1、<p><b> 水閘設(shè)計(jì)原始資料</b></p><p><b> 一、設(shè)計(jì)概況</b></p><p> 東風(fēng)水閘位于我國北方A河右岸河畔上的一座中型節(jié)制水閘,其功用為攔蓄部分洪水,以補(bǔ)充地下水及解決農(nóng)業(yè)灌溉用水。</p><p><b> 二、工程簡況</b></p>
2、;<p><b> 1、閘址位置:</b></p><p> A河為一古老河道,彎彎曲曲,河道呈S彎狀,選S彎的兩個(gè)凸岸做為閘址較為適當(dāng),優(yōu)點(diǎn)是地域開闊,工程布置在自然土基上,施工導(dǎo)流與主體工程施工無干擾,閘址基本在河道中心線上。其缺陷為上、下游連接段較長,工程量較大。水閘縱橫軸線見地形圖。</p><p><b> 2、工程規(guī)模:<
3、;/b></p><p> 該水利工程按5年一遇洪水設(shè)計(jì),20年一遇洪水校核,引渠邊坡m=2 , 縱坡i=1/4000,渠底高程46.8米,設(shè)計(jì)流量Q設(shè) =129.4立米/秒。校核流量Q校 =237立米/秒,最高設(shè)計(jì)蓄水位51.6米,一次蓄水量50萬立方米,灌溉農(nóng)田面積3.5萬畝。</p><p> 3、建筑等級和設(shè)計(jì)地震烈度</p><p> 水閘按
4、三級建筑物設(shè)計(jì),該地區(qū)設(shè)計(jì)地震烈度7度。</p><p><b> 三、地形情況</b></p><p> 閘區(qū)西部位于丘陵地區(qū),西高東低,地面坡度為1/400~1/1000,東部為沖積平原,地勢較平坦,地面坡度為1/2500~1/4000,具體見地形圖。</p><p><b> 四、工程地質(zhì)情況</b></
5、p><p> 在閘址范圍內(nèi)鉆孔5個(gè),孔深20米,總進(jìn)尺100.9米,取原狀樣5個(gè),散狀樣24個(gè),標(biāo)準(zhǔn)貫入試驗(yàn)56個(gè),作以上土樣的物理力學(xué)試驗(yàn)及擊實(shí)試驗(yàn)各一組。試驗(yàn)表明:閘基處土層為河湖相沉積物,N63.5=11,地質(zhì)自上而下劃分為五個(gè)工程地質(zhì)單元,詳見地址剖面圖。</p><p> 第Ⅰ單元,表層為耕植壤土,厚1.0米,可塑。其下為壤土、粘土及砂壤土,總厚3.5~4.8米,底板高程在46.
6、9~47.3米之間。</p><p> 第Ⅱ單元,自上而下為淤泥質(zhì)壤土,砂壤土,裂隙粘土,總厚度3.4~4.0米,底板高程在43.06~43.08米,分布連續(xù)穩(wěn)定。</p><p> 第Ⅲ單元,巖性主要為淤泥質(zhì)壤土,總厚2.5~4.2米,底板高程在39.3~40.3米,土質(zhì)均勻,可塑。有自然孔洞,中高壓縮性,頂部有零星分布的砂壤土,底部局部分布有粘土。</p><p
7、> 第Ⅳ單元,巖性主要為砂壤土,夾薄層壤土,還有零星分布的細(xì)砂層,總厚度3.8~4.8米,底板高程35.6~36.8米。</p><p> 第Ⅴ單元,巖性主要為裂隙粘土和裂隙壤土,頂高程35.6~36.8米,分布穩(wěn)定,局部夾薄層粉砂。</p><p> 閘底板高程與河床齊平在46.8米處,相當(dāng)于第Ⅱ工程地質(zhì)單元頂部,持力層影響范圍內(nèi)的第Ⅱ、Ⅲ、Ⅳ、Ⅴ單元土的壓縮性不均,一般土層
8、為中偏低壓縮性,建筑物主要持力層地基土為軟塑的淤泥質(zhì)壤土及連續(xù)分布的裂隙土。</p><p> 勘探范圍內(nèi),地下水初見水位埋深3.5~4.3米,有微弱承壓性,施工時(shí)注意預(yù)降地下水位,防止Ⅱ、Ⅲ單元土層破壞。</p><p><b> 五、水文氣象</b></p><p> 由水文分析,東風(fēng)閘以上流域面積877.7㎞2,其中山區(qū)471.3㎞
9、2,平原406.4㎞2,年輕流量95%年份有317萬立方米,扣除60%沿途水量損失及0.7的不均勻系數(shù),還有88.8萬立方米,畢業(yè)論文代寫平臺 《580畢業(yè)設(shè)計(jì)網(wǎng)》 是專業(yè)代做團(tuán)隊(duì) 也有大量畢業(yè)設(shè)計(jì)成品提供參考 www.bysj580.com QQ3449649974</p><p> 滿足本閘一年一次蓄水量,保證灌溉效益。</p><p> 該區(qū)平均氣溫12度,年平均降雨量5
10、71毫米,最大降雨量1510毫米,最小降雨量129.5毫米,70%集中在7、8、9三個(gè)月,多年平均蒸發(fā)量931毫米,該區(qū)風(fēng)速一般在4m/s,最大風(fēng)速13 m/s,吹程150m,無霜期平均220天。</p><p><b> 六、交通情況</b></p><p> 閘本身無專門交通要求,考慮農(nóng)田耕作及水閘自身施工運(yùn)行要求設(shè)人行便橋。</p><p
11、><b> 七、設(shè)計(jì)數(shù)據(jù)</b></p><p> 地基土壤物理力學(xué)性質(zhì)及力學(xué)指標(biāo)</p><p> 流限WT=25.6% 滲透系數(shù)KT=1.1×10-6 m/s,</p><p> 塑限Wp=17.2% 凝聚力(室內(nèi)值)C= T/㎡&
12、lt;/p><p> 塑性系數(shù)Ip=8 內(nèi)摩擦角(室內(nèi)值)ф=16°</p><p> 地基壓縮模量E0=90Kg/㎝2 濕溶重 r濕 = 1.75 T/m3</p><p> 含水量 W=31.3% 飽和溶重 r飽 =1.90 T/m3
13、</p><p> 孔隙比 e=0.73 干溶重 r干 =1.6 T/m3</p><p> 地基承載力 σ=15 T/㎡ 浮容重 r 浮 =1.0 T/ m3 </p><p> 閘底板與地基土摩擦系數(shù) f=0.35 夯實(shí)
14、回填土內(nèi)摩擦角ф=25°</p><p> 上、下游引渠糙率 n=0.025</p><p> 引渠底寬 (上、下游)b=28m</p><p> 引渠邊坡系數(shù) (上、下游)m=2</p><p> 砼容重 r = 2 .4 T/m3</p><p> 鋼筋砼容重 r = 2 .5 T/m3
15、</p><p><b> 東風(fēng)水閘設(shè)計(jì)任務(wù)書</b></p><p> 一、畢業(yè)設(shè)計(jì)的目的和要求</p><p> 畢業(yè)設(shè)計(jì)是專業(yè)教學(xué)工作中的重要環(huán)節(jié)之一,通過設(shè)計(jì)實(shí)踐力求達(dá)到如下目的與要求:</p><p> 1、鞏固、加深、擴(kuò)大所學(xué)的基本理論和專業(yè)知識,并使其進(jìn)一步系統(tǒng)化。</p><p
16、> 2、培養(yǎng)學(xué)生運(yùn)用所學(xué)知識解決實(shí)際工程技術(shù)問題的能力,要求掌握設(shè)計(jì)原則、設(shè)計(jì)方法和步驟。</p><p> 3、培養(yǎng)學(xué)生獨(dú)立思考、獨(dú)立工作的能力。通過畢業(yè)設(shè)計(jì)加強(qiáng)計(jì)算、繪圖、編寫設(shè)計(jì)文件、使用規(guī)范等方面的能力。</p><p><b> 二、畢業(yè)設(shè)計(jì)內(nèi)容</b></p><p><b> 1、水閘樞紐布置</b&
