1、<p><b>  文獻(xiàn)綜述</b></p><p>  摘要:隨著工業(yè)時(shí)代的發(fā)展,電力已成為人類(lèi)歷史發(fā)展的主要?jiǎng)恿Y源,要科學(xué)合理的駕馭電力必須從電力工程的設(shè)計(jì)原則和方法上理解和掌握其精髓,提高電力系統(tǒng)的安全可靠性和運(yùn)行效率。從而達(dá)到降低生產(chǎn)成本提高經(jīng)濟(jì)效益的目的。變電所是電力系統(tǒng)的重要組成部分,它直接影響整個(gè)電力系統(tǒng)的安全與經(jīng)濟(jì)運(yùn)行,是聯(lián)系發(fā)電廠(chǎng)和用戶(hù)的中間環(huán)節(jié),起著變換和分配

2、電能的作用。目前,國(guó)內(nèi)110kv及以下中低壓變電所,主接線(xiàn)為了安全,可靠起見(jiàn)多選單母線(xiàn)接線(xiàn)。另外,合理的選擇各種一次設(shè)備也能夠提高變電所的安全系數(shù)及其經(jīng)濟(jì)性。</p><p>  關(guān)鍵詞:變電所 安全 可靠 經(jīng)濟(jì)</p><p>  電能是發(fā)展國(guó)民經(jīng)濟(jì)的基礎(chǔ),是一種無(wú)形的、不能大量存儲(chǔ)的二次能源,同時(shí)也是現(xiàn)代社會(huì)中最重要也是最方便的能源。[3]電能的發(fā)、變、送、配電和用電,幾乎是在同一

3、時(shí)間完成的,須相互協(xié)調(diào)與平衡。[2]變電和配電是為了電能的傳輸和合理的分配,在電力系統(tǒng)中占很重要的地位,其都是由電力變壓器來(lái)完成的,因此變電所在供電系統(tǒng)中的作用是不言而語(yǔ)的。</p><p>  變電所是聯(lián)系發(fā)電廠(chǎng)和用戶(hù)的中間環(huán)節(jié),起著變換和分配電能的作用?!?】因此,變電所的作用顯得有為重要。首先要滿(mǎn)足的就是變電所的設(shè)計(jì)規(guī)范。安全可靠地發(fā)、供電是對(duì)電力系統(tǒng)運(yùn)行的首要要求。[10]</p><

4、p> ?。?)變電所的設(shè)計(jì)要認(rèn)真執(zhí)行國(guó)家的有關(guān)技術(shù)經(jīng)濟(jì)政策,符合安全可靠、技術(shù)先進(jìn)和經(jīng)濟(jì)合理的要求。(2)變電所的設(shè)計(jì)應(yīng)根據(jù)工程的5~10年發(fā)展規(guī)劃進(jìn)行,做到遠(yuǎn)、近期結(jié)合,以近期為主,正確處理近期建設(shè)與遠(yuǎn)期發(fā)展的關(guān)系,適當(dāng)考慮擴(kuò)建的可能。(3)變電縮的設(shè)計(jì),必須從全局出發(fā),統(tǒng)籌兼顧,按照負(fù)荷性質(zhì)、用電容量、工程特點(diǎn)和地區(qū)供電條件,結(jié)合國(guó)情合理的確定設(shè)計(jì)方案。(4)變電所的設(shè)計(jì),必須堅(jiān)持節(jié)約用地的原則。其次,變電所所址的選擇,應(yīng)根據(jù)

5、要求,綜合考慮確定。[1]</p><p>  設(shè)計(jì)一所安全、經(jīng)濟(jì)、靈活的變電站可以從以下幾個(gè)方面著手。</p><p>  電氣主接線(xiàn)方案的選定</p><p>  電氣主接線(xiàn)是整個(gè)變電所電氣部分的主干。變電所電氣主接線(xiàn)指的是變電所中匯集、分配電能的電路,通常稱(chēng)為變電所一次接線(xiàn),是由變壓器、斷路器、隔離開(kāi)關(guān)、互感器、母線(xiàn)、避雷器等電氣設(shè)備按一定順序連接而成的。[4

6、]它是電力系統(tǒng)總體設(shè)計(jì)的重要組成部份。變電站主接線(xiàn)形式應(yīng)根據(jù)變電站在電力系統(tǒng)中的地位、作用、回路數(shù)、設(shè)備特點(diǎn)及負(fù)荷性質(zhì)等條件確定,并且應(yīng)滿(mǎn)足運(yùn)行可靠、簡(jiǎn)單靈活、操作方便和節(jié)約投資等要求。[2]主接線(xiàn)設(shè)計(jì)的基本要求為:</p><p>  (1)供電可靠性。主接線(xiàn)的設(shè)計(jì)首先應(yīng)滿(mǎn)足這一要求;當(dāng)系統(tǒng)發(fā)生故障時(shí),要求停電范圍小,恢復(fù)供電快。</p><p>  (2)適應(yīng)性和靈活性。能適應(yīng)一定時(shí)

7、期內(nèi)沒(méi)有預(yù)計(jì)到的負(fù)荷水平變化;改變運(yùn)行方式時(shí)操作方便,便于變電站的擴(kuò)建。</p><p>  (3)經(jīng)濟(jì)性。在確保供電可靠、滿(mǎn)足電能質(zhì)量的前提下,要盡量節(jié)省建設(shè)投資和運(yùn)行費(fèi)用,減少用地面積。</p><p>  (4)簡(jiǎn)化主接線(xiàn)。配網(wǎng)自動(dòng)化、變電站無(wú)人化是現(xiàn)代電網(wǎng)發(fā)展必然趨勢(shì),簡(jiǎn)化主接線(xiàn)為這一技術(shù)全面實(shí)施,創(chuàng)造更為有利的條件。</p><p>  (5)設(shè)計(jì)標(biāo)

