1、<p>  Highway engineering change reason</p><p>  analysis and cost of the project of influence</p><p>  Abstract: in the implementation stage because of highway engineering design factors,

2、environmental factors, the influence of various engineering changes happened is more common, combining with engineering practice, this paper discusses the causes and engineering change of project cost.</p><p&g

3、t;  Keywords: engineering change, Reason, Cost</p><p>  Due to the highway project period, long, long line, so broad in construction of various causes by the engineering change is inevitable. Engineering cha

4、nge could lead to increase of construction cost or time limit of the owner and the contractor, between the claim will claim and the cost of the project.</p><p>  Owner of change and the causes of the cost<

5、;/p><p>  And when the owner change engineering bidding of construction conditions of commitment. "SanTongYiPing" referred to in the preceding paragraph, the engineering tight finish, delay purpose wi

6、ll increase the contractor's settlement fee, but little impact on total cost, the owner or project quantity change projects. Increase the project content or quantity, will increase the cost, Project content or cancel

7、 or reduce the number will reduce cost, but may affect the use function of engineering, becaus</p><p>  The design of change and the causes of the cost</p><p>  The design adopts the new standar

8、d, new technology, new technology, to replace the original design of the project, and put to use more favorable for owner reduce project cost, the depth of the design documents, cannot satisfy the relevant provisions of

9、the relevant design phase of engineering change and requirements, cost increase or decrease, and when designing units in the preliminary design to fully consider the network planning, and in local government and related

10、departments (e.g., environm</p><p>  Tthe contractor to change and cause the influence. Cost</p><p>  The contractor is unable to perform the contract or can't completely, the contractor sha

11、ll take remedial measures proposed change, this kind of change of engineering cost, can increase by contractor burden loss, the contractor has been approved changes when bidding of construction project, this kind of cha

12、nge of cost, but almost no effect for the contractor may save construction cost, and the contractor for construction is convenient, or to shorten the construction period, or to reduce the inve</p><p>  the s

13、upervisor of change and the causes of the cost</p><p>  Supervision by the owner, commissioned by the cause of the change of the owner or expenses directly influence the cost. 1 and supervision engineer in o

14、rder to coordinate the contractor's operation, or section of this project contractors to coordinate with relevant departments or units where the relations of production, easy cause engineering change caused by increa

15、sed cost. the site supervision engineers in actual situation in the contract and the technical specification for the design, accordin</p><p>  The environment factors and impact on the cost of change</p&g

16、t;<p>  Engineering geology unknown or insufficiency in design, engineering cost increased to. and highway engineering construction projects from the construction, project feasibility study, design and constructio

17、n drawing design to construction, due to various reasons, the project in the declaration and approval process, some problems existing in the construction stage, these problems caused by exposure to change, and engineerin

18、g cost increase. and national policies, laws and regulations and standard, </p><p>  Highway engineering change of a variety of reasons, this means that the appraisal work for engineering changes are complex

19、 and difficult to decrease the cost, the change of the effects are also different. Through the analysis, is looking for engineering changes the various causes, and through the analysis of the cost control are not isolate

20、d, control cost, the key is to establish and perfect the scientific management system. Based on control cost, quality assurance and accelerate the progress, t</p><p>  公路工程變更原因分析及其對工程造價(jià)的影響</p><p&g

21、t;  摘要:公路工程在實(shí)施階段由于設(shè)計(jì)因素、環(huán)境因素等多方面的影響,發(fā)生工程變更是較常見的,文章結(jié)合工程實(shí)踐,探討工程變更的原因及其對工程造價(jià)的影響。   關(guān)鍵詞:工程變更;原因;造價(jià)影響   </p><p>  由于公路工程項(xiàng)目路線長、工期長、涉及面廣,因此在施工中由各種原因引起的工程變更也不可避免。工程變更可能導(dǎo)致建設(shè)費(fèi)用的增減或工期的延長,在業(yè)主和承包商之間會(huì)出現(xiàn)索賠和反索賠,使工程的造價(jià)發(fā)生變化。

22、</p><p>  一、業(yè)主原因引起變更及其對造價(jià)的影響    1、業(yè)主改變工程招標(biāo)時(shí)承諾的施工條件。如“三通一平”條件,本工程緊前項(xiàng)目的延遲完成等,會(huì)增加承包方的結(jié)算費(fèi)用,但對總造價(jià)影響很 ??;2、業(yè)主變更項(xiàng)目內(nèi)容或項(xiàng)目數(shù)量。增加項(xiàng)目內(nèi)容或者數(shù)量,會(huì)增加造價(jià);減少或取消項(xiàng)目內(nèi)容或數(shù)量會(huì)降低造價(jià),但可能影響工程的使用功能;3、因業(yè)主原 因同承包方簽訂的協(xié)議存在不完整之外,或在標(biāo)段劃分時(shí)出現(xiàn)遺漏內(nèi)容,會(huì)增加合同

23、外造價(jià);4、業(yè)主要求提前竣工交付,縮短原合同工期,導(dǎo)致施工單位投入更多 的人力和物力,使造價(jià)增加;5、業(yè)主要求提高原設(shè)計(jì)標(biāo)準(zhǔn),從安全美觀等角度要求改變工程結(jié)構(gòu)的型式、標(biāo)高、基線、位置、尺寸、強(qiáng)度等,使造價(jià)增加;6、業(yè) 主要求改變已在施工組織設(shè)計(jì)中被批準(zhǔn)的施工方案,使造價(jià)增加;7、業(yè)主對原合同中約定同業(yè)主供應(yīng)的材料或設(shè)備的種類或數(shù)量進(jìn)行增減,引起造價(jià)增加或減 少;8、業(yè)主的指定發(fā)包不合理,會(huì)使造價(jià)增加。 二、設(shè)計(jì)原因引起變更及其對造價(jià)的

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 眾賞文庫僅提供信息存儲(chǔ)空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論