17、gt;</p><p> 包括:水閘總體布置;閘室的結(jié)構(gòu)組成及布置;兩岸連接布置;防滲排水及消能防沖布置。</p><p><b> 2、水力計(jì)算</b></p><p> 包括:閘孔尺寸確定、消能防沖設(shè)計(jì)、防滲排水設(shè)計(jì)。</p><p> 3、閘室設(shè)計(jì)及抗滑穩(wěn)定計(jì)算</p><p>
18、包括:閘室輪廓尺寸及組成結(jié)構(gòu)設(shè)計(jì);閘室地基承載力及抗滑、抗傾穩(wěn)定計(jì)算。</p><p> 4、水閘工作閘門 —— 平面鋼閘門設(shè)計(jì)</p><p> 包括:門葉結(jié)構(gòu)、門槽內(nèi)埋固構(gòu)件設(shè)計(jì)及啟閉機(jī)選型。</p><p> 5、水閘組成結(jié)構(gòu)設(shè)計(jì)</p><p><b> ①、閘墩結(jié)構(gòu)設(shè)計(jì)</b></p>&
19、lt;p> ?、?、閘室底板結(jié)構(gòu)設(shè)計(jì)</p><p><b> ?、邸㈤l門設(shè)計(jì)</b></p><p><b> ?、?、工作橋結(jié)構(gòu)設(shè)計(jì)</b></p><p><b> 三、設(shè)計(jì)成果</b></p><p> 完成設(shè)計(jì)計(jì)算說明書一份,工程設(shè)計(jì)圖紙四張。</p>
20、;<p> 1、設(shè)計(jì)說明書按有關(guān)要求排版裝訂成冊。</p><p><b> 2、設(shè)計(jì)圖紙包括</b></p><p> 、水閘樞紐剖面圖與平面布置圖。 1號圖紙 比例1:200</p><p> 、水閘上、下游立視和主要細(xì)部大樣圖。 1號圖紙 比例1:100</p><p>
21、 、水閘結(jié)構(gòu)設(shè)計(jì)圖。 1號圖紙 比例1:50</p><p><b> 參考書及參考資料</b></p><p><b> 教材: </b></p><p><b> 《水力學(xué)》上、下冊</b></p><p><b>
22、 《水工建筑物》下冊</b></p><p> 《水工鋼筋混凝土結(jié)構(gòu)》</p><p><b> 《水工鋼結(jié)構(gòu)》</b></p><p><b> 參考書:</b></p><p> 《水閘設(shè)計(jì)規(guī)范》 SLZ 65——2001</p><p> 《
23、水閘設(shè)計(jì)》 水利水電出版社</p><p> 《水閘設(shè)計(jì)》 上冊 華東水利學(xué)院編</p><p> 《水閘》 灌區(qū)水工建筑物叢書</p><p> 《水工鋼結(jié)構(gòu)設(shè)計(jì)》 武水</p><p> 《閘門與啟閉機(jī)》 水利電力出版社</p><p> 《水利水電工程鋼閘門
24、設(shè)計(jì)規(guī)范》 SL 74——95</p><p> 《水工設(shè)計(jì)手冊》6泄水與過壩建筑物</p><p> 《水工設(shè)計(jì)手冊》7水電站建筑物——擋土墻</p><p> 《鋼筋混凝土結(jié)構(gòu)計(jì)算與設(shè)計(jì)》 中國水利水電出版社</p><p><b> 摘要</b></p><p> 水閘是灌
25、排工程的主要建筑物之一,它是一種利用閘門進(jìn)行擋水或泄水的低水頭水工建筑物,既可控制流量又可調(diào)節(jié)水位。關(guān)閉閘門時(shí),它可攔洪蓄水,擋潮或抬高閘前水位;開啟閘門時(shí),又可泄洪﹑排澇或?qū)ο掠魏拥阑蚯拦┧?。這次我們主要設(shè)計(jì)修建在平原河道上的節(jié)制閘。</p><p> 節(jié)制閘一般跨越河道修建,用于枯水期蓄水,抬高水位以供進(jìn)水閘取水,洪水期開閘泄洪。在渠系中一般位于支、斗渠分水口稍下游,跨越干、支渠修建,用于抬高干、支渠水位
26、,供支、斗渠取水。</p><p> 本次設(shè)計(jì)主要分為以下六部分:</p><p> 1、分析資料及水閘樞紐布置</p><p> 已提供的資料是設(shè)計(jì)的基本依據(jù),為使設(shè)計(jì)成果安全、適用、經(jīng)濟(jì),首先應(yīng)熟悉并分析各種資料,如地形、地質(zhì)情況,各有關(guān)高程,特征水位及相應(yīng)流量等,然后根據(jù)閘址地形、地質(zhì)、水流等條件以及該樞紐中各建筑物的功能、特點(diǎn)、運(yùn)用要求,確定樞紐布置,
27、做到緊湊合理,協(xié)調(diào)美觀,組成整體效益最大的有機(jī)聯(lián)合體。</p><p><b> 2、水力計(jì)算</b></p><p> 主要包括閘孔設(shè)計(jì)、消能防沖設(shè)計(jì)、防滲排水設(shè)計(jì)。</p><p><b> 閘孔設(shè)計(jì)</b></p><p> 首先根據(jù)上面擬定的水閘型式及設(shè)計(jì)流量,確定閘孔凈寬及適宜孔數(shù)
28、。然后再驗(yàn)算初擬閘孔尺寸的過流量是否滿足泄流要求。</p><p><b> 消能防沖設(shè)計(jì)</b></p><p> 為了消除水流過閘后的能量,設(shè)計(jì)了消力池、海漫和防沖槽。</p><p> 消力池:計(jì)算在設(shè)計(jì)蓄水位下,閘門在各種運(yùn)行工況和不同開啟高度時(shí)的泄流量,確定是否設(shè)消力池。若需設(shè)置則根據(jù)消能條件,計(jì)算消力池深、長、底板厚度及所用建
29、筑材料。</p><p> 海漫:消力池能消除水流50℅的能量,其余能量由海漫消除,根據(jù)水閘不同泄量的水力計(jì)算,布置海漫,確定長度及建筑材料。</p><p> 防沖槽:計(jì)算海漫末端河床沖刷深度,設(shè)計(jì)計(jì)算防沖槽斷面形狀、尺寸、確定拋石量及護(hù)坡砌置深度。</p><p><b> 防滲排水設(shè)計(jì)</b></p><p>
30、; 首先擬定水閘地下輪廓線型式,初步計(jì)算所需長度,然后依次確定閘室底板、鋪蓋長度及材料,設(shè)計(jì)反濾層及排水孔位置,最后計(jì)算閘基滲透壓力,繪制滲透壓力分布圖。</p><p> 3、閘室的布置設(shè)計(jì)及閘室穩(wěn)定性計(jì)算</p><p><b> 閘室輪廓尺寸確定</b></p><p> 由水力條件及水閘功用,確定閘室總寬、閘頂高程、閘墩、閘門、
31、底板的型式與尺寸,閘室上部結(jié)構(gòu)的工作橋、交通橋、啟閉設(shè)備的型式與尺寸。</p><p><b> 閘室穩(wěn)定計(jì)算</b></p><p> 選取計(jì)算單元,計(jì)算作用于閘室的荷載,并按計(jì)算條件進(jìn)行組合。分別按完建期,正常蓄水期,正常蓄水加特殊荷載組合三種工況進(jìn)行閘室抗滑穩(wěn)定性和地基承載力驗(yàn)算,并對地基應(yīng)力分布狀態(tài)及沉降差進(jìn)行計(jì)算分析,判斷水閘地基是否滿足承載力、抗滑穩(wěn)定