8、準(zhǔn)化。同類(lèi)型變電站采用相同的主接線(xiàn)形式,可使主接線(xiàn)規(guī)范化、標(biāo)準(zhǔn)化,有利于系統(tǒng)運(yùn)行和設(shè)備檢修。[1]</p><p>  隨著電力系統(tǒng)的發(fā)展、調(diào)度自動(dòng)化水平的提高及新設(shè)備新技術(shù)的廣泛應(yīng)用,變電站電氣主接線(xiàn)形式亦有了很大變化。目前常用的主接線(xiàn)形式有:?jiǎn)文妇€(xiàn)、單母線(xiàn)分段、單母線(xiàn)分段帶旁路、雙母線(xiàn)、雙母線(xiàn)分段帶旁路、1個(gè)半斷路器接線(xiàn)、橋形接線(xiàn)及線(xiàn)路變壓器組接線(xiàn)等。[6]</p><p>  19

9、97年后建成的變電站中接線(xiàn)型式以單母、橋形和線(xiàn)路變壓器組為主。達(dá)到了85%。而帶旁路母線(xiàn)的,接線(xiàn)型式只有1座,僅占5%。[5]我國(guó)變電站設(shè)計(jì)開(kāi)始趨向于變電站接線(xiàn)方案簡(jiǎn)單,近期國(guó)內(nèi)新建的許多變電站220 k V及110kV電壓等級(jí)的接線(xiàn)采用雙母線(xiàn)而不帶旁路母線(xiàn)。采用GIS的情況下,優(yōu)先采用單母線(xiàn)分段接線(xiàn)。終端變電站中,盡量采用線(xiàn)路變壓器組接線(xiàn)等。大量采用新的技術(shù),變電站電氣設(shè)備檔次不斷提高,配電裝置也從傳統(tǒng)的形式走向無(wú)油化、真空開(kāi)關(guān)、SF

10、6開(kāi)關(guān)和機(jī)、電組合一體化的小型設(shè)備發(fā)展。從形式上看,主接線(xiàn)的發(fā)展過(guò)程是由簡(jiǎn)單到復(fù)雜,再由復(fù)雜到簡(jiǎn)單的過(guò)程。在70年代,由于當(dāng)時(shí)受電氣設(shè)備制造技術(shù)、通信技術(shù)和控制技術(shù)等條件的制約,為了提高系統(tǒng)供電可靠性,產(chǎn)生了從簡(jiǎn)單到復(fù)雜的主接線(xiàn)演變過(guò)程。在當(dāng)今的技術(shù)環(huán)境中,隨著新技術(shù)、高質(zhì)量電氣產(chǎn)品廣泛應(yīng)用,在某些條件下采用簡(jiǎn)單主接線(xiàn)方式比復(fù)雜主接線(xiàn)方式更可靠、更安全,變電站主接線(xiàn)日趨簡(jiǎn)化。因此,變電站電氣主接線(xiàn)形式應(yīng)根據(jù)可靠性、靈活性、經(jīng)濟(jì)性及技術(shù)環(huán)

11、境統(tǒng)一性來(lái)決定。</p><p>  電氣主接線(xiàn)方案的選定對(duì)變電所電氣設(shè)備的選擇,現(xiàn)場(chǎng)布置,保護(hù)與控制所采取的方式,運(yùn)行的可靠性、靈活性、經(jīng)濟(jì)性,檢修、運(yùn)行維護(hù)的安全性等,都有直接的影響,因此,選擇優(yōu)化的電氣主接線(xiàn)方式,具有特別重要的意義。</p><p>  選擇更安全可靠的一次電氣設(shè)備。</p><p>  變電所主要電氣設(shè)備及其作用:</p>&

12、lt;p> ?。?)高壓斷路器(或稱(chēng)高壓開(kāi)關(guān))線(xiàn)路正常時(shí),用來(lái)通斷負(fù)荷電流;線(xiàn)路故障時(shí),用來(lái)切斷巨大的短路電流。斷路器具有良好的滅弧裝置和較強(qiáng)的滅弧能力。按滅弧介質(zhì)劃分,斷路器分為油斷路器、空氣斷路器、SF6斷路器等。</p><p> ?。?)負(fù)荷開(kāi)關(guān) 線(xiàn)路正常時(shí),用來(lái)通斷負(fù)荷電流,但不能用來(lái)切斷短路電流。負(fù)荷開(kāi)關(guān)只有簡(jiǎn)易的滅弧裝置,其滅弧能力有限。負(fù)荷開(kāi)關(guān)在斷開(kāi)后具有明顯的斷開(kāi)點(diǎn)。</p>

13、<p> ?。?)隔離開(kāi)關(guān)(或稱(chēng)高壓刀閘)隔離開(kāi)關(guān)沒(méi)有滅弧裝置,其滅弧能力很小。僅當(dāng)電氣設(shè)備停電檢修時(shí),用來(lái)隔離電源,造成一個(gè)明顯的斷開(kāi)點(diǎn),以保證檢修人員的工作安全。</p><p>  (4)高壓熔斷器 在過(guò)負(fù)荷或短路時(shí),能利用熔體熔斷來(lái)切除故障。在某些情況下,熔斷器可與負(fù)荷開(kāi)關(guān)或隔離開(kāi)關(guān)配合使用,以代替價(jià)格昂貴的高壓斷路器,以節(jié)約工程投資。[17]</p><p>  (5

14、)電流互感器 將主回路中的大電流變換為小電流,供計(jì)量和繼電保護(hù)用。電流互感器二次側(cè)額定電流通常為5A或1A,[16]使用中二次側(cè)不允許開(kāi)路。</p><p> ?。?)電壓互感器 將高電壓變換成低電壓,供計(jì)量和繼電保護(hù)用。電壓互感器二次側(cè)額定電壓通常為100V,[16]使用中二次側(cè)不允許短路。</p><p> ?。?)避雷器 避雷器主要用來(lái)抑制架空線(xiàn)路和配電母線(xiàn)上的雷電過(guò)電壓可操作過(guò)電壓

