(fā)展和地震分析的一個(gè)分水嶺事件。有關(guān)技術(shù)領(lǐng)域非常先進(jìn)的的國(guó)家認(rèn)為責(zé)任人必須執(zhí)行的政策和程序,以確保通過(guò)完善的專(zhuān)業(yè)實(shí)踐和大壩抗震安全是至關(guān)重要的。大壩的抗震安全關(guān)乎市民的安全因此需求更高程度的公眾信心。各種力量的估計(jì)和描述在
54、以下各節(jié)簡(jiǎn)要提供。</p><p><b> 2.1水壓</b></p><p> 水壓力(P)是作用在重力壩上最主要的外部力量。水平水壓力通過(guò)存儲(chǔ)在大壩的上游側(cè)和下游側(cè)水的重量來(lái)施加。可從靜壓力分布的規(guī)則來(lái)估計(jì)并可以表示為</p><p><b> ?。?)</b></p><p> 其中,
55、H是水的深度,是單位重量的水。</p><p><b> 2.2 揚(yáng)壓力</b></p><p> 水通過(guò)空隙滲流,基礎(chǔ)材料的裂紋和裂縫,壩體滲水,然后通過(guò)壩體和壩基之間對(duì)大壩產(chǎn)生壓力,根據(jù)6,壩體和壩基之間的壓力強(qiáng)度應(yīng)該等于各自的靜水壓力和直線連接的強(qiáng)度坐標(biāo),為了緩解排水廊道上升,廊道表面的靜水壓力應(yīng)等于根部和頂部靜水壓力的1/3。</p><
56、;p><b> 2.3 地震力</b></p><p> 一場(chǎng)地震會(huì)產(chǎn)生震波,這些震波能夠以每個(gè)可能的方向震動(dòng)重力壩依賴(lài)的土地。因此,一場(chǎng)地震帶來(lái)的影響,相當(dāng)于朝當(dāng)時(shí)震波傳遞的方向給壩的地基加速。</p><p> 通常,一場(chǎng)地震會(huì)引起水平加速度和垂直加速度。這些加速度的值通常用重力加速度的百分比表示出來(lái),如,a=0.10g或者0.20g,等等。一般來(lái)說(shuō),
57、加速度的值在0.10g到0.15g對(duì)地震帶的高壩通常是足夠的。在極端的地震帶,用保守的設(shè)計(jì),甚至有時(shí)一個(gè)0.30g的值都可能被接受。</p><p> 地震荷載(地震力)在水平和垂直方向的地震加速度應(yīng)該被檢查核實(shí)。由于地震加速度可能發(fā)生在任何方向,完成時(shí)最不順的方向應(yīng)該被分析考慮進(jìn)去。</p><p> 在混凝土重力壩設(shè)計(jì)中使用的地震荷載是根據(jù)設(shè)計(jì)的地震和地震評(píng)估確定的點(diǎn)特異性提案。根
58、據(jù)地震的嚴(yán)重程度表現(xiàn),至少要有一個(gè)地震的評(píng)估應(yīng)該對(duì)位于地震區(qū)1,2,3的所有項(xiàng)目來(lái)執(zhí)行,以及孟加拉國(guó)。</p><p> 應(yīng)該運(yùn)用分析地震系數(shù)法來(lái)確定最終位置和滑動(dòng)堤壩的穩(wěn)定性。在強(qiáng)地震活動(dòng)的地區(qū),動(dòng)態(tài)的地震反應(yīng)分析需要對(duì)內(nèi)部進(jìn)行應(yīng)力分析。</p><p> 2.3.1垂直加速度的效果(av)</p><p> 垂直加速度可能向上或者向下。當(dāng)垂直加速度向上時(shí),
59、大壩的壩基就會(huì)被抬上來(lái),靠近大壩的壩體,這樣大壩的實(shí)際重量就會(huì)增加,因此,形成的壓力也會(huì)增加。</p><p> 當(dāng)垂直加速度向下時(shí),大壩的壩基就會(huì)盡量向下移遠(yuǎn)離壩體。這樣就減輕了大壩的實(shí)際重量和破壞大壩的穩(wěn)定性。因此這是對(duì)于設(shè)計(jì)來(lái)說(shuō)最糟糕的了。大壩實(shí)際重量的結(jié)果可以通過(guò)下面這個(gè)公式計(jì)算出來(lái):</p><p><b> ?。?)</b></p><
60、;p> 在這個(gè)式子中,w是大壩的總重,kv是被用作垂直加速度的重力加速度的一部分,例如0.10或0.20等等。</p><p> 換言之,垂直加速度減輕了壩體主堆石料和水的總重,并使其重量降到了它們?cè)鹊目傊兀?-kv)倍。</p><p> 2.3.2水平加速度的效果(ah)</p><p> 水平加速度可能導(dǎo)致水力壓強(qiáng)和水平慣性力。</p&g