32、和變形要求。</p><p> 閘基深層滑動及地基沉降量計(jì)算</p><p> 根據(jù)設(shè)計(jì)資料給出的土壤物理力學(xué)特性指標(biāo),驗(yàn)算在荷載作用下基礎(chǔ)是否發(fā)生帶動一部分地基土向下游深層滑動,并確定是否進(jìn)行地基沉降量計(jì)算。</p><p> 4、兩岸連接建筑物——岸、翼墻的結(jié)構(gòu)型式,布置及穩(wěn)定性計(jì)算</p><p> 由閘室的結(jié)構(gòu)尺寸及地基條件,
33、確定岸、翼墻的平面布置型式,結(jié)構(gòu)型式,斷面尺寸。</p><p> 按完建期和正常蓄水期兩種工況,對岸、翼墻的地基承載力,基底最大最小應(yīng)力比值及基底面抗滑穩(wěn)定進(jìn)行計(jì)算。 </p><p> 上游翼墻的防滲設(shè)施及下游翼墻的排水設(shè)施設(shè)計(jì)。</p><p><b> 5、閘室結(jié)構(gòu)計(jì)算</b></p><p><b&
34、gt; 閘墩應(yīng)力分析</b></p><p> 將閘墩視為固接于底板上的懸臂梁,以閘墩和底板的結(jié)合面作為計(jì)算控制面,分別按運(yùn)用期(閘門關(guān)閉擋水)和檢修期(一孔檢修其它孔過水)兩種工況,計(jì)算中墩墩底水平截面垂直正應(yīng)力、剪應(yīng)力、門槽應(yīng)力、墩底水平截面?zhèn)认驊?yīng)力,并分析計(jì)算結(jié)果,進(jìn)行配筋設(shè)計(jì)。</p><p><b> 底板應(yīng)力分析</b></p>
35、;<p> 以閘門為界,將底板分為上下兩部分,分別在兩部分中央垂直水流方向取單寬板條進(jìn)行分析。按完建期和運(yùn)用期兩種工況,計(jì)算作用于板條上的荷載。包括底板自重,中、邊墩及上部結(jié)構(gòu)重,水重 ,揚(yáng)壓力及不平衡剪力并對其進(jìn)行分配,按彈性地基梁郭氏法查表計(jì)算,求得地基反力及計(jì)算板條各截面的內(nèi)力,分析計(jì)算結(jié)果進(jìn)行底板配筋設(shè)計(jì)。</p><p><b> 6、平面鋼閘門設(shè)計(jì)</b><
36、;/p><p><b> 門葉結(jié)構(gòu)</b></p><p> 門葉結(jié)構(gòu)布置:確定門葉結(jié)構(gòu)所需的各種構(gòu)件,數(shù)目及所在位置,梁格及聯(lián)結(jié)系的型式、連接方式,行走支承及邊梁的型式。</p><p> 面板設(shè)計(jì):在充分發(fā)揮面板強(qiáng)度的前提下,設(shè)計(jì)一經(jīng)濟(jì)合理的面板厚度。并在主梁截面確定之后校核面板的局部彎曲與整體彎曲的折算應(yīng)力強(qiáng)度。</p>
37、<p> 水平次梁、頂、底梁設(shè)計(jì):均采用型鋼。由各構(gòu)件的內(nèi)力,選擇各梁的截面,并進(jìn)行強(qiáng)度、剛度驗(yàn)算。</p><p> 主梁設(shè)計(jì):確定主梁數(shù)目、位置、截面型式,斷面尺寸,截面改變,翼緣焊縫設(shè)計(jì)及主梁局部穩(wěn)定驗(yàn)算。</p><p> 豎直次梁及橫縱向聯(lián)結(jié)系設(shè)計(jì):確定其型式及位置,由內(nèi)力計(jì)算選擇截面尺寸及強(qiáng)度驗(yàn)算。</p><p> 邊梁設(shè)計(jì):由行走支
38、承確定邊梁結(jié)構(gòu)型式,按構(gòu)造要求設(shè)計(jì)邊梁,并對其危險(xiǎn)截面進(jìn)行強(qiáng)度校核。</p><p> 行走支承設(shè)計(jì):確定其結(jié)構(gòu)型式、尺寸,并進(jìn)行強(qiáng)度驗(yàn)算。</p><p> 導(dǎo)向裝置設(shè)計(jì):確定反、側(cè)行走支承型式,位置及連接方式。</p><p> 止水、吊耳設(shè)計(jì):確定止水型號及布置方式,由啟門力設(shè)計(jì),吊軸及吊耳板尺寸并對吊耳板強(qiáng)度進(jìn)行驗(yàn)算。</p><p
39、><b> 門槽埋設(shè)構(gòu)件</b></p><p> 確定門槽各軌道型式,斷面尺寸,對主軌進(jìn)行強(qiáng)度校核。</p><p> 確定止水座及門槽護(hù)角構(gòu)件型式。</p><p><b> 閘門鎖室裝置設(shè)計(jì)。</b></p><p><b> 啟閉機(jī)械選擇</b><
40、/p><p> 計(jì)算啟門力,確定啟閉機(jī)類型、型號。</p><p> 計(jì)算閉門力,校核是否應(yīng)采取工程措施降門。</p><p> 吊具設(shè)計(jì):由啟門力設(shè)計(jì)吊索。</p><p> 關(guān)鍵詞:水閘;閘室;平面閘門;防滲排水;主梁</p><p><b> Abctract </b></p&g
41、t;<p> The sluice is irriated and arranged one of the main buildings among the project,it is a kind of low flood peak water conservancy project builing utilizing the gate to block water or sluice, can control the
42、 adjustable water level of the flow. While closing the gate, it can block the big conservation storage, the tide of the shelf or improving the water level in front of the floodgate, can release floodwater, drain flooded
43、fields or supple water of the downstream river or the channel while opening</p><p> The check gate generally crosses over the river to build, used in dry season conservation storage, redound water level for
44、 sluice fetch water, turn on floodgate release floodwater flood period. In canal is it prop up to lie in generally among the department, lateral canal divide into water mouth low reaches slightly, use for redounding the