15、,以保護(hù)電器設(shè)備免受損害。</p><p> ?。?)所用變壓器 向變電所內(nèi)部動(dòng)力及照明負(fù)荷、操作電源提供電力。[8]</p><p>  如上所述,各種電器對(duì)我們的變電站設(shè)計(jì)都有至關(guān)重要的作用。所以合理的配置是關(guān)鍵中的關(guān)鍵。</p><p>  首先就要說(shuō)到具備更高可靠性的SF6和真空斷路器全面取代少油或多油式斷路器。設(shè)置旁路設(shè)施的目的是為了減少在斷路器檢修時(shí)對(duì)用

16、戶(hù)供電的影響。SF6斷路器和真空斷路器的檢修周期可長(zhǎng)達(dá)20年,在變電所中選用了SF6斷路器和真空斷路器后,斷路器檢修幾率大為減少,提高單回線(xiàn)路供電可靠性的根本措施轉(zhuǎn)變?yōu)榻ㄔO(shè)第二供電回路.因?yàn)樵趩位鼐€(xiàn)路供電情況下中斷供電的主要因素已經(jīng)是線(xiàn)路故障.而不是斷路器檢修。故隨著近十多年來(lái)SF6和真空斷路器在110kV變電站中的普遍應(yīng)用,帶旁路母線(xiàn)的接線(xiàn)方式在110kV及其以下電壓等級(jí)已告別了歷史舞臺(tái)。其他設(shè)備我們也應(yīng)該按照計(jì)算和設(shè)計(jì)的需要合理選擇

17、,從而保證安全性和經(jīng)濟(jì)性。</p><p><b>  1、隔離開(kāi)關(guān)的配置</b></p><p> ?。?)中小型發(fā)電機(jī)出口一般應(yīng)裝設(shè)隔離開(kāi)關(guān):容量為220MW及以上大機(jī)組與雙繞組變壓器為單元連接時(shí),其出口不裝設(shè)隔離開(kāi)關(guān),但應(yīng)有可拆連接點(diǎn)。[11]</p><p> ?。?)在出線(xiàn)上裝設(shè)電抗器的6—10KV配電裝置中,當(dāng)向不同用戶(hù)供電的兩回線(xiàn)

18、共用一臺(tái)斷路器和一組電抗器時(shí),每回線(xiàn)上應(yīng)各裝設(shè)一組出線(xiàn)隔離開(kāi)關(guān)。[11]</p><p>  (3)接在發(fā)電機(jī)、變壓器因出線(xiàn)或中性點(diǎn)上的避雷器不可裝設(shè)隔離開(kāi)關(guān)。</p><p> ?。?)中性點(diǎn)直接接地的普通型變壓器均應(yīng)通過(guò)隔離開(kāi)關(guān)接地;自藕變壓器的中性點(diǎn)則不必裝設(shè)隔離開(kāi)關(guān)。[12]</p><p>  2、電壓互感器的配置</p><p>

19、  (1)電壓互感器的數(shù)量和配置與主接線(xiàn)方式有關(guān),并應(yīng)滿(mǎn)足測(cè)量、保護(hù)、同期和自動(dòng)裝置的要求。電壓互感器的配置應(yīng)能保證在運(yùn)行方式改變時(shí),保護(hù)裝置不得失壓,同期點(diǎn)的兩側(cè)都能提取到電壓。[11]</p><p> ?。?)6—220KV電壓等級(jí)的每組母線(xiàn)的三相上應(yīng)裝設(shè)電壓互感器。旁路母線(xiàn)上是否需要裝設(shè)電壓互感器,應(yīng)視各回出線(xiàn)外側(cè)裝設(shè)電壓互感器的情況和需要確定。[11]</p><p> ?。?)

20、當(dāng)需要監(jiān)視和檢測(cè)線(xiàn)路側(cè)有無(wú)電壓時(shí),出線(xiàn)側(cè)的一相上應(yīng)裝設(shè)電壓互感器。[15]</p><p> ?。?)當(dāng)需要在330KV及以下主變壓器回路中提取電壓時(shí),可盡量利用變壓器電容式套管上的電壓抽取裝置。[15]</p><p>  3、電流互感器的配置</p><p>  (1)凡裝有斷路器的回路均應(yīng)裝設(shè)電流互感器其數(shù)量應(yīng)滿(mǎn)足測(cè)量?jī)x表、保護(hù)和自動(dòng)裝置要求。</p&g

21、t;<p>  (2)在未設(shè)斷路器的下列地點(diǎn)也應(yīng)裝設(shè)電流互感器:發(fā)電機(jī)和變壓器的中性點(diǎn)、發(fā)電機(jī)和變壓器的出口、橋形接線(xiàn)的跨條上等。</p><p> ?。?)對(duì)直接接地系統(tǒng),一般按三相配置。對(duì)非直接接地系統(tǒng),依具體要求按兩相或三相配置。</p><p> ?。?)一臺(tái)半斷路器接線(xiàn)中,線(xiàn)路—線(xiàn)路串可裝設(shè)四組電流互感器,在能滿(mǎn)足保護(hù)和測(cè)量要求的條件下也可裝設(shè)三組電流互感器。線(xiàn)路—

22、變壓器串,當(dāng)變壓器的套管電流互感器可以利用時(shí),可裝設(shè)三組電流互感器。[11]</p><p><b>  4、避雷器的裝置</b></p><p> ?。?)配電裝置的每組母線(xiàn)上,應(yīng)裝設(shè)避雷器,但進(jìn)出線(xiàn)裝設(shè)避雷器時(shí)除外。</p><p>  (2)旁路母線(xiàn)上是否需要裝設(shè)避雷器,應(yīng)視在旁路母線(xiàn)投入運(yùn)行時(shí),避雷器到被保護(hù)設(shè)備的電氣距離是否滿(mǎn)足要求而