61、t;<p> 水力壓強(qiáng):水平加速度朝著水庫(kù)的方向時(shí)會(huì)導(dǎo)致水的壓強(qiáng)會(huì)有瞬間的增加,因?yàn)閴位痛髩斡邢蛩畮?kù)的方向的水平加速度,而水因?yàn)閼T性抵抗住了這種活動(dòng)。由【9】可知,水力的大小可以通過(guò)(3)式來(lái)計(jì)算</p><p><b> ?。?)</b></p><p> 在這個(gè)式子中Cm等于含有已知不變斜率的壓力系數(shù)的最大值,這里的Q是角度,是由大壩朝向上游的
62、一面和水平加速度形成的。Kh等于被用作水平加速度的重力加速度的一部分,例如ah=kh*g.</p><p> 這個(gè)力在底部的瞬時(shí)作用力可以通過(guò)(4)式計(jì)算出來(lái)</p><p><b> ?。?)</b></p><p> 水平慣性力:除了運(yùn)用這種水力壓強(qiáng)以外,水平加速度在壩體產(chǎn)生了一種慣性力。這種慣性力的產(chǎn)生是為了保證壩體和壩基不分離。產(chǎn)生
63、的這種力的方向會(huì)和地震顯示的加速度方向相反。</p><p> 因?yàn)橐粓?chǎng)地震可能顯示出逆流方向的加速度或者是順流方向的加速度。在大壩結(jié)構(gòu)的穩(wěn)定性分析中選擇這個(gè)力的方向是不可缺少的,雖然這個(gè)方式會(huì)產(chǎn)生意料中最不想見(jiàn)的效果。例如,當(dāng)水庫(kù)滿(mǎn)了,如果它和流體靜力學(xué)的水的壓強(qiáng)合起來(lái),這個(gè)力就會(huì)產(chǎn)生最糟糕的結(jié)果,因此朝順流的方向運(yùn)動(dòng)(也就是當(dāng)朝向水庫(kù)的逆流方向的地震加速度產(chǎn)生時(shí))。當(dāng)水庫(kù)是空的,如果這個(gè)力被認(rèn)為是朝逆流的方
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶(hù)所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 眾賞文庫(kù)僅提供信息存儲(chǔ)空間,僅對(duì)用戶(hù)上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶(hù)上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶(hù)因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 重力壩畢業(yè)設(shè)計(jì)--st混凝土重力壩設(shè)計(jì)
- tl混凝土重力壩設(shè)計(jì)
- tl混凝土重力壩設(shè)計(jì)
- 畢業(yè)設(shè)計(jì) 混凝土重力壩設(shè)計(jì)
- 混凝土重力壩設(shè)計(jì) 畢業(yè)設(shè)計(jì)
- 地震載荷下的混凝土重力壩斷裂原因分析-畢業(yè)設(shè)計(jì)外文翻譯
- 水工畢業(yè)設(shè)計(jì)---混凝土重力壩設(shè)計(jì)計(jì)算書(shū)(含外文翻譯)
- 混凝土重力壩抗震優(yōu)化設(shè)計(jì).pdf
- 試論混凝土重力壩施工導(dǎo)流設(shè)計(jì)
- 混凝土重力壩電算課程設(shè)計(jì)
- 淺析堆石混凝土重力壩設(shè)計(jì)
- 某混凝土重力壩施工導(dǎo)流設(shè)計(jì)
- 重力壩畢業(yè)設(shè)計(jì)--水電站混凝土重力壩工程設(shè)計(jì)
- 重力壩畢業(yè)設(shè)計(jì)--水電站混凝土重力壩工程設(shè)計(jì)
- 混凝土重力壩監(jiān)測(cè)資料分析與評(píng)價(jià).pdf
- 碾壓混凝土重力壩靜動(dòng)力分析.pdf
- 碾壓混凝土重力壩溫度應(yīng)力分析.pdf
- 混凝土重力壩畢業(yè)設(shè)計(jì)計(jì)算書(shū)
- 混凝土重力壩施工組織設(shè)計(jì)
- 混凝土重力壩畢業(yè)設(shè)計(jì)計(jì)算書(shū)
評(píng)論
0/150
提交評(píng)論