45、 water level of branch canal, for propping up, the lateral canal fetch water</p><p> This design is divided into six following parts mainly:</p><p> 1.It is analysed that the materials and slu
46、ice pivot are fixed up.</p><p> The materials that have already been offered are basic bases designed, in order to edable designing the achievement safe, suitable, economy, should be familiar with and analy
47、se various kinds of materials at first, for instance topographical, geological situation, each about high Cheng, characteristic water level and corresponding flow, ect, then according to floodgate location, topography, g
48、eology, rivers, etc, terms and every building of function, characteristic, use demanding to confirm the pi</p><p> 2.Water conservancy is calculated:</p><p> Including floodgate hole design, i
49、s it can is it wash the design, prevention of seepage drain off water and design to defend to disappear mainly.</p><p> ?、臫he hole is designed in the floodgate give design flow definitely confirm according t
50、o sluice form and materials that draft above floodgate hole clear width and suitable floodgate hole count at first, then checking computations plan floodgate hole size pass flow satisfied with the requirement of releasin
51、g floodwater for the first time.</p><p> ⑵Disappear and can defend and print designing for dispel water flow through energy of floodgate,is it disappear strength pool, sea overflow and defend and wash the t
52、rough to design.</p><p> ①Disappear in the strength pool calculate in design water storage level under the terms, gate turn on in various kinds of form, operating mode of operation and hole of floodgate, on
53、e pair of holes is turned on symmetrically, three holes open and different flow of letting out while opening the height at the same time,confirm whether to need to set up and subdueing the strength pool or not. If is it
54、design to need, want according to condition of can disappearing,is it disappear depth, strength of </p><p> ?、赥he sea overflowing disappear strength pool can dispel rivers 50% energy,other energy all over th
55、e place to dispel from sea,according to different letting out amount of the sluice,confirm long degree and construction material of sea.</p><p> ?、?Defend and wash the trough calculate sea overflow end wash
56、hole depth, is it wash trough section form and size to defend to design.</p><p> ?、荰he prevention of seepage drains off water and designs:</p><p> Draft the underground outline line at first, c
57、onfirm the length tentatively, then confirm the floodgate room baseplate, length of the bedding and material sequentially, design and strain layer and drain off water in the hole position instead, calculate the base osmo
58、tic pressure of the floodgate finally, draw the distribution map of the osmotic pressure.</p><p> 3.The floodgate room is decorated and floodgate room stability is calculated:</p><p> ?、臗onfirm
59、 the size of the outline line of floodgate room confirmed the floodgate room is always wide by the water conservancy condition, floodgate high Cheng, floodgate mound, gate, pattern, size and floodgate room top structure