23、定。</p><p> ?。?)220KV及以下變壓器到避雷器的電氣距離超過(guò)允許值時(shí),應(yīng)在變壓器附近增設(shè)一組避雷器。</p><p> ?。?)三繞組變壓器低壓側(cè)的一相上宜設(shè)置一臺(tái)避雷器。</p><p> ?。?)下列情況的變壓器中性點(diǎn)應(yīng)裝設(shè)避雷器</p><p>  1) 直接接地系統(tǒng)中,變壓器中性點(diǎn)為分級(jí)絕緣且裝有隔離開(kāi)關(guān)時(shí)。<

24、;/p><p>  直接接地系統(tǒng)中,變壓器中性點(diǎn)為全絕緣,但變電所為單進(jìn)線(xiàn)且為</p><p><b>  單臺(tái)變壓器運(yùn)行時(shí)。</b></p><p>  3) 接地和經(jīng)消弧線(xiàn)圈接地系統(tǒng)中,多雷區(qū)的單進(jìn)線(xiàn)變壓器中性點(diǎn)上。</p><p> ?。?)發(fā)電廠(chǎng)變電所35KV及以上電纜進(jìn)線(xiàn)段,在電纜與架空線(xiàn)的連接處應(yīng)裝設(shè)避雷器。

25、</p><p> ?。?)SF6全封閉電器的架空線(xiàn)路側(cè)必須裝設(shè)避雷器。</p><p> ?。?)110—220KV線(xiàn)路側(cè)一般不裝設(shè)避雷器。[11]</p><p>  三、做好變電站的防雷和保護(hù)接地</p><p>  變電所的防雷設(shè)計(jì)應(yīng)做到設(shè)備先進(jìn)、保護(hù)動(dòng)作靈敏、安全可靠、維護(hù)試驗(yàn)方便,并在在保證可靠性的前提下力求經(jīng)濟(jì)性。[14]防止雷

26、電直擊的主要電氣設(shè)備是避雷針,避雷針由接閃器和引下線(xiàn)、接地裝置等構(gòu)成。[13]避雷針的位置確定,是變電所防雷設(shè)計(jì)的關(guān)鍵步驟。首先應(yīng)根據(jù)變電所電氣設(shè)備的總平面布置圖確定,避雷針的初步選定安裝位置與設(shè)備的電氣距離應(yīng)符合各種規(guī)程范圍的要求,初步確定避雷針的安裝位置后再根據(jù)公式進(jìn)行,校驗(yàn)是否在保護(hù)范圍之內(nèi)。[13]同時(shí)做好變電站的接地電網(wǎng),也可以有效的防止電力事故的發(fā)生。</p><p><b>  四、所用變

27、的設(shè)置</b></p><p>  為保證重要變電所的安全用電,所以需裝設(shè)兩臺(tái)所用變以備用。為了保證供電的可靠性應(yīng)在低電壓等級(jí)即10KV母線(xiàn)上各裝設(shè)一臺(tái)變壓器(每段各一臺(tái))。這樣就可以避免由于低壓線(xiàn)路故障率較高所引起的所內(nèi)停電事故,從而保證變電所的不間斷供電。[11]</p><p><b>  五、繼電保護(hù)的配置</b></p><p

28、>  在電力系統(tǒng)的運(yùn)行中,變電所可能出現(xiàn)各種故障和不正常運(yùn)行狀態(tài)。最常見(jiàn)同時(shí)也是最危險(xiǎn)的故障是各種類(lèi)型的短路,其中包括相間短路和接地短路。此外,還可能發(fā)生輸電線(xiàn)路斷線(xiàn),旋轉(zhuǎn)電機(jī)、變壓器同一繞組的匝間短路等,這樣,供電系統(tǒng)就不能順利完成輸送電。此時(shí),繼電保護(hù)就顯的很重要。繼電保護(hù)系統(tǒng)的主要作用:保護(hù)作用、控制作用 、監(jiān)視作用 、事故分析與事故處理作用、自動(dòng)化作用。繼電保護(hù)裝置在電力系統(tǒng)中的主要作用是通過(guò)預(yù)防事故或縮小事故范圍來(lái)提高系

29、統(tǒng)可靠性,是電力系統(tǒng)中重要的組成部分,是保證電力系統(tǒng)安全可靠運(yùn)行的重要技術(shù)措施之一。在現(xiàn)在電力系統(tǒng)中,如果沒(méi)有繼電保護(hù)裝置,就無(wú)法維持系統(tǒng)正常運(yùn)行。[7]</p><p>  鑒于其在系統(tǒng)中的重要性,有如下要求:(1)選擇性,即僅將故障元件從系統(tǒng)中切除,保證非故障元件正常運(yùn)行,提高系統(tǒng)供電可靠性;(2)速動(dòng)性,快速地切除故障元件可以提高系統(tǒng)并列運(yùn)行的可靠性,減少用戶(hù)在電壓降低的情況下的工作時(shí)間,以縮小故障元件的損

30、壞程度。只要求速動(dòng)性是不行的,要根據(jù)電力系統(tǒng)的接線(xiàn)以及被保護(hù)元件的具體情況來(lái)確定,例如當(dāng)發(fā)電廠(chǎng)或母線(xiàn)電壓低于允許值時(shí),繼電保護(hù)動(dòng)作等;(3)靈敏性,它要求保護(hù)裝置在事先規(guī)定的保護(hù)范圍內(nèi)發(fā)生故障時(shí),不論短路點(diǎn)的位置,短路類(lèi)型,以及短路點(diǎn)是否有過(guò)渡電阻,都應(yīng)敏銳感覺(jué),正確反應(yīng);(4)可靠性,它主要針對(duì)保護(hù)裝置本身的質(zhì)量和運(yùn)行維護(hù)水平而言,一般來(lái)說(shuō),保護(hù)裝置的組成元件的質(zhì)量越高,回路中繼電器的觸電就越少,保護(hù)裝置的可靠性就越高,同時(shí),正確的設(shè)

