1、林泳昇,十一月第二週週報(bào)RM Area Function Description,HSB Top Header Height “Adjust”,調(diào)整方式:1、判斷來(lái)胚厚度是否與先前的相同若相同則位置不變,不同則執(zhí)行以下操作。2、來(lái)胚厚度(mm) 230 < t ≤ 250:Highest Position 220 < t ≤ 230:Middle Position t

2、< 220 :Lowest Position,為增加除銹能力,HSB Top Header可進(jìn)行高度調(diào)整。,HSB Table Reverse,粗軋通常有五至七個(gè)道次,而當(dāng)Table Reverse的時(shí)候會(huì)傷及Flapper Plate,因此須將Flapper Plate旋起,以防止傷害。,動(dòng)作流程:1、當(dāng)Reverse的時(shí)候噴頭要先停止除銹。2、Flapper Plat旋起。3、RM approach

3、 Table、HSB Table “Reverse”4、RM approach Table、HSB Table停止“Reverse”5、Flapper Plate旋回初始位置,RM Entry Side Guide“Opening”,RM Entry Side Guide “Opening” 作動(dòng)流程示意圖,RM Entry Side Guide“Opening”,W :板胚厚度或壓延寬度W1 :預(yù)設(shè)值100mmW2 :預(yù)設(shè)

4、值40mmW3 :預(yù)設(shè)值150mm,VE“Zeroing”,操作流程:1、Opening調(diào)整裝置量測(cè)其Gap W02、操作員實(shí)際測(cè)量其Gap W03、重新輸入Gap W0的值,操作前準(zhǔn)備:1、確認(rèn)操作場(chǎng)合安全2、確認(rèn)液壓系統(tǒng)是否正常 (not alarm condition active)3、確認(rèn)主馬達(dá)是否停止(完全不轉(zhuǎn)動(dòng))4、確認(rèn)APC cylinder的APC控制是否正常5、確認(rèn)VE “Pull B

5、ack”6、確認(rèn)有裝上Edger Roll,VE“Roll Change”,操作流程:1、確保操作安全,確認(rèn)所有Main Drive都已停下。2、Cylinder “Pull Back” → Spindle Lift “舉起”3、先更換Drive Side Edger Roll (Edger Roll Change)4、再更換Work Side Edger Roll (Edger Roll Change)5、Cylinde

6、r “Pull back” → Spindle Lift “放下”,Edger Roll Change1、Cylinder “Pull Back” & AWC Cylinder “Full Collapsed” 2、欲拆裝的Pull Back Cylinder “Forward” 3、兩邊的Pull Back Cylinder “Stop”,VE Entry Descaling,VE Entry Descale 高度會(huì)自動(dòng)

7、調(diào)整,理想高度為噴頭距離板坯160mm。在不使用噴頭的情況下噴頭會(huì)升至最高處以避免板胚對(duì)其造成損害。依板胚來(lái)料不同,選擇需要在第幾道次除銹。,動(dòng)作流程:1、選擇是否除銹2、除銹時(shí)自動(dòng)調(diào)整高度,否則則在最高處待命,Roll Gap,Roll Gap = Roll Opening + Pass Line(Gap = ?Op + ?PL),Roll Opening 由 Electrical screw down 控制Pass Li

8、ne 由 Hydraulic Push-up 控制,,Roll Gap,Pass Line,Chock Clamp、WR&BUR Balance Cylinder,,,,,,,,,,,,,,,,,,Chock Clamp,WR&BUR Balance Cylinder,Chock Clamp是為了夾緊軋輥,防止其軸向的滑動(dòng)。由Cylinder作動(dòng),當(dāng)換輥時(shí)可收縮以方便換輥。,WR&BUR

9、Balance Cylinder是為了保持軋輥的平衡,維持Gap的形狀。而在換輥的時(shí)候他也起到抬升軋輥的作用。,Stripper,,,,,,,,,,,,,Stripper可以防止鋼坯在軋延中沿工輥跑進(jìn)機(jī)臺(tái)內(nèi)。也可防止冷卻水滴入鋼坯,造成鋼坯溫降的不確定因素。Top Stripper靠Cylinder Force依附在輥上;Bottom Stripper靠自身重量依附在輥上。,,RM “Work Roll Change”,Prepar

10、ation 換輥前的前置準(zhǔn)備,確保操作安全。Step1 更換舊工輥的前置準(zhǔn)備Step2 移動(dòng)馱車(Baggy)Step3 卸下工輥,將工輥放置在平移臺(tái)(Side Shifting Table)Step4 移動(dòng)平移臺(tái)從Downstream Side換至Upstream SideStep5 將downstream side的新工輥置入軋機(jī)內(nèi)Step6 調(diào)整Pass lineStep7 軋延前的機(jī)械設(shè)定,重新軋延的前置準(zhǔn)備,Wo

11、rk Roll Change“Preparation”,1、注意自身工作安全2、確認(rèn)主馬達(dá)定位心軸、冷卻系統(tǒng)停止、駝車已就準(zhǔn)備位置3、WR balance 開(kāi)啟並升至最上方(Top On)4、Push-up Cylinder移置換輥位置(S = 3mm APC)5、Bottom Spindle Balance “ OFF ”,Work Roll Change _ Step 1Preparation for Pulling O

