1、 中文 中文 5351 字出處: 出處:Environmental Earth Sciences, 2011, 62(2): 357-365外文原文Surface settlement predictions for Istanbul Metro tunnels excavated by EPB-TBMS. G. Ercelebi ? H. Copur ? I. OcakAbstract In this study, short-t
2、erm surface settlements are predicted for twin tunnels, which are to be excavated in the chainage of 0 ? 850 to 0 ? 900 m between the Esenler and Kirazl? stations of the Istanbul Metro line, which is 4 km in length. The
3、total length of the excavation line is 21.2 km between Esenler and Basaksehir. Tunnels are excavated by employing two earth pressure balance (EPB) tunnel boring machines (TBMs) that have twin tubes of 6.5 m diameter and
4、 with 14 m distance from center to center. The TBM in the right tube follows about 100 m behind the other tube. Segmental lining of 1.4 m length is currently employed as the final support. Settlement predictions are perf
5、ormed with finite element method by using Plaxis finite element program. Excavation, ground support and face support steps in FEM analyses are simulated as applied in the field. Predictions are performed for a typical g
6、eological zone, which is considered as critical in terms of surface settlement. Geology in the study area is composed of fill, very stiff clay, dense sand, very dense sand and hard clay, respectively, starting from the s
7、urface. In addition to finite element modeling, the surface settlements are also predicted by using semi- theoretical (semi-empirical) and analytical methods. The results indicate that the FE model predicts well the shor
8、t-term surface settlements for a given volume loss value. The results of semi-theoretical and analytical methods are found to be in good agreement with the FE model. The results of predictions are compared and verified
9、 by field measurements. It is suggested that grouting of the excavation void should be performed as fast as possible after excavation of a section as a precaution against surface settlements during excavation. Face pres
10、sure of the TBMs should be closely monitored and adjusted for different zones.Keywords Surface settlement prediction _ Finite element method _ Analytical method _ Semi-theoretical method _ EPB-TBM tunneling _Istanbul M
11、etroIntroduction Increasing demand on infrastructures increases attention to shallow soft ground tunneling methods in urbanized areas. Many surface and sub-surface structures make underground construction works very de
12、licate due to the influence of ground conditions, the long-term settlements may be considered as very limited. There are mainly three settlement prediction approaches for mechanized tunnel excavations: (1) numerical ana
13、lysis such as finite element method, (2) analytical method and (3) semi-theoretical (semi-empirical) method. Among them, the numerical approaches are the most reliable ones. However, the results of all methods should be
14、 used carefully by an experienced field engineer in designing the stage of an excavation project.In this study, all three prediction methods are employed for a critical zone to predict the short-term maximum surface set
15、tlements above the twin tunnels of the chainage between 0 ? 850 and 0 ? 900 m between Esenler and Kirazl? stations of Istanbul Metro line, which is 4 km in length. Plaxis finite element modeling program is used for nume
16、rical modeling; the method suggested by Loganathan and Poulos (1998) is used for the analytical solution. A few different semi-theoretical models are also used for predictions. The results are compared and validated by f
17、ield measurements.Description of the project, site and construction methodThe first construction phase of Istanbul Metro line was started in 1992 and opened to public in 2000. This line is being extended gradually, as we
18、ll as new lines are being constructed in other locations. One of these metro lines is the twin line between Esenler and Basaksehir, which is 21.2 km. The excavation of this section has been started in May 2006. Currently
19、, around 1,400 m of excavation has already been completed. The region is highly populated including several story buildings, industrial zones and heavy traffic. Alignment and stations of the metro line between Esenler
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 眾賞文庫僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 土木工程 建筑外文翻譯 --基于盾構(gòu)法的istanbul地鐵施工引起的地面沉降預(yù)測
- 土木工程 建筑外文翻譯 --基于盾構(gòu)法的istanbul地鐵施工引起的地面沉降預(yù)測
- 土木工程 建筑外文翻譯 --基于盾構(gòu)法的Istanbul地鐵施工引起的地面沉降預(yù)測.doc
- 土木工程 建筑外文翻譯 --基于盾構(gòu)法的Istanbul地鐵施工引起的地面沉降預(yù)測.doc
- 土木工程 建筑外文翻譯 --基于盾構(gòu)法的istanbul地鐵施工引起的地面沉降預(yù)測(英文)
- 基于盾構(gòu)法的istanbul地鐵施工引起的地面沉降預(yù)測
- 盾構(gòu)法隧道施工引起的地面沉降的原因與對策
- 盾構(gòu)法隧道施工引起的地面沉降控制措施.pdf
- 城市地鐵隧道施工引起的地面沉降
- 基于長沙地鐵開挖引起的地面沉降預(yù)測分析.pdf
- 盾構(gòu)施工引起的地面沉降及周邊建筑物保護(hù).pdf
- 蘇州地鐵4號線盾構(gòu)施工引起地面沉降變形研究.pdf
- 盾構(gòu)施工引起的地面沉降變化的規(guī)律研究.pdf
- 土木工程建筑外文翻譯外文文獻(xiàn)英文文獻(xiàn)地鐵地表沉降
- 地鐵盾構(gòu)施工地面沉降風(fēng)險分析.pdf
- 地鐵隧道盾構(gòu)法施工中的地面沉降問題研究
- 城市隧道地鐵工程引起的地面沉降研究
- 土木工程外文翻譯--軟土地基上分期施工的路堤沉降預(yù)測方法
- 地鐵盾構(gòu)法施工地面沉降監(jiān)測與控制.pdf
- 土木工程外文翻譯--土木工程簡介
評論
0/150
提交評論