31、計(jì)和整定計(jì)算,保證安裝、調(diào)試試驗(yàn)的質(zhì)量,提高運(yùn)行維護(hù)水平,對(duì)提高保護(hù)裝置的可靠性有重要作用。[9]因此在電氣設(shè)計(jì)中將繼電保護(hù)配置好是一個(gè)很重要的環(huán)節(jié),同時(shí)我們應(yīng)該按照要求進(jìn)行合理配置。</p><p>  現(xiàn)如今在我國(guó),變電所設(shè)計(jì)還存在很多不足,面臨很多問(wèn)題比如損耗和可靠性問(wèn)題。我國(guó)經(jīng)濟(jì)的發(fā)展也電力帶來(lái)了很多問(wèn)題比如:1、對(duì)電能的需求日益增長(zhǎng),城市和農(nóng)村用電密度每天都在變化,所以給變電所的容量設(shè)計(jì)帶來(lái)了很多麻煩。

32、2、我國(guó)國(guó)土面積大,尤其是西北地區(qū)電力用戶(hù)較分散,電力的傳輸需要導(dǎo)線(xiàn),這樣就會(huì)使線(xiàn)路的功率損耗增加。3、建立穩(wěn)定的變電所必須占用較大的土地,然而在城市土地單價(jià)昂貴環(huán)境要求嚴(yán)格在用電用戶(hù)稠密的地域建設(shè)變電所相對(duì)較困難,從而增加了在線(xiàn)路上的電能損耗。以上所說(shuō)的問(wèn)題都是我國(guó)先目前變電手面臨的問(wèn)題,這些問(wèn)題正期待我們的解決。[2]</p><p>  如果上面所述的部分我們都能夠很好的綜合考慮那么變電站的初步設(shè)計(jì)就會(huì)相對(duì)

33、來(lái)說(shuō)比較安全經(jīng)濟(jì)。這也就達(dá)到我們的提高電力系統(tǒng)的安全可靠性和運(yùn)行效率,從而達(dá)到降低生產(chǎn)成本提高經(jīng)濟(jì)效益的目的。</p><p>  結(jié)束語(yǔ):電網(wǎng)運(yùn)行的最基本要求是安全與穩(wěn)定。電網(wǎng)安全穩(wěn)定的核心問(wèn)題是要建立一個(gè)與該供電網(wǎng)絡(luò)相適應(yīng)的、合理的電網(wǎng)結(jié)構(gòu)。[19]110kV電力網(wǎng)絡(luò)和變電站在系統(tǒng)中的地位和功能發(fā)生了很大變化。110kV電力網(wǎng)絡(luò)已下降為配電網(wǎng)絡(luò),大多數(shù)110KV變電站也淪為負(fù)荷型的終端變電站。[5]配電電壓升

34、高,電力系統(tǒng)安全更要時(shí)刻抓緊。建設(shè)變電站時(shí),在保證安全的前提下還要保證其經(jīng)濟(jì)性和靈活性。隨著電力人不斷的努力,變電站的設(shè)計(jì)一定會(huì)不斷完善的。 </p><p><b>  參考文獻(xiàn)</b></p><p>  [1] 35~110KV 變電所設(shè)計(jì)規(guī)范 GB50059-92</p><p>  [2]熊信銀 范錫普《發(fā)電廠(chǎng)電氣部分》

35、 中國(guó)電力出版社</p><p>  [3] 何仰贊 溫增銀 《電力系統(tǒng)分析》(上、下冊(cè)) 華中科技大學(xué)出版社</p><p>  [4] 熊信銀 張步涵 《電氣工程基礎(chǔ)》 華中科技大學(xué)出版社</p><p>  [5] 蔡偉君 電站電氣裝置型式變化情況及前景探討 《廣東科技》&l

36、t;/p><p>  [6]李景祿 《實(shí)用配電網(wǎng)技術(shù)》 中國(guó)水利水電出版社</p><p>  [7]國(guó)家電力調(diào)度通信中心組編 《發(fā)電機(jī)變壓器繼電保護(hù)應(yīng)用》中國(guó)電力出版社</p><p>  [8]卓樂(lè)友 《電力工程電氣設(shè)計(jì)》 中國(guó)電力出版社</p><p

37、>  [9]劉學(xué)軍 《繼電保護(hù)原理》 中國(guó)電力出版社</p><p>  [10]南京工學(xué)院 《電力系統(tǒng)》 電力工業(yè)出版社</p><p>  [11]國(guó)家電力公司農(nóng)電工作部 《35kv及以上工程》(上、下) 電力工業(yè)出版社</p><p>  

38、[12]西安理工大學(xué) 余健明 同向前 蘇文成 《供電技術(shù)》 機(jī)械工業(yè)出版社</p><p>  [13]胡國(guó)根 王戰(zhàn)鐸 《高電壓技術(shù)》 重慶大學(xué)出版社</p><p>  [14]郭仲禮 于曰浩 《高壓電工實(shí)用技術(shù)》 機(jī)械工業(yè)出版社</p><p>  [15]隋振有 《中低壓

39、配電實(shí)用技術(shù)》 機(jī)械工業(yè)出版社</p><p>  [16]王寧會(huì) 《電氣工程常用數(shù)據(jù)速查手冊(cè)》 中國(guó)建材工業(yè)出版社</p><p>  [17] 劉從愛(ài) 徐中立《電力工程》 機(jī)械工業(yè)出版社</p><p>  [18] J.Duncan Glove