60、job bridge, traffic bridge, open and close pattern and size of the equipment of baseplate very.</p><p> ?、芓he floodgate room is calculated steadily choosing the unit of calculating, build one according to fi
61、nishing, normal conservation storage one, normal conservation storage issue add special to is it make up three opeerating mode checking computations floodgate room resist slippery stability and ground bear the weight of
62、strength checking computations to load, distribute state and subside to ground stress difference carry on computational analysis, judge sluice ground meet strength of bearing the</p><p> ?、荰he deep layer of
63、floodgate room is slipped and the subsiding amount of ground is calculated according to design soil physics characteristic index that materials provide, checking computations foundation is it drive some ground soil slip
64、to the low reaches to happen under loading function, confirm whether to carry on the subsiding amount of the ground to calculate or not.</p><p> 4.Tow sides join building-bank,structure pattern, wing of wal
65、l, assign and the stability is calculated:</p><p> ⑴By physical dimension and ground terms, floodgate of room, confirm bank, level, wing of wall assign the pattern and size of section.</p><p>
66、?、艬uilding an two kinks of operating modes of one and normal conservation storage according to finishing, the ground on other bank, wing wall bears the weight of strength, basis heavy minimum stress ratio count bottom su
67、rface of the base is it calculate to go on steadily to slip to resist most.</p><p> ⑶Facilities of prevention of seepage in the wing wall of the upper reaches and pumping equipment on the downstream wing wa
68、ll are designed.</p><p> 5.The structure of floodgate room is calculated:</p><p> ?、臡ound stress analysis of the floodgate:</p><p> Regard as floodgate firm to connect cantilever
69、beam at baseplate by mound, regard the combination surfaces of the mound of the floodgate and baseplate as and calculate the chain of command, separately according to use issue (gate is it block water to shut off ) and o
70、verhaul issue two kinds of operating modes , mound vertical direct stress of horizontal section, shearing stress, trough stress of the door, mound bottom level sectional side direction stress of mound bottom while calcul
71、ating, analys</p><p> ?、芐tress analysis of the baseplate:</p><p> Make gate as the boundry, divide baseplate into two part from head to foot, fetch single wide lath analyse in two part central
72、vertical rivers direction separately. Accord to finishing and building one and using the operating mode of an improved variety, calculate the load on function and lath. Including the baseplate conducts oneself with digni
73、ty,china, mound and top structure are heavy, raise pressure and uneven to cut strength and is it assign to go to it, France check the watch calculates ac</p><p> 6.The level gate is designed:</p><