12、ut Old WR,,,,,,,,,1、需先將Top Stripper 移開(kāi)(Out)2、再將Bottom Stripper 移開(kāi)(Out)3、打開(kāi)Screw Down system的氣煞(Air Brake)4、將Screw Down system移至換輥位置(Roll Changing Position)5、 將BUR Balance提升至換輥位置 (Roll Changing & Up),Work Roll C

13、hange _ Step 2WR Baggy Forward Limit,Baggy CarBackward Limit Position,Baggy CarForward Limit Position,Side Shifting Table,1、打開(kāi)馱車(Baggy)的車閂(Latch)2、將馱車移至Forward Limit Position,,Latch,Work Roll Change _ Step 3Pull Out

14、 Pair of Old Work Rolls On The Side Shifting Table,1、將馱車(Baggy)的車閂(Latch)拴上2、確認(rèn)WR Chock Clamp “Unclamp”3、將馱車?yán)刂罻aiting Position4、WR Chock Clamp “Clamp” & Spindle Stopper “IN”5、WR Balance “All Cylinder Pull Back&q

15、uot; 6、Top Spindle Balance “OFF”7、Top Coupling Support "Up“ & WR Chock Clamp "Unclamp“8、馱車移至Side Shift Table9、閂Open10、將馱車移開(kāi)Side Shift Table (使Table能轉(zhuǎn)動(dòng)),Work Roll Change _ Step 4Shift the Table

16、from Downstream Side to Upstream Side,,1、Side Shift “Downstream” → “"Upstream”,Work Roll Change _ Step 5New WR Pairs Pushed into Mill,1、馱車向前並拴上閂2、馱車向前至換輥位置3、WR Chock Clamp “Clamp” 、Top & Bot. Spindle Balance

17、“ON”4、WR Balance “Top On” & Top Coupling Support "Down“5、WR Chock Clamp “Unclamp” 、Spindle Stopper “Out”6、馱車將通工輥推入軋機(jī)內(nèi)7、將WR Chock Clamp固定(Clamp)8、鬆開(kāi)車閂並退後至如圖的位置,,,Automatic operation after WR changing is c

18、omplete :1、馱車退至最後2、平移臺(tái)移至Downstream3、天車舊輥換新輥,Work Roll Change _ Step 6Pass Line Adjust,1、調(diào)整Pass Line並使WR Balance “Balance”2、BUR Balance “Balance”3、關(guān)閉Screw Down System 的氣煞,Work Roll Change _ Step 7Preparation for Re

19、-starting Rolling,1、將Bottom Stripper闔上2、將Top Stripper闔上工輥換輥結(jié)束,可以重新開(kāi)始軋延,RM “Back Up Roll Change”,Preparation 背輥更換前須先將工輥拉出至Side Shift Table (背輥更換時(shí)需要工輥的空間放置Stool)Step1、移動(dòng)Side Shift Table的軌道,以空出空

20、間使背輥能更換。Step2、將下背輥拉出,放上Stool之後推入軋機(jī)之內(nèi)。Step3、卸下上背輥(Top BUR Clamp “Unclamp”)Step4、同時(shí)拉出上下背輥Step5、更換上背輥Step6、拿掉Stool並更換下背輥,Back Up Roll Change _ Step 1Open the Space of the front of Mill for BUR Change,1、先將安全插銷移除(才能轉(zhuǎn)動(dòng)),

21、2、移動(dòng)軌道,完成後將插銷裝上。 移動(dòng)軌道才能置換背輥。,3、拆卸軋機(jī)前方保護(hù)蓋,工輥換輥軌道,換輥油壓缸,Back Up Roll Change _ Step 2Pull out Bot BUR, Mount a Stool on it, Insert in the Mill,1、換輥油壓缸移至換輥位置,卸下油壓並卸下下背輥。(Bot. BUR Clamp “Unclamp”),然後將背輥拉至最外面(Backward

22、 limit),2、用天車將Stool放置在下背輥上,3、將下背輥與Stool推入軋機(jī)內(nèi),Back Up Roll Change _ Step FinalBack Up Roll Changing,4、同時(shí)拉出上下背滾,5、用天車將新的上背輥與舊的上背輥更換,6、將新上背輥推入軋機(jī)內(nèi)並裝上 (Top BUR Clamp “Clamp”)(BUR Balance “Roll Changing & Up”),7、換輥油

23、壓缸拉至最外邊,吊走Stool並更換下背輥8、將新下背輥推入軋機(jī)內(nèi)並裝上 (Bot. BUR Clamp “Clamp”),Roughing MillPass Line Adjust,在軋延的時(shí)候版坯厚度會(huì)減小,而Pass Line也會(huì)隨之改變。Actual Pass Line與Table Pass Line的高度差會(huì)造成板坯頭尾的翹曲。,H和h的值會(huì)因?yàn)檐堁拥酱胃鷣?lái)坯材料不同而有所改變,因此?X值也會(huì)隨之不同, ?X

溫馨提示

  • 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 眾賞文庫(kù)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

評(píng)論

0/150

提交評(píng)論