40、r,Power System Analysis and Design,China Machine Press.2004</p><p>  [19] Zhu Bangshen China Safety Science Journal , China Science Press .2004</p><p><b>  英文文獻(xiàn)</b></p><p&

41、gt;<b>  Summary: </b></p><p>  Power System Substation is an important and indispensable component of the power it assumed the task of conversion and distribution of grid security and the economy

42、 play a decisive role in running is to contact the user's power plants and intermediate links. With economic development, expanding grid capacity, reliability of operation of the power grid is getting higher and high

43、er requirements. Development of science and technology, intelligent switches, photoelectric current and voltage transfor</p><p>  Keywords: substation automation</p><p>  Power system is operate

44、d by the production, transmission, distribution and consumption of a variety of power linked to the composition of electrical equipment. As a result of a large number of power can not be stored, we must ensure that the p

45、roduction of electricity and energy balance. With the scientific and technological advances in the technological development of our country has reached a certain level. Intelligent switches, photoelectric current and vol

46、tage transformer, a run-line state de</p><p>  Design of our substation substation cable programs tend to be simple, many of the recent domestic new 220 k V substation and 110kV voltage levels of wiring with

47、out the use of dual-bus bypass bus. The use of GIS, the priority sub-bus single wire. Terminal Substation, the line as far as possible, such as transformer unit wiring. A large number of the introduction of new technolog

48、y, transformer substation rising level of electrical equipment, power distribution devices from the traditional form of </p><p>  With technological advances, the traditional relay protection devices are gra

49、dually being replaced by microprocessor-based protection. Microprocessor-based protection is referred to as the protection of PC computer, a digital relay protection, is based on the programmable digital circuit technolo

50、gy and real-time digital signal processing technology of the Power System Protection. At present, both at home and abroad have been developed to 32-bit digital signal processor for hardware-based protect</p><p

51、><b>  譯文:</b></p><p>  變電站是電力系統(tǒng)中不可缺少的重要組成部分,它擔(dān)負(fù)著電能轉(zhuǎn)換和分配的任務(wù),對(duì)電網(wǎng)的安全和經(jīng)濟(jì)運(yùn)行起著舉足輕重的作用,是聯(lián)系發(fā)電廠(chǎng)和用戶(hù)的中間環(huán)節(jié)。隨著經(jīng)濟(jì)的發(fā)展,電網(wǎng)容量不斷擴(kuò)大,對(duì)電網(wǎng)運(yùn)行的可靠性要求也越來(lái)越高??茖W(xué)技術(shù)的發(fā)展、智能化開(kāi)關(guān),光電式電流電壓互感器,一次運(yùn)行設(shè)備在線(xiàn)狀態(tài)檢測(cè),變電站運(yùn)行操作培訓(xùn)仿真等高新技術(shù)日趨成熟,以及光纖

52、技術(shù)、計(jì)算機(jī)高速網(wǎng)絡(luò)在實(shí)時(shí)系統(tǒng)中的開(kāi)發(fā)應(yīng)用,勢(shì)必對(duì)現(xiàn)有的變電站自動(dòng)化技術(shù)產(chǎn)生深刻的影響,全數(shù)字化的變電站自動(dòng)化系統(tǒng)成為發(fā)展的趨勢(shì)。</p><p>  關(guān)鍵詞:變電站 自動(dòng)化</p><p>  電力系統(tǒng)是由生產(chǎn)、輸送、分配和消費(fèi)電能的各種電氣設(shè)備連接在一起組成。由于電能無(wú)法大量?jī)?chǔ)存,必須保證用電和電能生產(chǎn)的平衡。隨著科學(xué)技術(shù)的不斷進(jìn)步,我們國(guó)家的技術(shù)發(fā)展已經(jīng)達(dá)到一定的水平。智能化開(kāi)關(guān),光

53、電式電流電壓互感器,一次運(yùn)行設(shè)備在線(xiàn)狀態(tài)檢測(cè),變電站運(yùn)行操作培訓(xùn)仿真等高新技術(shù)日趨成熟,以及光纖技術(shù)、計(jì)算機(jī)高速網(wǎng)絡(luò)在實(shí)時(shí)系統(tǒng)中的開(kāi)發(fā)應(yīng)用,大大的提高變電自動(dòng)化程度。</p><p>  我國(guó)變電站設(shè)計(jì)開(kāi)始趨向于變電站接線(xiàn)方案簡(jiǎn)單,近期國(guó)內(nèi)新建的許多變電站220 k V及110kV電壓等級(jí)的接線(xiàn)采用雙母線(xiàn)而不帶旁路母線(xiàn)。采用GIS的情況下,優(yōu)先采用單母線(xiàn)分段接線(xiàn)。終端變電站中,盡量采用線(xiàn)路變壓器組接線(xiàn)等。大量采用

54、新的技術(shù),變電站電氣設(shè)備檔次不斷提高,配電裝置也從傳統(tǒng)的形式走向無(wú)油化、真空開(kāi)關(guān)、SF6開(kāi)關(guān)和機(jī)、電組合一體化的小型設(shè)備發(fā)展。近年來(lái)世界各國(guó)著名的高壓電氣設(shè)備公司都相繼開(kāi)發(fā)、研制了各種類(lèi)型的145-550 kV戶(hù)外高壓和超高壓組合電器,國(guó)內(nèi)一些高壓開(kāi)關(guān)廠(chǎng)也已經(jīng)開(kāi)始生產(chǎn)145 k V戶(hù)外緊湊型組合電器。戶(hù)外插接式智能型組合電器是一種功能更完備的高壓和超高壓開(kāi)關(guān)系統(tǒng),它內(nèi)含電氣一次、二次設(shè)備,以及相關(guān)連的插接式復(fù)合光纜等。全分散式變電站自動(dòng)