74、;p> ?、臠eaf structure of the door.</p><p> ?、賂he layout of the structure of leaf of the door:Confirm door leaf various kinds of component structure need, figure and position , Ge Liang and pattern, way of
75、connecting, connection of department, pattern of walking and supporting and roof beam.</p><p> ②The panel is designed :On the premise of giving full play to the intensity of the panel, design one thickness
76、of panel with rational economy. And check some and crooked intensity of conversion stress with crooked whole of the panel after the girder section is confirmed.</p><p> ③Level roof beam once, carrying, the
77、botttom roof beam is designed: Adopt the section steel.By the internal force of every component, choose the section of every roof beam, carry on intensity, rigidity checking computation.</p><p> ④The girder
78、 is designed: Confirm girder figure, position, sectional form, the size of section, the section changes, wing reason welding seam design and some steady checking computations of girder.</p><p> ?、軻ertical ro
79、of beam once and horizontal vertical connection department design:Confirm its pattern and position , is calculated and chosen sectional size and intensity checking computations by the internal force.</p><p>
80、 ?、轙he roof beam is designed:Is it confirm to support to walk roof beam structure patern is according to construct requirement design roof beam, and carry on the intensity to check to its dangerous section.</p>&l
81、t;p> ?、遅alk and support designing: Confirm its structure pattern, size carry on intensity checking compitation.</p><p> ⑧Lead the device to design: Confirm the inside out, side and walk and support the p
82、attern, the position and way of connecting.</p><p> ⑨Stagnant water, lifting lug are designed:Confirm the type of the stagnant water and assign the way, is opened door strength to design, hang the axle and
83、board measurement of the lifting lug and carry on checking computations to the intensity of the lifting lug board.</p><p> ?、芓he door trough is buried the component underground.</p><p> ①Confir
84、m every track pattern of the door trough, the size of section, carry on the intensity to check to the main rail .</p><p> ②Confirm stagnant water seat and door trough protect the horn component pattern.<
85、/p><p> ?、跮ock the room device to design in the gate.</p><p> ?、荗pen and room device to design in the gate.</p><p> ?、貱alculate and open the strength of the door, comfirm the type of h
86、eadstok gear, type.</p><p> ?、贑alculate and close the strength of the door, should take the project measure to lower the door to check.</p><p> ③The hoist is designed: Opened door strength and
87、designed the sling.</p><p> Key word: Sluice; floodgate room; level gate; prevention of seepage drain </p><p> off water and design to defend to disappear; gird</p><p> 第一章
88、 水閘樞紐布置</p><p><b> 1.1 總體布置</b></p><p> 1.1.1 節(jié)制閘功能</p><p> 東風(fēng)水閘為中型節(jié)制水閘,它是一種利用閘門進(jìn)行擋水或泄水的低水頭建筑物,既可控制流量又可調(diào)節(jié)水位。關(guān)閉閘門時(shí),它可攔洪蓄水,擋潮或抬高閘前水位;開啟閘門時(shí),又可泄洪,排澇或?qū)ο掠魏拥阑蚯拦┧?lt;/p>
89、;<p> 水閘的類型較多,按其任務(wù)不同,可分為以下幾類;</p><p> <1> 進(jìn)水閘:為了農(nóng)田灌溉或其他水利事業(yè)的需要,進(jìn)水閘往往建在河道,水庫或湖泊的岸邊,用于引水灌溉,發(fā)電或其他進(jìn)水需要而控制流量。</p><p> <2>節(jié)制閘:由于農(nóng)田灌溉,發(fā)電引水或改善航運(yùn)要求,常需橫快河道或渠道修建水閘,以控制閘前水位和過閘流量,這類水閘成為
90、節(jié)制閘。河道上的節(jié)制閘也也稱為攔河閘。在洪水時(shí)期,攔河閘還起排泄洪水作用。</p><p> <3>擋潮閘:濱海地區(qū)的河流都受潮水影響,為了防止海水倒灌而抬高內(nèi)河水位,常在入海處河口附近修建水閘,即為擋潮閘。漲潮時(shí)關(guān)閘,防止海水倒灌;當(dāng)內(nèi)河水位過高落潮期間開閘排水。擋潮閘的特點(diǎn),是承受雙渣向水頭,而且閘門啟閉頻繁。</p><p> <4>排水閘:為使低洼地區(qū)大
91、的漬水通過排水渠排入江河或湖泊,常需在排水渠末端設(shè)置水閘,這當(dāng)河道類水閘稱為排水閘。排水閘除開閘排水外,在枯水季還可向內(nèi)引水灌溉;洪水時(shí)可關(guān)閘擋水,防止外水倒灌,也可蓄水灌溉。特點(diǎn)是:是承受雙向水頭。</p><p> <5>分洪閘:當(dāng)河道遭遇洪水而對下游可能造成洪災(zāi)時(shí),可將部分洪水泄入湖泊或洼地 以消減洪峰。在分洪道首部需設(shè)置水閘,即為分洪閘。分洪閘常建于河道的一側(cè),用來將超過下游河道安全泄量的
92、洪水泄入分洪區(qū)或分洪道。</p><p> <6>沖沙閘(排沙閘):沖沙閘(排沙閘)建在多泥沙的河流上。用于排除進(jìn)水閘,節(jié)制閘或渠系中沉積的泥沙。此外,還有為排除冰塊,漂浮物等而設(shè)置的排冰閘,排污閘等。</p><p> 1.1.2 布置要點(diǎn)</p><p> 水閘位置時(shí)應(yīng)考慮的幾個(gè)因素</p><p> ?、诺鼗鶙l件 是
93、影響水閘總體布置的主要因素之一應(yīng)盡可能選擇土質(zhì)密實(shí),均勻。壓縮性較小和承載能力較大的良好地基。此外,由于閘基土質(zhì)的抗沖能力直接影響單寬 流量的選擇和閘后消能防沖設(shè)備的設(shè)計(jì),而地下水位的高低及承壓水的有無對地基的穩(wěn)定性和施工期的排水措施也有所影響,故在選擇閘址時(shí)應(yīng)考慮這些條件。</p><p> ?、扑鳁l件 是另一主要因素閘的位置應(yīng)使進(jìn)閘和出閘水流平順,防止上下游產(chǎn)生有害的沖刷和淤積。</p>
94、<p> ?、鞘┕ぁ⒐芾?xiàng)l件 也是閘址選擇時(shí)要考慮的一個(gè)因素要求有足夠?qū)拸V的施工場地,并且盡可能使土方工程量最小。當(dāng)水閘是整個(gè)樞紐的一個(gè)組成部分時(shí),應(yīng)就樞紐工程總體布置做方案比較,得出水閘最優(yōu)位置,以達(dá)到技術(shù)上先進(jìn)與經(jīng)濟(jì)上合理的要求。A河為一古老河道,彎彎曲曲成S形狀,選S彎的兩個(gè)凸岸作為閘址較為適當(dāng),優(yōu)點(diǎn)是地域開闊,工程布置在自然土基上,施工導(dǎo)流與主體工程施工無干擾,閘址基本在河道中心線上,其缺陷為上下游連接段較長,工程量
95、較大。</p><p><b> 1.2 結(jié)構(gòu)布置</b></p><p> 1.2.1閘室結(jié)構(gòu)組成,作用及布置</p><p> 水閘一般由上游連接段,閘室,下游連接段三部分組成。水閘的主體是閘室,其結(jié)構(gòu)型式是多種多樣的,主要取決于泄放水流的方式以及閘門的構(gòu)造和操作方式。按照閘室的泄流特點(diǎn)分類,可以分為以下幾種型式:</p>
96、<p><b> 1.堰流式閘室</b></p><p> 當(dāng)閘門全開時(shí)過閘水流具有自由水面的水閘成為溢流式閘室,也稱開敞式閘室。一般堰檻高程較高,擋水高度較小的水閘都采用這種型式,依靠閘門擋水。當(dāng)閘門全部打開時(shí),水閘的過水面積和泄流量都隨水位的抬高而增大,對于需要泄放洪水的攔河閘和分洪閘來說,這是一個(gè)很大的優(yōu)點(diǎn)。</p><p><b>
97、 2.孔流式閘室</b></p><p> 當(dāng)閘門全開時(shí),自由水面仍受阻擋,水流只能通過固定洞孔泄入下游,稱為孔流式閘室,也成為封閉式閘室。當(dāng)閘檻高程較低,閘室高度較大,需要泄放或取用底層水流時(shí),常采用這種型式。一般把閘室頂部封閉。例如設(shè)置胸墻擋水,底部設(shè)置孔口泄水,這樣可以減少閘門尺寸。這種泄流方式最適合于沖沙閘的工作條件,有其突出的優(yōu)點(diǎn)。</p><p><b&g
98、t; 3.混合泄流式閘室</b></p><p> 這是一種既具有面流溢流能力,又具有底孔泄流能力的閘室結(jié)構(gòu)。構(gòu)造上分為上下兩層,分別裝設(shè)閘門。開啟上層閘門,利用面層溢流泄放洪水和漂流物。開啟下層閘門,則利用底孔沖刷閘前淤泥的泥沙。這種類型的閘室多用于攔河節(jié)制閘或引水系統(tǒng)的進(jìn)水閘上。有時(shí)在特別軟弱的淤泥質(zhì)地基上建閘,為了加強(qiáng)閘室的橫向剛度,借以減小地基的不均勻沉降和閘室的結(jié)構(gòu)變形,在閘室的過水?dāng)嗝?/p>
99、中設(shè)一層水平橫隔板,型式上亦構(gòu)成了上下兩層泄水通道,但常常共用一個(gè)閘門,在運(yùn)用要求上與混合泄流式閘室不盡相同。</p><p> 本水閘設(shè)計(jì)閘門全開時(shí)具有自由水面,擋水高度較小,且依靠閘門擋水,故可采用開敞式閘室。根據(jù)已知資料,初步采用開敞式閘室。</p><p> 1.2.1.1 底板 是整個(gè)閘室結(jié)構(gòu)的基礎(chǔ),承受水閘上部結(jié)構(gòu)的重量及荷載并向地基傳遞的結(jié)構(gòu),同時(shí)兼有防滲及防沖作用,防
100、止地基由于受滲透水流作用可能產(chǎn)生的滲透變形并保護(hù)地基免受水流沖刷。本設(shè)計(jì)初步采用平底板。</p><p> 1.2.1.2 閘墩 是閘門和各種上部結(jié)構(gòu)的支撐體,由閘門傳來的水壓力和上部結(jié)構(gòu)的重量和荷載通過閘墩傳布于底板。閘墩通常采用實(shí)體式,其外形輪廓設(shè)計(jì)應(yīng)能滿足過閘水流平順,側(cè)向收縮小,過流能力大的要求。本設(shè)計(jì)初步采用上游墩頭半圓形,下游墩頭流線形的型式。</p><p> 1.2.
101、1.3閘門 其結(jié)構(gòu)的選型布置應(yīng)根據(jù)其受力情況控制運(yùn)用要求、制作、運(yùn)輸、安裝維修條件等,結(jié)合閘室結(jié)構(gòu)布置合理選定。本設(shè)計(jì)初步采用平面鋼閘門。</p><p> 1.2.1.4啟閉機(jī) 其型式可根據(jù)門型尺寸及其運(yùn)用條件等因素選定。本設(shè)計(jì)初步采用卷揚(yáng)式平面閘門啟閉機(jī)。</p><p> 1.2.1.5閘室上部結(jié)構(gòu) 工作橋,交通橋布置。</p><p> 1.2.