55、化系統(tǒng);引入先進(jìn)的網(wǎng)絡(luò)技術(shù);變電站占地及建筑面積減少,變電站接線(xiàn)方案的簡(jiǎn)化,組合電器、管母線(xiàn)及鋼支架等的采用,使變電站布置更為簡(jiǎn)單,取消站前區(qū)和優(yōu)化布置使變電站占地大幅度下降。</p><p>  隨著技術(shù)的進(jìn)步,傳統(tǒng)的繼電保護(hù)裝置正逐步被微機(jī)保護(hù)所取代。微機(jī)保護(hù)是微機(jī)計(jì)算機(jī)保護(hù)的簡(jiǎn)稱(chēng),是一種數(shù)字式繼電保護(hù),是基于可編程數(shù)字電路技術(shù)和實(shí)時(shí)數(shù)字信號(hào)處理技術(shù)實(shí)現(xiàn)的電力系統(tǒng)繼電保護(hù)。目前,國(guó)內(nèi)外已經(jīng)研制出以32位數(shù)字信

56、號(hào)處理器為硬件基礎(chǔ)的保護(hù)、控制、測(cè)量、及數(shù)據(jù)通信一體化的微機(jī)保護(hù)綜合控制裝置,并將一些人工智能技術(shù)引入繼電保護(hù)中,如用人工神經(jīng)網(wǎng)絡(luò)、模糊理論實(shí)現(xiàn)故障類(lèi)型判斷、故障測(cè)距、方向保護(hù)、主設(shè)備保護(hù)等新方法。用小波理論的數(shù)字手段分析故障產(chǎn)生信號(hào)的整個(gè)頻帶信息并用于實(shí)現(xiàn)故障檢測(cè)。這些人工智能技術(shù)不僅為提高故障判別精度提供了手段,而且使某些基于單一工頻信號(hào)的傳統(tǒng)算法難以識(shí)別的問(wèn)題得到解決。目前,微機(jī)繼電保護(hù)正沿著微機(jī)保護(hù)網(wǎng)絡(luò)化、智能化、自適應(yīng)和保護(hù)、

57、控制、測(cè)量、信號(hào)、數(shù)據(jù)通信一體化的方向發(fā)展。</p><p><b>  外文文獻(xiàn)二</b></p><p>  The most basic request that charged barbed wire net in the city circulates is safe and stable.The core problem of charged barbed

58、 wire net safety in the city stability wants to build up to be a with the city mutually accommodative of, reasonable of charged barbed wire net structure.This text passes and programs to the charged barbed wire net with

59、electric power and designs the technique principle of the aspect analysis.Elaborated the standard concerning electric voltage grade, power supply credib</p><p>  How to promise power supply credibility</p

60、><p>  1)Satisfy charged barbed wire net power supply safe standard.The power supply network satisfies the request of power supply credibility.The standard that all satisfies N-l, city area center high burden d

61、ensity important customer in the district satisfy the standard of N-2.Disallow transformer over carry.Help a southern city net power supply credibility rate index sign programming target is 99.99%.</p><p>  

62、2)Press to go together with charged barbed wire net burden to transfer ability in the city satisfy following request:</p><p>  ①The transformer substation loses any once enter line or one set lord transforme

63、r but lower power supply ability, win press to go together with charged barbed wire net to have to transfer burden to ensure the ability of power supply.</p><p>  ②When a female line of transformer substatio

64、n stops a luck because of putting, winning to press to go together with charged barbed wire net should have the ability that transfer all burden.</p><p> ?、踂hen the 10 kv goes together with electric wire roa

65、d any check to fix or breaks down, going together with the charged barbed wire net should have non- check of transfer to fix, non- breakdown segment ability for carrying.The non- check fixs,</p><p>  The non

66、- breakdown segment carries to the power is off time only for go together with to give or get an electric shock an equipments to pour a Zha operation for time.</p><p>  3)Ask to satisfy a following principle

67、 while allowing the capacity of the power outage and the target of the instauration power supply while going together with charged barbed wire net breakdown to make the customer the power is off:</p><p> ?、賂

68、he customer of two back track power supplies , after losing a back track, should be unlimited to give or get an electric shock.</p><p> ?、赥he customer of three back track power supplies , after losing a back

69、 track, should be unlimited to give or get an electric shock, again after losing a back track, should satisfy power supply capacity 50-70% is used an electricity.</p><p> ?、踂hen all of a back track or much c

70、ustomer's the power of back track power supplies stopped, resume target time of power supply broke down to handle for a back track restored of ask.</p><p> ?、蹵t wreath net power supply method in for open

71、 the customer in the wreath network, the lowest instauration power supply request for breaking down wreath net is to need to pass charged barbed wire net operation instauration</p><p>  Power supply of time,

72、 its target time need for operating of ask;It is the power supply that passes to go together with net automation restriction to resume an intact block in the lmin to go together with net automation circuit.</p>&l

73、t;p>  (3)Power supply ability and safety</p><p>  1)Of each electric voltage layer net capacity in the city net, press definitely change the electric capacity carry to compare an allocation, the all level

74、s electric voltage net changes the electric capacity carry compare satisfy the upper limit request that current 《electric power net in the city programming design lead 》 stipulates.</p><p>  According to 200

75、1 national economy trade committee promulgation of electric power profession standard 《electric power system safety stability lead 》 middle finger:N.a standard is under the normal movement method of the any component(is

76、like circuit, generator, and transformer...etc.) in the electric power system have no break down or because of break down break to open, electric power system should</p><p>  Can keep stable to circulate wit

77、h normal power supply, other components however carry, electric voltage and frequency all are allowing inside the scope.This is usually called N. one standard.</p><p>  The charged barbed wire net power supp

78、ly safe standard has:N-l standard and quasi- N one 2 standards and Ns is one 2 standards.</p><p>  City's going together with the power supply safety of charged barbed wire net to usually request is to a

79、dopt N one one standard.It is one 2 standards to have already adopted quasi- N as well at the power supply safety specially important place one 2 standards or Ns.</p><p>  2)Medium press and go together with

80、 charged barbed wire net and have certain back up capacity, generally should have 50% Yu degrees, while being any component check and fixing and breaking down and stopping and carrying should pass and pour a Zha operatio

81、n can keep a segment the customer continue toward the customer or non- trouble power supply, go together with each component of charged barbed wire net while transfering burden however carry, unlimited electricity.When

82、two set lords hanpen that</p><p>  譯文:城市電網(wǎng)運(yùn)行的最基本要求是安全與穩(wěn)定。城市電網(wǎng)安全穩(wěn)定的核心問(wèn)題是要建立一個(gè)與該城市相適應(yīng)的、合理的電網(wǎng)結(jié)構(gòu)。本文通過(guò)對(duì)電網(wǎng)規(guī)劃和電力設(shè)計(jì)方面的技術(shù)原則分析。闡述了在電網(wǎng)安全中關(guān)于電壓等級(jí)、供電可靠性、供電能力以及電網(wǎng)安全供電的準(zhǔn)則要求等方面應(yīng)注意的一些問(wèn)題;以及有針對(duì)性的闡述了對(duì)220kV變電站和110kV變電站的具體設(shè)計(jì)原則相對(duì)電網(wǎng)

83、安全供電的要求。</p><p><b>  如何保證供電可靠性</b></p><p>  1)滿(mǎn)足電網(wǎng)供電安全準(zhǔn)則。供電網(wǎng)絡(luò)滿(mǎn)足供電可靠性的要求。全部滿(mǎn)足N—l的準(zhǔn)則,城區(qū)中心高負(fù)荷密度區(qū)域重要用戶(hù)滿(mǎn)足N-2的準(zhǔn)則。不允許變壓器過(guò)載。濟(jì)南城網(wǎng)供電可靠率指標(biāo)規(guī)劃目標(biāo)為99.99%。</p><p>  2)城市中壓配電網(wǎng)負(fù)荷轉(zhuǎn)移能力滿(mǎn)足以下要

84、求:</p><p> ?、僮冸娬臼ト魏我换剡M(jìn)線(xiàn)或一臺(tái)主變壓器而降低供電能力時(shí),中壓配電網(wǎng)具有轉(zhuǎn)移負(fù)荷確保供電的能力。</p><p> ?、谧冸娬镜囊欢文妇€(xiàn)因放停運(yùn)時(shí),中壓配電網(wǎng)應(yīng)具有轉(zhuǎn)移全部負(fù)荷的能力。</p><p>  ③10kV配電線(xiàn)路任何一段檢修或故障時(shí),配電網(wǎng)應(yīng)具備轉(zhuǎn)移非檢修、非故障段負(fù)荷的能力。非檢修、非故障段負(fù)荷停電時(shí)間僅為配電設(shè)備倒閘操作時(shí)間。

85、</p><p>  3)配電網(wǎng)故障造成用戶(hù)停電時(shí),允許停電的容量和恢復(fù)供電的目標(biāo)時(shí)問(wèn)滿(mǎn)足以下原則:</p><p> ?、賰苫芈饭╇姷挠脩?hù),失去一條回路后,應(yīng)不限電。</p><p> ?、谌芈饭╇姷挠脩?hù),失去一條回路后,應(yīng)不限電,再失去一條回路后,應(yīng)滿(mǎn)足供電容量50-70%用電。</p><p> ?、垡换芈坊蚨嗷芈饭╇姷挠脩?hù)電源全停時(shí)

86、,恢復(fù)供電的目標(biāo)時(shí)間為一回路故障處理恢復(fù)的時(shí)問(wèn)。</p><p>  ④在環(huán)網(wǎng)供電方式中對(duì)于開(kāi)環(huán)網(wǎng)絡(luò)中的用戶(hù),環(huán)網(wǎng)故障時(shí)的最低恢復(fù)供電要求是需通過(guò)電網(wǎng)操作恢復(fù)供電的時(shí)間,其目標(biāo)時(shí)間為操作所需的時(shí)問(wèn);配網(wǎng)自動(dòng)化線(xiàn)路是通過(guò)配網(wǎng)自動(dòng)化限制在lmin內(nèi)恢復(fù)完好區(qū)段的供電。</p><p>  (3)供電能力和安全性</p><p>  1)城網(wǎng)中各電壓層網(wǎng)容量之間,按一定的

87、變電容載比配置,各級(jí)電壓網(wǎng)變電容載比滿(mǎn)足現(xiàn)行《城市電力網(wǎng)規(guī)劃設(shè)計(jì)導(dǎo)則》規(guī)定的上限要求。根據(jù)2001年國(guó)家經(jīng)濟(jì)貿(mào)易委員會(huì)頒布的電力行業(yè)標(biāo)準(zhǔn)《電力系統(tǒng)安全穩(wěn)定導(dǎo)則》中指出:N.1準(zhǔn)則為正常運(yùn)行方式下的電力系統(tǒng)中任一元件(如線(xiàn)路、發(fā)電機(jī)、變壓器等)無(wú)故障或因故障斷開(kāi),電力系統(tǒng)應(yīng)能保持穩(wěn)定運(yùn)行和正常供電,其他元件不過(guò)負(fù)荷,電壓和頻率均在允許范圍內(nèi)。這通常稱(chēng)為N.1準(zhǔn)則。電網(wǎng)供電安全準(zhǔn)則有:N—l準(zhǔn)則、準(zhǔn)N一2準(zhǔn)則和N一2準(zhǔn)則。城市配電網(wǎng)的供電安

溫馨提示

  • 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶(hù)所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 眾賞文庫(kù)僅提供信息存儲(chǔ)空間,僅對(duì)用戶(hù)上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶(hù)上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶(hù)因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

評(píng)論

0/150

提交評(píng)論