102、2兩岸連接布置</p><p> 1.2.2.1 閘室與兩岸連接</p><p> 閘室與兩岸連接形式主要取決于地基情況和閘身高度:</p><p> (1)當(dāng)?shù)鼗^好,閘身高度不大時(shí),可用邊墩直接擋土,結(jié)構(gòu)簡單,工程量小。</p><p> ?。?)當(dāng)閘身較高,地基較軟弱時(shí),若仍采用邊墩直接擋土,宜在邊墩后另設(shè)輕型岸墻擋土。<
103、/p><p> (3)當(dāng)?shù)鼗休d力過低時(shí),還可采用護(hù)坡無岸墻的連接形式,即邊墩不擋土,也不設(shè)岸墻擋土,而是自邊墩及上下游翼墻背面底部做斜坡與堤頂連接。</p><p> 1.2.2.2 閘室與上下游連接</p><p> 連接長度:閘室一般采用翼墻與上下游河道連接,上游翼墻一般與鋪蓋同長或稍長,也可取不小于3~5倍水閘上下游最大水位差。下游翼墻一般至消力池末端或稍
104、長,墻端伸入岸坡內(nèi)0.3~0.5m,墻頂應(yīng)高出最高運(yùn)用水位至少0.5~1.0m。</p><p><b> 平面布置形式</b></p><p> (1)八字形翼墻和圓弧形反翼墻:自邊墩兩端開始以擴(kuò)散形式向上下游分別延伸至鋪蓋始端或消力池末端后,轉(zhuǎn)彎以垂直于水流方向插入岸坡內(nèi),轉(zhuǎn)角可為折形線,圓弧轉(zhuǎn)角半徑常采用2~5m,為改善水流條件,上游翼墻收縮不宜大于12
105、186;~18º,下游翼墻擴(kuò)散角不宜大于7º~12º,這種形式水流條件和防滲效果較好,但工程量大,一般適用于大中型水閘。</p><p> (2)圓弧式翼墻:自邊墩兩端開始,用圓弧形直立翼墻與上下游河岸連接,上游圓弧半徑經(jīng)常用15~20m,下游圓弧半徑30~40m,其水流條件好,但施工復(fù)雜,適用于單寬流量較大,閘身高,地基承載力較低的大中型水閘。</p><p&
106、gt; ?。?)扭曲面翼墻:翼墻由邊墩處的直立面,隨著向上下游延伸逐漸變?yōu)榕c河岸坡度相同的斜坡面,水流條件好,且工程量小,但施工中應(yīng)確保后墻回填土夯實(shí)質(zhì)量,以避免墻身斷裂,多采用漿砌石結(jié)構(gòu),適宜建在堅(jiān)硬的黏土地基上。</p><p> ?。?)一字翼墻和斜降翼墻:翼墻自邊墩端部開始沿水流向直接插入岸坡,斜降翼墻在平面上呈八字狀,但隨著向上下游延伸逐漸降低墻頂工程,至末端墻頂與河底齊平,翼墻不伸入岸坡內(nèi)。</
107、p><p> 1.2.2.3 岸翼墻結(jié)構(gòu)形式</p><p> ?。?)重力式:重力式岸翼墻主要靠自重維持擋土后的穩(wěn)定性,多由漿砌石或混凝土建造,因地基應(yīng)力較大,一般用于墻高不超過5~6m的情況,墻基礎(chǔ)寬度為0.6~0.7倍墻高,當(dāng)采用漿砌石結(jié)構(gòu)時(shí),墻頂與底板多用混凝土澆筑,底板厚0.5~0.8m,兩端懸出部分長0.3~0.5m,迎水面常為直立面,擋土側(cè)自墻頂向下做成約0.8m的鉛直段,以下
108、以1:0.25~1:0.5斜坡連至底板。</p><p> (2)懸臂式:懸臂式岸翼墻一般為鋼筋混凝土結(jié)構(gòu),由直墻和底板組成,適宜墻高為6~9m,具有厚度小,自重輕,結(jié)構(gòu)簡單等優(yōu)點(diǎn)。</p><p> (3)扶壁式:當(dāng)墻高度大于9m時(shí),為增加懸臂式擋土墻立墻與底板的剛度,或?yàn)闇p小墻厚,可在立墻與底板之間設(shè)置與之固結(jié)的鋼筋混凝土扶臂即成為扶壁式結(jié)構(gòu),扶臂厚為0.3~0.4m,間距一般為3
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 眾賞文庫僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 節(jié)制閘施工方案
- 節(jié)制閘課程設(shè)計(jì)、
- 泗源溝節(jié)制閘設(shè)計(jì)
- 新建節(jié)制閘施工方案
- 節(jié)制閘設(shè)計(jì)畢業(yè)設(shè)計(jì)
- 泗源溝節(jié)制閘設(shè)計(jì)
- 泗源溝節(jié)制閘設(shè)計(jì).doc
- 泗源溝節(jié)制閘設(shè)計(jì).doc
- 澮塘溝節(jié)制閘施組
- 徐洪河節(jié)制閘畢業(yè)設(shè)計(jì)
- 節(jié)制閘-進(jìn)水閘施工方案
- 南通節(jié)制閘監(jiān)控設(shè)施更新工程
- 節(jié)制閘分部工程施工方案
- 節(jié)制閘、進(jìn)水閘施工工藝
- 淺談節(jié)制閘閘墩裂縫成因分析與防治措施
- 泗源溝節(jié)制閘畢業(yè)設(shè)計(jì)
- 泗源溝節(jié)制閘設(shè)計(jì)畢業(yè)設(shè)計(jì)
- 淺談plc在水利節(jié)制閘中的應(yīng)用
- 節(jié)制閘工程施工組織設(shè)計(jì)
- 彎道節(jié)制閘水工模型試驗(yàn)研究.pdf
評論
0/150
提交評論